Loading...
HomeMy WebLinkAbout20230921.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROADS 74 AND 33 INTERSECTION FOR APPROXIMATELY FOUR (4) MONTHS, FOR ROUNDABOUT CONSTRUCTION PROJECT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Roads 74 and 33 intersection, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective April 17, 2023, for approximately four (4) months for a roundabout construction project. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Roads 74 and 33 intersection, be temporarily closed, with said closure being effective April 17, 2023, for approximately four (4) months for a roundabout construction project, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc;So(R5),D.spo1- k,CSP o4/ii/23 2023-0921 EG0024 TEMPORARY CLOSURE - COUNTY ROADS 74 AND 33 INTERSECTION PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 3rd day of April, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: daYi44) ;„k, Weld County Clerk to the Board ount orney Date of signature: O1 (I I/2 Milye-Fregeman, Chair &,4e,a 2023-0921 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 29, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close the intersection of CR 74 and CR 33 beginning April 17, 2023 through August 14, 2023 for construction of roundabout. Submitted by pass -around on March 27, 2023 for review and signature. See attached closure diagram(s). 2023-0921 p4/03 e OD24- LEGEND I 1. SIGNS SHALL BE SPACED A MINIMUM OF 500' OR AS INDICATED BY TRAFFIC CONTROL SUPERVISOR. 7NOTES: / / t f`�l / - ! 1 1 ! Li WCR 74 EASTBOUND DETOUR ROUTE I WCR 74 WESTBOUND DETOUR ROUTE - -IIIMISIMINNIM WCR 33 NORTHBOUND DETOUR ROUTE TRAFFIC PLAN IS BASED ON COOT TRAFFIC CONTROL FOR HIGHWAY CONSTRUCTION DETAIL TYPICAL SIGNAGE FOR ROAD CLOSURE "CASE NO. 20" (S-630-1. SHEET 10 OF 24. DATED JULY 31, 2-19). 3. CONTRACTOR TO PLAN FOR 24/7 CLOSURE OF INTERSECTION, FOR 100 DAYS (MAXIMUM). 4. ALL DEVICES SHALL MEET OR EXCEED MUTCD I NCHRP 350 STANDARDS (LATEST EDITION). i 5. PRIVATE ACCESS IS TO BE MAINTAINED AT ALL I WCR 78 TIMES PROJECT MESSAGE • WCR 33 CLOSED --/VARIABLE BOARD � AT WCR 74 L _ _ _ - _ _ - _ _ __ _ _ _ _ _ I WCR 33 SOUTHBOUND DETOUR ROUTE IXf\QQ:1XPROJECT LIMITS - " -� - - - - - - " - -- -. I CONTROL SUPERVISOR. 8. NO DETOURS WILL BE ALLOWED ON GRAVEL WCR 74 VARIABLE MESSAGEi ROADS. EASTBOUND DETOUR ROUTE (PURPLE) BOARD •WCR 74 CLOSED AT WCR 33 I VARIABLE MESSAGE BOARD I t I J� ( II I • WCR 74 CLOSED AT i t WCR 33 PROJECT UNITS 1 ■ } WCR 74 _ EATON CI I I I I j WCR 72 •-y1-___---- r -- i I J I I i'''''cirlasjatai i I I I t I -__ ___ _--f- i I I , - - -- I I d.l CU: I -- ------------------ -- 1 ) 1 I 70 WCR 33 NORTHBOUNDtill DETOUR ROUTE (CYAN) WCR 33 SOUTHBOUND DETOUR ROUTE (GREEN)in - - - - -`? - ___WCR i' ---- U M N U �- N N rYl N U _ C7 U Cl M M _ _ v IX o IX Ur U VARIABLE MESSAGE • WCR 33 CLOSED iHWY BOARD ATWCR 74I r 392 T OVERALL DETOUR AND TRAFFIC CONTROL PLAN - -"- _ ,f (WCR 74 AND WCR 33 INTERSECTION CLOSURE). NOT TO SCALE Computer File Information Index of Revisions WELD COUNTY - As Constructed WCR DETOUR 74 / 33 INTERSECTION - OVERALL PLAN Project No./Code Creation Dale. 10/21/2022 Initials CLW Date Comments Initials' No Revisions PROJ. 23044, #STU CO30-078 Las: Modified Date 10/21/2022 Initials CLW - - _ •-�, .,-/ PUBLIC WORKS DEPARTMENT 1111 H. STREET Full Pain: iNTERSEC_o MwcC I N D WCR 33 SEcn Roo h' ti r ; — IA P.O. BOX 758 Revised Designer CLW 9 GR-55 Drawing File Name' WCR 33_DETOUR.DWG Name: ETO R D ■ GREELEY, CO. 80632-0758 PHONE (970) 356-4000 Detailer CL W Void Sheet Number 186 of 224 AutoCAD Version, 2021 Scale AS VOTED Units. English _ FAX: (970) 304-6497 Sheet Subset Sheet Subset LEGEND y - WCR 74 EASTBOUND DETOUR ROUTE WCR 74 WESTBOUIJO DETOUR ROUTE PROJECT LIMITS WCR 78 WCR 76 END DETOUR M4 -8A WCR 74 DETOUR 1) M4 -9R DETOUR M4 -9L DETOUR M4 -9R PROJECT OMITS W20-1 WCR 72 M4 -9L al t1 • _ ROAD CLOSED TO THRU TRAFFIC R11-04 ROAD CLOSED TO THRU TRAFFIC R11-04 nrToitn (WCR INN cn CC U DETOUR M4 -9R ROAD CLOSED TO THRU TRAFFIC R11-04 DETOUR M4 -9L R11-2 ////. '//// //// Arran Tnarrin CflNTROI_ PLAN 74 - EAST/WEST CLOSURE) NOT TO SCALE DETOUR 1 M4 -9L DETOUR M4 -9R .i ROAD CLOSED TO THRU TRAFFIC R11-04 ////. /// '//// I • W20 -2D W20-1 EATON END DETOUR M4 -8A //. /. //// Project No./Code of M Computer File Information Creation Date. 10/21/2022 Initials CLW Last Modified Date 10/21/2022 Initials CLW Full Path M %PROJECTS_DESIGMWCR 14 AND WCR 33 INTERS ECTIONWRODUCTION DWGS Drawing File Name. WCR 33_DETOUR.DWG AutoCAD Version. 2021 Scale. AS NOTED Units. English Index of Revisions Date Comments Initials WELD COUNTY As Constructed PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 GREELEY, CO. 80632-0758 PHONE (970) 356-4000 FAX (970) 304-6497 No Revisions WCR 74 / 33 INTERSECTION WCR 74 DETOUR PLAN PROJ 23044, #STU CO30-078 Revised Designer CLW Void Detailer CLW GR-55 Sheet Subset Sheet Subset Sheet Number 187 of 224 LEGEND WCR 33 NORTHBOUND DETOUR ROUTE WCR 33 SOUTHBOUND DETOUR ROUTE K' X X; X PROJECT LIMITS WCR 76 WCR 74 DETOUR 4 M4 -9L DETOUR M4 -9R DETOUR 4 M4 -9L WCR 72 r" W20-1 DETOUR M4 -9R (DETOUR M4 -9R PROJECT UMITS ROAD CLOSED To THRU TRAFFIC R11-04 dS//. rd t./t P//// DETOUR M4 -9R END DETOUR M4 -8A END 4ETOUR M4 -8A DETOUR) I M4 -9L ROAD CLOSED TO THRU TRAFFIC R11-04 DETOUR M4 -9L R11-2 W20 -2D EATON 5555' //// ►'5557 DETOUR AND TRAFFIC CONTROL PLAN (WCR 33 - NORTH/SOUTH CLOSURE) NOT TO SCALE rt: rn CC Computer File Information Creatior Date. 10/21/2022 Initials CLW Las; 4loaified Date 10/21/2022 Initials CLW Full Patn. M \PROJECTS DESIGN\WCR 74 AND WCR 33 INTER$ECTIQMPRODUCTIQN DWGS Drawing File Name: WCR 33_DETOUR.DWG AutoCAD Version 2021 Scale AS NOTED Units. English Index of Revisions Date Comments WELD COUNTY As Constructed PUBLIC WORKS DEPARTMENT 1111 H. STREET P.O. BOX 758 GREELEY, CO. 80632-0758 PHONE (970) 356-4000 FAX: (970) 304-6497 No Revisions WCR 74 / 33 INTERSECTION WCR 33 DETOUR PLAN Project No./Code PROJ: 23044, #STU CO30-078 Revised Designer CLW Void Detailer CLW GR-55 Sheet Subset Sheet Subset Sheet Number 188 of 224 Hello