Loading...
HomeMy WebLinkAbout20253070.tiff A . MEMORANDUM COUNTY , CO To : Board of County Commissioners From : Matthew VanEyll , Planner II Subject : USR21 - 0004 Acceptance of a Replacement Surety Bond Date : October 23 , 2025 Case Number : U S R21 - 0004 Applicant : SunShare LLC c / o Beau Scott Owner : CAW Equities LLC Legal Description : Part of the SW4 of Section 20 , T4N , R66W of the 6th P . M . , Weld County , CO Location : East of and adjacent to HWY 60 and north of and adjacent to CR 42 Zoning : A ( Agricultural ) Zone District Parcel # : 1057 - 20 - 3 - 00 - 021 Parcel Size : ± 35 acres Lease Area : ± 14 acres S ummary : S unShare , LLC , has submitted a request to release the currently held Surety Bond for the decommissioning and reclamation plan for USR21 - 0004 Solar Energy facility , and accept a replacement Surety Bond . USR21 - 0004 was conditionally approved by the Board of County Commissioners on May 12 , 2021 . The applicant is requesting to replace the existing Surety Bond ( # SU 1172321 ) from Arch Insurance Company in the amount of $ 84 , 000 . 00 , that was accepted by the Board of County Commissioners on November 1 , 2021 , with the new Surety Bond ( # 800137768 ) from Atlantic Specialty Insurance Company in the amount of $ 84 , 000 . 00 . This new Surety Bond will comply with Condition of Approval # 1 . A . of the Resolution . Recommendation : S taff recommends that the Board accept the Surety Bond because it complies with Section 23 - 4 - 1030 . B . 4 . g . of the Weld County Code and staff has accepted the related decommissioning / reclamation plan . If the surety bond is accepted by the Board of County Commissioners , it will satisfy Condition of Approval # 1 . A . of the Use by Special Review Resolution . 2025 - 3070 IIA 0 PL2 -1q (D "Mg Ili( 01111110. -. . . . . . • . t 4% 4 Oil C III : OCTOBER 13 , 2025 THE BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY 1555 N 17TH AVE GREELEY , CO 80631 Please find included original bond documents for SunShare , LLC - Bond # 800137768 . S urety Bond No . 800137768 is attached to Gilcrest Sun - Permit USR21 - 0004 , submitted by applicant SunShare . LLC . * * * This bond replaces and supersedes Arch Insurance Company Bond No . SU 1172321 * * * S pon reception , please release the original bond ( SU 1172321 ) and replace it with Bond # 800137768 . If it is Weld County policy to return canceled bonds , the SU 1172321 document can be sent back to the S unShare office at 1724 N . Gilpin St , Denver , CO 80218 and we will return the cancelled bond to our insurer . S INCERELY , S UNSHARE , LLC :).4 SunShare COMMUNITY SOLAR 1724 Gilpin Street , Denver , CO 80218 • legal@mysunshare . com • MYSUNSHARE . COM SURETY BOND Ci) BOND NUMBER 800137768 KNOW ALL MEN BY THESE PRESENTS , that SunShare , LLC as Principal , and Atlantic Specialty Insurance Company , a corporation duly organized under the laws of the State of Ohio , as Surety , are held and firmly bound unto Qom = i ���tw �d� ary, as Obligee in the sum of $ 84 , 000 . 00 lawful money of the United States , for payment of which , well and truly to be made , we bind ourselves , our heirs , executors , administrators , successors and assigns , jointly and severally , firmly by these presents , the liability of the Surety being limited to the penal sum of this bond regardless of the number of years the bond is in effect . WHEREAS , the Principal has submitted a decommissioning plan to Obligee requiring the eventual removal and reclamation of a solar energy facility comprised of solar energy collection cells / panels and related facilities necessary to harness sunlight for energy generation and distribution and associated support structure , braces , racking , wiring and related interconnection equipment which plan is a condition of approval of land use permit USR21 - 0004 and which is hereby specifically referred to and made part heror as Exhibit A, ( " Permit " ) , and WHEREAS , Weld County requires the submission of a bond guaranteeing the maintenance , replacement , removal , relocation , and / or reclamation of said solar energy facility located at 13285 County Road 42 , Platteville , CO 80651 and as further detailed in the revised Decommissioning Plan , attached as Exhibit B . NOW THEREFORE , the condition of this obligation is such , that if the above bounden Principal shall perform in accordance with the aforesaid Permit and indemnify the Obligee against all loss caused by Principal ' s breach of any ordinance , permit obligation , or agreement relating to maintenance , replacement , removal , relocation , and / or reclamation of the facility , then this obligation shall be void , otherwise to remain in full force and effect unless cancelled as set forth below . Whereas , the Obligee has agreed to accept this Bond , this Bond shall be effective for the definite period of October 13 , 2025 to October 13 , 2026 THIS BOND shall automatically renew for successive one - year terms unless , at least ninety ( 90 ) days prior to the next annual renewal date ( which shall be December 31 of each calendar year ) , the Surety delivers written notice to Principal and to Obligee , or Principal delivers written notice to Surety and Obligee , that the notice - sender seeks to modify the terms of, or cancel , this bond . Written notice is effective if delivered to , or sent by certified mail , postage prepaid , and deposited in the U . S . Mail , at least ninety ( 90 ) days prior to the next annual renewal date addressed to the Principal or Surety , as the case may be , and to the Obligee requiring bond , as outlined in the notice section of this Bond , and is actually received by the Principal or Surety , as the case may be , and the Obligee at least thirty ( 30 ) days prior to the renewal date . However , neither : ( a ) the Surety ' s decision to cancel , nor ( b ) the failure or inability of the Principal to file a replacement bond or other security in the event the Surety exercises its right to cancel this Bond , shall itself constitute a loss to the Obligee recoverable under this Bond or any extension thereof. NOTICE : Principal : SunShare , LLC 1724 Gilpin Street Denver , CO 80218 Surety : Atlantic Specialty Insurance Company 605 Highway 169 North , Suite 800 PIymouth , MN 55441 Obligee : The Board of County Commissioners of Weld County Y 1555 N 17th Avenue Greeley , CO 80631 THIS BOND is signed , sealed , dated on the 13th day of October , 2025 This bond is effective the 13th day of October , 2025 SunShare , LLC A By : r� y _ Atlantic Specialty Insurance Company 9 By : _ t 11.4 J i II L . Hohl Attorn • y - in - Fact Exhibit A To be attached and made part of Atlantic Specialty Insurance Company Bond # 800137768 . RESOLUTION RE : APPROVE SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT , USR21 - 0004 , FOR A MEDIUM SCALE SOLAR FACILITY OUTSIDE OF SUBDIVISIONS AND HISTORIC TOWNSITES IN THE A ( AGRICULTURAL ) ZONE DISTRICT — WETCO FARMS , INC . , C / O SUNSHARE , LLC WHEREAS , the Board of County Commissioners of Weld County , Colorado , pursuant to Colorado statute and the Weld County Home Rule Charter , is vested with the authority of administering the affairs of Weld County , Colorado , and WHEREAS , the Board of County Commissioners held a public hearing on the 12th day of May , 2021 , at the hour of 10 : 00 a . m . , in the Chambers of the Board , for the purpose of hearing the application of WETCO Farms , Inc . , 2055 1st Avenue , Greeley , Colorado 80631 , c / o SunShare , LLC , 1724 Gilpin Street , Denver , Colorado 80218 , for a Site Specific Development Plan and Use by Special Review Permit , USR21 - 0004 , for a Medium Scale Solar Facility outside of subdivisions and historic townsites in the A ( Agricultural ) Zone District , on the following described real estate , being more particularly described as follows : Being part of the SW1 / 4 of Section 20 , Township 4 North , Range 66 West of the 6th P . M . , Weld County , Colorado WHEREAS , at said hearing , the applicant was represented by Amanda Mack , SunShare , LLC , 1724 Gilpin Street , Denver , Colorado 80218 , and WHEREAS , Section 23 - 2 - 230 of the Weld County Code provides standards for review of said Use by Special Review Permit . and WHEREAS , the Board of County Commissioners heard ail of the testimony and statements of those present , studied the request of the applicant and the recommendation of the Weld County Planning Commission and all of the exhibits and evidence presented in this matter and , having been fully informed , finds that this request shall be approved for the following reasons : 1 . The submitted materials are in compliance with the application requirements of Section 23 - 2 - 260 of the Weld County Code . 2 . The applicant has demonstrated that the request is in conformance with Section 23 - 2 - 230 . 8 of the Weld County Code as follows : A . Section 23 - 2 - 230 . B . 1 - - The proposed use is consistent with Chapter 22 and any other applicable Code provisions or ordinance in effect . 1 ) Section 22 - 22 - 30 . A . 