HomeMy WebLinkAbout20230921.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROADS 74 AND 33 INTERSECTION FOR APPROXIMATELY
FOUR (4) MONTHS, FOR ROUNDABOUT CONSTRUCTION PROJECT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Roads 74 and 33 intersection, to through traffic and to regulate, warn
and guide vehicular traffic by posting signs thereon, with said closure being effective April 17,
2023, for approximately four (4) months for a roundabout construction project.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Roads 74 and 33 intersection, be temporarily
closed, with said closure being effective April 17, 2023, for approximately four (4) months for a
roundabout construction project, and further, that standard official traffic control devices shall be
erected at said closure giving notice of the restrictions.
cc;So(R5),D.spo1- k,CSP
o4/ii/23
2023-0921
EG0024
TEMPORARY CLOSURE - COUNTY ROADS 74 AND 33 INTERSECTION
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 3rd day of April, A.D., 2023.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: daYi44) ;„k,
Weld County Clerk to the Board
ount orney
Date of signature: O1 (I I/2
Milye-Fregeman, Chair
&,4e,a
2023-0921
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: March 29, 2023
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close the intersection of CR 74 and CR 33
beginning April 17, 2023 through August 14, 2023 for construction of roundabout. Submitted by
pass -around on March 27, 2023 for review and signature.
See attached closure diagram(s).
2023-0921
p4/03
e OD24-
LEGEND
I
1. SIGNS SHALL BE SPACED A MINIMUM OF 500' OR
AS INDICATED BY TRAFFIC CONTROL
SUPERVISOR.
7NOTES:
/
/
t
f`�l
/ - !
1
1 ! Li WCR 74 EASTBOUND DETOUR ROUTE
I
WCR 74 WESTBOUND DETOUR ROUTE
- -IIIMISIMINNIM
WCR 33 NORTHBOUND DETOUR ROUTE
TRAFFIC PLAN IS BASED ON COOT TRAFFIC
CONTROL FOR HIGHWAY CONSTRUCTION DETAIL
TYPICAL SIGNAGE FOR ROAD CLOSURE "CASE NO.
20" (S-630-1. SHEET 10 OF 24. DATED JULY 31, 2-19).
3. CONTRACTOR TO PLAN FOR 24/7 CLOSURE OF
INTERSECTION, FOR 100 DAYS (MAXIMUM).
4. ALL DEVICES SHALL MEET OR EXCEED MUTCD I
NCHRP 350 STANDARDS (LATEST EDITION). i
5. PRIVATE ACCESS IS TO BE MAINTAINED AT ALL I WCR 78
TIMES PROJECT
MESSAGE
• WCR 33 CLOSED
--/VARIABLE
BOARD �
AT WCR 74
L _ _ _ -
_ _ - _ _
__ _ _ _ _ _
I
WCR 33 SOUTHBOUND DETOUR ROUTE
IXf\QQ:1XPROJECT
LIMITS
- " -�
- - - - - - " - -- -.
I
CONTROL SUPERVISOR.
8. NO DETOURS WILL BE ALLOWED ON GRAVEL
WCR 74
VARIABLE MESSAGEi
ROADS.
EASTBOUND
DETOUR ROUTE
(PURPLE)
BOARD
•WCR 74 CLOSED
AT WCR 33
I
VARIABLE MESSAGE BOARD
I
t
I
J� (
II
I
• WCR 74 CLOSED AT
i t
WCR 33
PROJECT UNITS
1
■
}
WCR 74
_
EATON
CI
I
I
I
I
j
WCR 72 •-y1-___----
r
--
i
I
J
I
I
i'''''cirlasjatai
i I
I I
t I
-__
___ _--f-
i
I
I
, - -
--
I
I
d.l
CU:
I
--
------------------ --
1
)
1
I
70
WCR 33 NORTHBOUNDtill
DETOUR ROUTE
(CYAN)
WCR 33
SOUTHBOUND
DETOUR ROUTE
(GREEN)in
-
- - - -`?
-
___WCR
i' ----
U
M
N
U
�-
N N
rYl
N
U
_
C7
U
Cl
M
M
_ _
v
IX
o
IX
Ur U
VARIABLE MESSAGE
• WCR 33 CLOSED
iHWY
BOARD
ATWCR 74I
r
392
T OVERALL DETOUR
AND TRAFFIC CONTROL PLAN
- -"-
_
,f
(WCR 74 AND
WCR 33 INTERSECTION CLOSURE).
