HomeMy WebLinkAbout20251180.tiff515 2.5
AB4
COLORADO
Department of Public
Health b Environment
Weld County - Clerk to the Board
1150 0 St
PO Box 758
Greeley, CO 80632
April 29, 2025
To Whom It May Concern:
RECEIVED
APR 29 2025
WELD COUNTY
COMMISSIONERS
On April 29, 2025, the Colorado Air Pollution Control Division will begin a 30 -day
public comment period for Bison IV Operating, LLC - Critter Creek 16 SE Pad. A copy
of this public notice is enclosed.
Thank you for assisting the division by posting a copy of this notice in your office. A
public copy of this notice is required by Colorado Air Quality Control Commission
regulations. The notice must be available for public inspection for a period of thirty
(30) days from the beginning of the public comment period. Please reference the
public notice for instructions on submitting comments.
OF
° 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.cotorado.gov/cdohe
Jared Polls, Govemor I Jill Hunsaker Ryan, MPH, Executive Director
cvi4.(c) f �(C14I1 DiDt`.1isB), �bC3G�
2025-1180
a.M.747
��
wHE
Website Title:
Air Pollution Control Division
Notice of a Proposed Construction Permit Warranting Public Comment
Bison IV Operating, LLC - Critter Creek 15 SE Pad - Weld County
Notice Period Begins: April 29, 2025
Notice is hereby given that an application for a proposed project or activity has been submitted to
the Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Bison IV Operating, LLC
Facility: Critter Creek 15 SE Pad
Well Production Facility
SWSE quadrant of Section 15, Township 11N, Range 63W
Weld County
The proposed project or activity is as follows:
Bison IV Operating, LLC requests this modification to decrease the requested throughput
and subsequent emission limits while maintaining previously approved emission factors in order to
bring permitted emissions limits below the newly applicable serious ozone nonattainment major
source thresholds.
The division has determined that this permitting action is subject to public comment requirements
under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to
the following reason(s):
• This source is requesting a federally -enforceable limit on the potential to emit to avoid
other requirements. (Regulation Number 3, Part B, Section III.C.1.d.)
The division has made a preliminary determination of approval of the application.
A copy of the application, the division's analysis, and a draft of construction permit number
17WE1232 are available on the division website: Air Permit Public Notices
4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.Qov/cdohe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
The division hereby solicits submission of public comments from any interested person concerning
the ability of the proposed project or activity to comply with the applicable standards and
regulations of the commission. The division will receive and consider written public comments for
thirty (30) calendar days after the date of this notice. Comments may be submitted using the
following options:
Submit comments via web form: Form for Public Comment on Draft Permit
Submit comments via email: cdphe apcd airpermitcomments@state.co.us
Submit comments via mail:
Air Pollution Control Division - Oil a Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-61
Denver, CO 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and
will be accessible to the public. Your comment(s) and the division's response(s) are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comment(s).
4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.Qov/cdphe
Jared Polis, Govemor I Jill Hunsaker Ryan, MPH, Executive Director
Hello