3 states : " Limit the density and intensity of development to maintain agricultural areas . " The site is in dryland agricultural production because there is no irrigation water . The owner tried to dryland farm the land for about five ( 5 ) years and never got a profitable crop . The solar facility will have a footprint of about a 35 - acre section of a quarter section . The property will remain in dryland farming . co : PLCOA / TP) , NOC Z R / OA ) , E f iCLO , C At eci Ken ) , A PPE , APPL RC P 2021 - 1210 O - t r a t / 1 PL2796 SPECIAL REVIEW PERMIT(USR21-0004)—WETCO FARMS,INC,CIO SUNSHARE,LLC PAGE 2 2) Section 22-2-60 B 3 states "Require that energy and mineral resource development conserve the land and minimize the impact on surrounding land and the existing surround land uses"The proposed facility will occupy about 14 acres of a 35-acre parcel The applicant is proposing wood fencing to buffer the facility from the closest residences B Section 23-2-230 B 2—The proposed use is consistent with the intent of the A(Agricultural)Zone District 1) Section 23-3-10—Intent,states "Agnculture in the County is considered a valuable resource,which must be protected from adverse impacts resulting from uncontrolled and undirected business,industrial,and residential land uses The A(Agricultural) Zone Distnct is established to maintain and promote agriculture as an essential feature of the County The A(Agricultural)Zone Distnct is intended to provide areas for the conduct of agricultural activities and activities related to agnculture and agncultural production,and for areas for natural resource extraction and energy development, without the interference of other,incompatible land uses" 2) Section 23-3-40 R states "Medium scale solar facility,subject to the additional requirements of Section 23-5-1030"Based on this, the use may be permitted by a USR in the A(Agricultural)Zone District The medium scale solar is a non-permanent and regulated use of land and is consistent with Section 23-3-10 as the Use is more intense than a Use by Right C Section 23-2-230 B 3—The uses which will be permitted will be compatible with the existing surrounding land uses The adjacent lands consist of pastures,crops,and rural residences There are three(3)residences to the south,and across the street(CR 42)from the site The closest residence is about 170 feet south of the site There are four(4)USRs within one(1) mile of the site USR-1185 fora Machine Repair Shop is located east of the site USR14-0024 for an Oil and Gas support facility,USR-839 for a commercial greenhouse,and USR13-0039 for automobile repair are all located south of the site The Weld County Department of Planning Services sent notice to seven(7)surrounding property owners Planning staff has not received any correspondence concerning this case The Conditions of Approval and Development Standards will assist in mitigating the impacts of the facility on the adjacent properties and ensure compatibility with surrounding land uses and the region D Section 23-2-230 B 4—The uses which will be permitted will be compatible with future development of the surrounding area,as permitted by the existing zoning, and with the future development, as projected by Chapter 22 of the Weld County Code and any other applicable Code provisions or ordinances in effect,or the adopted Master Plans of affected 2021-1210 PL2796 SPECIAL REVIEW PERMIT ( USR21 - 0004 ) — WETCO FARMS , INC . , C / O SUNSHARE , LLC PAGE 3 municipalities . The site is located within the three ( 3 ) mile referral area and the Coordinated Planning Agreement Area ( CPA ) for the Towns of Milliken , Platteville , and Gilcrest , as well as the City of Evans . As part of the pre - application process the municipalities were sent a Notice of Inquiry ( N01 ) . The Towns of Platteville , Milliken and the City of Evans each submitted a signed NOI , dated January 22 , 2021 , July 29 , 2020 , and July 29 , 2020 , respectively , stating that they have no interest in annexing this property . The Town of Gilcrest submitted a signed NOI , dated July 23 , 2020 , which indicated that they do wish to annex this property . Mr . Larry Lorentzen , Town Administrator for the Town of Gilcrest , indicated the town would need to provide snow removal or road maintenance if the subject property was annexed . However , the town did not have the necessary funds in their budget to provide snow removal and road maintenance . Mr . Lorentzen requested that SunShare , LLC ; provide a minimum setback of 400 feet along State Highway 60 frontage to accommodate any future commercial or retail uses . SunShare , LLC , has provided a 500 - foot setback between the road right - of - way and the solar facility . None of the municipalities responded with referral agency comments . The Comprehensive Plan maps for the City of Evans , Town of Platteville and the Town of Milliken do not encompass the subject property . However , per the 2012 Comprehensive Plan Update Map for the Town of Gilcrest , the site is shown as Low Density Residential and part of an Opportunity Area for Future Regional Commercial opportunities . The intersection at County Road 42 and State Highway 60 is designated as Regional Commercial . E . Section 23 - 2 - 230 . B . 