HomeMy WebLinkAbout20250350.tiff Resolution
Approve Regulating,Warning,and Guiding Traffic during Temporary Closure of
County Road 80 between County Roads 29 and 31 for approximately Five(5)Days,
for Culvert Replacement
Whereas,the Board of County Commissioners of Weld County,Colorado,pursuant to
Colorado statute and the Weld County Home Rule Charter,is vested with the authority of
administering the affairs of Weld County,Colorado,and
Whereas,pursuant to C.R.S.§42-4-106(6)(a)"...local authorities,with their respective
jurisdiction may,for the purpose of road construction and maintenance,temporarily close
to through traffic or to all vehicular traffic any highway or portion thereof for a period not
to exceed a specified number of work days for project completion and shall,in conjunction
with any such road closure establish appropriate detours or provide for an alternative
routing of the traffic affected...",and
Whereas, pursuant to said statute and upon the basis of traffic and personnel
investigations,the Board has determined that conditions exist which make it necessary
to temporarily close County Road 80,between County Roads 29 and 31,to through traffic
and to regulate,warn and guide vehicular traffic by posting signs thereon,with said
closure being effective February 10,2025,for approximately five(5)days for a culvert
replacement.
Now,therefore,be it resolved that the Board of County Commissioners of Weld County,
Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County
roads and any intersections thereof,and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate,warn and/or
guide traffic thereon for the safety of the general public and that said traffic control devices
shall conform to the Federal Manual on Uniform Traffic Control Devices.
Be it further resolved that the Board of County Commissioners of Weld County,
Colorado,does declare and establish that County Road 80,between County Roads 29
and 31,be temporarily closed,with said closure being effective February 10,2025,for
approximately five(5)days for a culvert replacement,and that standard official traffic
control devices shall be erected at said closure giving notice of the restrictions.
cc:So(RS),D:Spa.+ct,,C$p 2025-0350
odt/o5/25 EG0024
Temporary Closure—County Road 80
Page 2
The Board of County Commissioners of Weld County,Colorado,approved the above
and foregoing Resolution,on motion duly made and seconded,by the following vote on
the 3rd day of February,A.D.,2025:
Perry L.Buck,Chair:Aye ,�•� .,
Scott K.James,Pro-Tern:Aye '�
Jason S.Maxey:Aye I h A`tiY11
Lynette Peppier:Aye =,;ri1�g= gal
�l1/1
Kevin D.Ross:Excused ., 4 j
Approved as to Form: +4%► )1^,,;���
Bruce Barker,County Attorney
Attest:
Esther E.Gesick,Clerk to the Board
2025-0350
EG0024
MEMORANDUM
i r ; TO:Clerk to the Board DATE:January 29,2025
FROM: Amy Mutchie,Public Works Department
GrAll
SUBJECT:BOCC Agenda Item
Weld County Public Works is requesting permission to close WCR 80 between WCR 29 and WCR 31
from 2/10/25 thru 2/14/25 for a culvert replacement.
See attached closure diagram.
2025-0350
Z/3 �C-�oc z4
www . invanon . com
4
0
4
r
0
_ - - = - - i � . T = — 4 in - A - / [M - — � - - � — Ida - a
DETOUR
DETOUR
M4 - 9 N14 - 9
M4 - 9 PROJECT # AN - 59 / 2025
ROAD CLOSURE DESCRIPTION
WCR 80 between WCR 29 and WCR 31
Closed 2 / 10 / 2025 thru 2 / 14 / 2025
for culvert replacement
NOTICE TO PUBLIC
I 7
Road signs and barricaded
DETOUR ROUTE
WCR 29 between WCR 80 and SH 14 1 mile paved
SH 14 between WCR 29 and WCR 31 1 mile paved
WCR 31 between SH 14 and WCR 80 1 mile paved
Q NOTES
c . MUM
(Wad
N . dew
% ae3H • W20 - 1F ADT of WCR is : 100 / 2024
< YITlOM '
Culvert replaced is Irrigation : OId : 18 " Round CMP
W20 - 1F f
New : 18 " RCPR
1Culvert is 50 ' East of WCR 29 on WCR 80
- - � - � � Prepared by : Ryan Reynolds
M4 - 10
3 CI ( 1 1 1129 / 2025
ROAQ\ R
WORK ROAD ' .
1 AHE O WRK
AHEAD
•
•
Hello