NOT TO SCALE
Computer File Information
Index of Revisions
WELD
COUNTY
-
As Constructed
WCR
DETOUR
74
/ 33 INTERSECTION
- OVERALL
PLAN
Project No./Code
Creation Dale. 10/21/2022 Initials CLW
Date
Comments
Initials'
No Revisions
PROJ. 23044, #STU CO30-078
Las: Modified Date 10/21/2022 Initials CLW
-
-
_
•-�, .,-/
PUBLIC WORKS DEPARTMENT
1111 H. STREET
Full Pain: iNTERSEC_o MwcC I N D WCR
33 SEcn Roo
h' ti r
;
—
IA P.O. BOX 758
Revised
Designer CLW
9
GR-55
Drawing File Name' WCR 33_DETOUR.DWG
Name: ETO R D
■
GREELEY, CO. 80632-0758
PHONE (970) 356-4000
Detailer CL W
Void
Sheet Number 186 of 224
AutoCAD Version, 2021 Scale AS VOTED Units. English
_
FAX: (970) 304-6497
Sheet Subset
Sheet Subset
LEGEND
y
-
WCR 74 EASTBOUND DETOUR ROUTE
WCR 74 WESTBOUIJO DETOUR ROUTE
PROJECT LIMITS
WCR 78
WCR 76
END
DETOUR
M4 -8A
WCR 74
DETOUR
1)
M4 -9R
DETOUR
M4 -9L
DETOUR
M4 -9R
PROJECT OMITS
W20-1
WCR 72
M4 -9L
al
t1
• _
ROAD CLOSED
TO
THRU TRAFFIC
R11-04
ROAD CLOSED
TO
THRU TRAFFIC
R11-04
nrToitn
(WCR
INN
cn
CC
U
DETOUR
M4 -9R
ROAD CLOSED
TO
THRU TRAFFIC
R11-04
DETOUR
M4 -9L
R11-2
////.
'////
////
Arran Tnarrin CflNTROI_ PLAN
74 - EAST/WEST CLOSURE)
NOT TO SCALE
DETOUR
1
M4 -9L
DETOUR
M4 -9R
.i
ROAD CLOSED
TO
THRU TRAFFIC
R11-04
////.
///
'////
I
•
W20 -2D
W20-1
EATON
END
DETOUR
M4 -8A
//. /.
////
Project No./Code
of
M
Computer File Information
Creation Date. 10/21/2022
Initials CLW
Last Modified Date 10/21/2022 Initials CLW
Full Path M %PROJECTS_DESIGMWCR 14 AND WCR
33 INTERS ECTIONWRODUCTION DWGS
Drawing File Name. WCR 33_DETOUR.DWG
AutoCAD Version. 2021 Scale. AS NOTED Units. English
Index of Revisions
Date
Comments
Initials
WELD COUNTY
As Constructed
PUBLIC WORKS DEPARTMENT
1111 H. STREET
P.O. BOX 758
GREELEY, CO. 80632-0758
PHONE (970) 356-4000
FAX (970) 304-6497
No Revisions
WCR 74 / 33 INTERSECTION
WCR 74 DETOUR PLAN
PROJ 23044, #STU CO30-078
Revised
Designer
CLW
Void
Detailer
CLW
GR-55
Sheet Subset
Sheet Subset
Sheet Number 187 of 224
LEGEND
WCR 33 NORTHBOUND DETOUR ROUTE
WCR 33 SOUTHBOUND DETOUR ROUTE
K' X X; X PROJECT LIMITS
WCR 76
WCR 74
DETOUR
4
M4 -9L
DETOUR
M4 -9R
DETOUR
4
M4 -9L
WCR 72
r"
W20-1
DETOUR
M4 -9R
(DETOUR
M4 -9R
PROJECT UMITS
ROAD CLOSED
To
THRU TRAFFIC
R11-04
dS//.
rd t./t
P////
DETOUR
M4 -9R
END
DETOUR
M4 -8A
END
4ETOUR
M4 -8A
DETOUR)
I
M4 -9L
ROAD CLOSED
TO
THRU TRAFFIC
R11-04
DETOUR
M4 -9L
R11-2
W20 -2D
EATON
5555'
////
►'5557
DETOUR AND TRAFFIC CONTROL PLAN
(WCR 33 - NORTH/SOUTH CLOSURE)
NOT TO SCALE
rt:
rn
CC
Computer File Information
Creatior Date. 10/21/2022
Initials CLW
Las; 4loaified Date 10/21/2022
Initials CLW
Full Patn. M \PROJECTS DESIGN\WCR 74 AND WCR
33 INTER$ECTIQMPRODUCTIQN DWGS
Drawing File Name: WCR 33_DETOUR.DWG
AutoCAD Version 2021 Scale AS NOTED Units. English
Index of Revisions
Date
Comments
WELD COUNTY
As Constructed
PUBLIC WORKS DEPARTMENT
1111 H. STREET
P.O. BOX 758
GREELEY, CO. 80632-0758
PHONE (970) 356-4000
FAX: (970) 304-6497
No Revisions
WCR 74 / 33 INTERSECTION
WCR 33 DETOUR PLAN
Project No./Code
PROJ: 23044, #STU CO30-078
Revised
Designer
CLW
Void
Detailer
CLW
GR-55
Sheet Subset
Sheet Subset
Sheet Number 188 of 224
Hello