5 — The application complies with Chapter 23 , Articles V and XI , of the Weld County Code . The site is not located within any overlay district officially adopted by the County , including A - P ( Airport ) Overlay District , Geologic Hazard overlay District , MS4 - Municipal Separate Storm Sewer System area , Special Flood Hazard Area , or Historic Townsite Overlay District . Building Permits issued on the lot will be required to adhere to the fee structure of the County - Wide Road Impact Fee , County Facility Fee , and Drainage Impact Fee Programs . F . Section 23 - 2 - 230B . 6 — The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use . The proposed facility is located entirely on soils designated " Prime Farmland , if irrigated " , per the 1979 Soil Conservation Service Important Farmlands of Weld County Map . The soils are designated as Julesburg sandy loam with zero ( 0 ) to one ( 1 ) percent slopes . The proposed USR will not take any Prime ( Irrigated ) Farmland out of production . The Platte Valley Conservation District did not return a referral agency response . G . Section 23 - 2 - 230B . 7 — The Design Standards ( Section 23 - 2 - 240 , Weld County Code ) , Operation Standards ( Section 23 - 2 - 250 , Weld County Code ) , Solar Facility Standards ( Section 23 - 4 - 1030 , Weld County Code ) , Conditions of Approval and Development Standards can ensure that there 2021 - 1210 PL2796 SPECIAL REVIEW PERMIT(USR21-0004)—WETCO FARMS,INC,C/O SUNSHARE,LLC PAGE 4 are adequate provisions for the protection of the health,safety,and welfare of the inhabitants of the neighborhood and County NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of WETCO Farms,Inc,Go SunShare,LLC,for a Site Specific Development Plan and Use by Special Review Permit,USR21-0004,for a Medium Scale Solar Facility outside of subdivisions and historic townsites in the A(Agricultural)Zone District, on the parcel of land described above be,and hereby is,granted subject to the following conditions 1 Prior to recording the map A A Decommissioning/Reclamation Plan shall be submitted per Section 23-4-1030 B,which shall require the applicant to provide financial assurance to the County in the form of a surety bond in an amount established by the Director of the Department of Planning Services,to ensure proper decommissioning of the facility Said surety bond shall name the Board of County Commissioners of Weld County as beneficiary and be current and active at all,times during the life of the permit B A Road Maintenance Agreement for construction only is required at this location Road maintenance includes,but is not limited to,dust control and damage repair to specified haul routes C The applicant shall submit a recorded copy of any agreement signed by all of the owners of the property crossed by the access The access shall be for ingress,egress,utilities and shall be referenced on the USR map by the Weld County Clerk and Recorder's Reception number D The map shall be amended to delineate the following 1) All sheets of the map shall be labeled USR21-0004 2) The attached Development Standards 3) The map shall be prepared in accordance with Section 23-2-260 D of the Weld County Code 4) The map shall delineate the landscaping and screening in accordance with the approved Landscape and Screening Plan 5) All signs shall be shown on the map and shall adhere to Chapter 23, Article IV,Division 2 and Appendices 23-C,23-D and 23-E of the Weld County Code 6) The map shall delineate the 30-foot setback from the boundary of adjacent properties, irrigation ditches, and rights-of-way in 2021-1210 PL2796 SPECIAL REVIEW PERMIT(USR21-0004)—WETCO FARMS,INC,CIO SUNSHARE,LLC PAGE 5 which no equipment shall be located, in accordance with Section 23-4-1030 G of the Weld County Code 7) County Road 42 is a paved road and is designated on the Weld County Functional Classification Map as a collector road,which requires 80 feet of nght-of-way at full bulldout The applicant shall delineate and label the future and existing right-of-way(along with the documents creating the existing right-of-way)and the physical location of the road on the site map or plat All setbacks shall be measured from the edge of the right-of-way This road is maintained by Weld County 8) The applicant shall show and label the approved access locations, approved access width,and the appropriate turning radii(60')on the site plan The applicant must obtain an access permit in the approved location prior to construction 9) The applicant shall show and label the approved tracking control on the site plan 10) The applicant shall show and label the entrance gate,if applicable An access approach that is gated shall be designed so that the longest vehicle(including trailers)using the access can completely clear the traveled way when the gate is closed In no event shall the distance from the gate to the edge of the traveled surface be less than 35 feet 11) If applicable,the applicant shall show and label a 30-foot minimum access and utility easement to provide legal access to the parcel on the site plan 12) The applicant shall show and label the drainage flow arrows 13) The applicant shall show and label the parking and traffic circulation flow arrows showing how the traffic moves around the property 2 Upon completion of Condition of Approval#1 above,the applicant shall submit one(1)electronic copy(pdf)of the map for preliminary approval to the Weld County Department of Planning Services Upon approval of the map,the applicant shall submit a Mylar map along with all other documentation required as Conditions of Approval The Mylar map shall be recorded in the office of the Weld County , Clerk and Recorder by the Department of Planning Services The map shall be prepared in accordance with the requirements of Section 23-2-260 D of the Weld County Code The Mylar map and additional requirements shall be submitted within 120 days from the date of the Board of County Commissioners Resolution The applicant shall be responsible for paying the recording fee ' 2021-1210 PL2796 SPECIAL REVIEW PERMIT ( USR21 - 0004 ) — WETCO FARMS , INC . , C / O SUNSHARE , LLC PAGE 6 3 . In accordance with Weld County Code Ordinance # 2012 - 3 , approved April 30 , 2012 , should the map not be recorded within the required 120 days from the date of the Board of County Commissioners Resolution , a $ 50 . 00 recording continuance charge shall be added for each additional three ( 3 ) month period . 4 . Prior to Construction : A . The approved access and tracking control shall be constructed prior to on - site construction . B . If more than one ( 1 ) acre is to be disturbed , a Weld County Grading Permit will be required . 5 . The Use by Special Review is not perfected until the Conditions of Approval are completed and the map is recorded . Activity shall not occur , nor shall any building or electrical permits be issued on the property , until the Use by Special Review map is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement . The above and foregoing Resolution was , on motion duly made and seconded , adopted by the following vote on the121th day of May , A . D . , 2021 . BOARD OF COUNTY COMMISSIONERS WELD COUNTY , COLORADO ATTEST : ditto Atosa 0 „ 0 - 74,- - Steve • repo , Chair Weld County Clerk to the Board SC * . es , Pro - Te BY : Gt • ' , k � eputy Clerk to the Board4eur � ►� s ' � \ Perry L . Buc '4 • APPR ED A • 6 .� 4. si oil IP, # , _ ( { . - 11161 k - " r ike Freeman 1 / ': a. Jr: ounty ttorney 0 � '%1EXCUSED 1 Lori Saine Date of signature : OCD1 cct f 9 % 2021 - 1210 PL2796 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS WETCO FARMS , INC . , C / O SUNSHARE , LLC USR21 - 0004 1 . A Site Specific Development Plan and Use by Special Review Permit , USR21 - 0004 , is for a Medium Scale Solar Facility outside of subdivisions and historic townsites in the A ( Agricultural ) Zone District , subject to the Development Standards stated hereon . 2 . Approval of this plan may create a vested property right pursuant to Section 23 - 8 - 10 of the Weld County Code . 3 . This is an unmanned facility . 4 . The site shall be maintained in accordance with the Property Maintenance Plan . 5 . The site shall be maintained in accordance with the approved Decommissioning Plan . 6 . The site shall be maintained in accordance with the approved Landscape and Screening Plan . 7 . All signs shall adhere to Chapter 23 , Article IV , Division 2 and Appendices 23 - C , 23 - D and 23 - E of the Weld County Code . 8 . No outdoor storage of any materials or equipment including , but not limited to , solar panels and support structures not in operation will be allowed . 9 . No equipment associated with the solar facility shall be located within 30 feet of the boundary of adjacent properties , irrigation ditches , and / or public or private rights - of - way . 10 . The property owner or operator shall be responsible for controlling noxious weeds on the site , pursuant to Chapter 15 , Articles I and II , of the Weld County Code . 11 . The access to the site shall be maintained to mitigate any impacts to the public road , including damages and / or off - site tracking . 12 . There shall be no parking or staging of vehicles on public roads . On - site parking shall be utilized . 13 . Any work that may occupy and / or encroach upon any County rights - of - way or easement shall acquire an approved Right - of - Way Use Permit prior to commencement . 14 . The property owner or operation shall comply with all requirements provided in the executed Road Maintenance Agreement . 15 . The historical flow patterns and runoff amounts on the site will be maintained . 16 . Weld County is not responsible for the maintenance of on - site drainage related features . 2021 - 1210 PL2796 DEVELOPMENT STANDARDS ( USR21 - 0004 ) - - WETCO FARMS , INC . , CIO SUNSHARE , LLC PAGE 2 17 . All liquid and solid wastes , as defined in the Solid Wastes Disposal Sites and Facilities Act , C . R . S . § 30 - 20 - 100 . 5 , shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination . 18 . No permanent disposal of wastes shall be permitted at this site . This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act , C . R . S . § 30 - 20 - 100 . 5 . 19 . Waste materials shall be handled , stored , and disposed of in a manner that controls fugitive dust , fugitive particulate emissions , blowing debris , and other potential nuisance conditions . The facility shall operate in accordance with Chapter 14 , Article I , of the Weld County Code . 20 . Fugitive dust should attempt to be confined on the property . Uses on the property should comply with the Colorado Air Quality Commission ' s Air Quality Regulations . 21 . During construction , adequate toilet facilities and handwashing units shall be provided . Portable toilets shall be serviced by a cleaner licensed in Weld County , contain hand sanitizers , be screened from public view and removed when construction is completed . 22 . The operation shall comply with all applicable rules and regulations of state and federal agencies and the Weld County Code . 23 . Building Permits shall be required for any new construction or set up manufactured structure , per Section 29 - 3 - 10 of the Weld County Code . A building permit application must be completed and submitted . Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application . Currently , the following have been adopted by Weld County : 2018 International Building Codes , 2006 International Energy Code , 2017 National Electrical Code , and Chapter 29 of the Weld County Code . A plan review shall be approved , and a permit must be issued prior to the start of construction . 24 . The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code . 25 . Necessary personnel from the Weld County Departments of Planning Services , Public Works , and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations . 26 . The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations . Substantial changes from the plans or Development Standards , as shown or stated , shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted . Any other changes shall be filed in the office of the Department of Planning Services . 2021 - 1210 PL2796 DEVELOPMENT STANDARDS ( USR21 - 0004 ) — WETCO FARMS , INC . , C / O SUNSHARE , LLC PAGE 3 27 . The property owner or operator shall be responsible for complying with all of the foregoing Development Standards . Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners . 28 . Construction or Use pursuant to approval of a Use by Special Review Permit shall be commenced within three ( 3 ) years from the date of approval , unless otherwise specified by the Board of County Commissioners when issuing the original Permit , or the Permit shall be vacated . The Director of Planning Services may grant an extension of time , for good cause shown , upon a written request by the landowner . 29 . A Use by Special Review shall terminate when the Use is discontinued for a period of three ( 3 ) consecutive years , the Use of the land changes , or the time period established by the Board of County Commissioners through the approval process expires . The landowner may notify the Department of Planning Services of a termination of the Use , or Planning Services staff may observe that the Use has been terminated . When either the Department of Planning Services is notified by the landowner , or when the Department of Planning Services observes that the Use may have been terminated , the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit . 30 . RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT : Weld County has some of the most abundant mineral resources , including , but not limited to , sand and gravel , oil , natural gas , and coal . Under Title 34 of the Colorado Revised Statutes , minerals are vital resources because ( a ) the state ' s commercial mineral deposits are essential to the state ' s economy ; ( b ) the populous counties of the state face a critical shortage of such deposits ; and ( c ) such deposits should be extracted according to a rational plan , calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state . Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development . Oftentimes , mineral resource sites are fixed to their geographical and geophysical locations . Moreover , these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource . 31 . The Weld County Right to Farm Statement , as it appears in Section 22 - 2 - 30 . A . 4 . a of the Weld County Code , shall be placed on the map and recognized at all times . 2021 - 1210 PL2796 Exhibit B - To be attached and made part of Atlantic Specialty Insurance Company Bond # 800137768 . Excellence in Electrical September 10 , 2021 Matt Ricci mricci@mysunshare . com SunShare Office : 800 - 793 - 0786 1724 Gilpin Street Mob : 720 - 371 - 9024 Denver , CO 80218 Re : Gilcrest Sun Decommissioning Cost Estimate Dear Matt , We are pleased to submit for your consideration , our Proposal to perform decommissioning services for the above referenced project . Our price is based on and in accordance with the drawings and information provided by SunShare . Please reference our attached Clarifications , Inclusions , and Exclusions for additional information . We appreciate the opportunity to work with you on this project . If you have any questions or need any additional information , please do not hesitate to contact me . E Light Electric Services , Inc . David Wright VP Preconstruction dwrig ht@el ightelectric . com Direct : 303 - 952 - 1120 Mobile : 303 - 819 - 5423 Attachment 361 Inverness Drive South Suite 8 Englewood , CO 80112 • 303 . 754 . 0001 • Fox 303 . 754 . 0 11 • www . elightelectric . com Excellence in Electrical Ci crest Sun Decomnissaon ' ng Fencing $ 2 , 000 . 00 Structures $ 36 , 000 . 00 Modules $ 18 , 000 . 00 Electrical $ 13 , 000 . 00 Site Restoration $ 15 , 000 . 00 Total $ 84 , 000 . 00 C arTcations , Inc usions and xc usions The Clarlications of this Budget Proposal are as follows : 1 . Proposal based on project drawings provided . 2 . This proposal includes the specified appropriate project management and mobilization to adhere to the project schedule . 3 . Breakouts provided for accounting purposes only . 4 . All work to be done in a single phase . 5 . This proposal includes recycling of steel , aluminum , modules and copper . 6 . Includes restoration of site back to like conditions before solar array was installed . This Proposal specTcal y includes : 1 . Electrical permit fees included . 2 . Removal and disposal of game fence . 3 . Removal of racking support structure and foundations . 4 . Module removal , package and recycle . 5 . Removal of electrical distribution equipment , transformers and electrical equipment pads . 6 . Removal of electrical DC string wiring and AC underground . 7 . Site restoration . 8 . Safety and protection as required . 9 . Waste disposal fees and containers . 10 . Temporary Restrooms and site facilities for workers . Th ' s Proposal specifica y excludes : 1 . Payment and Performance Bond . 2 . All utility specific tie in work to disconnect the site outside of property . 3 . Engineering , fees , errors , omissions additional design intent not clearly delivered or identified on the referenced drawings . 4 . Import or export of soils . 361 Inverness Drive South , Suite B , Englewood , CO 80112 ° 303 . 754 . 0001 ° Fax 303 . 754 . 0011 ° www . elightelectric . com INSURANCE taCts . Power of Attorney KNOW ALL MEN BY THESE PRESENTS , that ATLANTIC SPECIALTY INSURANCE COMPANY , a New York corporation with its principal office in Plymouth , Minnesota , does hereby constitute and appoint : Candice Hild , Jack Meikle, John L . Hohlt, Nathan Wonder , Senoa Hernandez , each individually if there be more than one named , its true and lawful Attorney - in - Fact , to make , execute , seal and deliver , for and on its behalf as surety , any and all bonds , recognizances , contracts of indemnity , and all other writings obligatory in the nature thereof ; provided that no bond or undertaking executed under this authority shall exceed in amount the sum of : unlimited and the execution of such bonds , recognizances , contracts of indemnity , and all other writings obligatory in the nature thereof in pursuance of these presents , shall be as binding upon said Company as if they had been fully signed by an authorized officer of the Company and sealed with the Company seal . This Power of Attorney is made and executed by authority of the following resolutions adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty- fifth day of September , 2012 : Resolved : That the President , any Senior Vice President or Vice- President ( each an " Authorized Officer " ) may execute for and in behalf of the Company any and all bonds , recognizances , contracts of indemnity , and all other writings obligatory in the nature thereof , and affix the seal of the Company thereto ; and that the Authorized Officer may appoint and authorize an Attorney - in - Fact to execute on behalf of the Company any and all such instruments and to affix the Company seal thereto ; and that the Authorized Officer may at any time remove any such Attorney - in - Fact and revoke all power and authority given to any such Attorney- in - Fact . Resolved : That the Attorney - in - Fact may be given full power and authority to execute for and in the name and on behalf of the Company any and all bonds , recognizances , contracts of indemnity , and all other writings obligatory in the nature thereof , and any such instrument executed by any such Attorney - in - Fact shall be as binding upon the Company as if signed and sealed by an Authorized Officer and , further , the Attorney - in - Fact is hereby authorized to verify any affidavit required to be attached to bonds , recognizances , contracts of indemnity , and all other writings obligatory in the nature thereof . This power of attorney is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty - fifth day of September , 2012 : Resolved : That the signature of an Authorized Officer, the signature of the Secretary or the Assistant Secretary , and the Company seal may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing an Attorney- in - Fact for purposes only of executing and sealing any bond , undertaking , recognizance or other written obligation in the nature thereof, and any such signature and seal where so used , being hereby adopted by the Company as the original signature of such officer and the original seal of the Company , to be valid and binding upon the Company with the same force and effect as though manually affixed . IN WITNESS WHEREOF , ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and the seal of the Company to be affixed this first day of January , 2023 . 0 917 ' Qj cUFtP OR4 / 0 al ' CI) SEAL ` in =_ 198E o By � - STATE OF MINNESOTA I ~Zb Fw yOC1/4 kb / Kolar , Vice President an General Counsel " ) , a • Sarah A . o ce Preside d HENNEPIN COUNTY On this first day of January , 2023 , before me personally came Sarah A . Kolar , Vice President and General Counsel of ATLANTIC SPECIALTY INSURANCE COMPANY , to me personally known to be the individual and officer described in and who executed the preceding instrument , and she acknowledged the execution of the same , and being by me duly sworn , that she is the said officer of the Company aforesaid , and that the seal affixed to the preceding instrument is the seal of said Company and that the said seal and the signature as such officer was duly affixed and subscribed to the said instrument by the authority and at the direction of the Company . •'' 0• 1• r� ' '•• ALISON D . NASH - TROUT • rK; + '• ° NOTARY PUBLIC - MINNESOTA 11 / 5 : pr• _ My Commission Expires :; % ; ;rio January 31 , 2030 Notary Public I , the undersigned , Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY , a New York Corporation , do hereby certify that the foregoing power of attorney is in full force and has not been revoked , and the resolutions set forth above are now in force . Signed and sealed . Dated 8th day of October , 2025 . .t� ' %( M I .k 'S `' t , Q �pfkP0 Rq �.e n go) SEAL nil `e 1986 o This Power of AttoeY axP ires ';?d �F rn w Yo� , � b January 31 , 2030 "'"�1 b • \-- • ' Kara L . B . Barrow Secretary Please direct bond verifications to surety0intactinsurance . com Hello