Loading...
HomeMy WebLinkAbout20251144.tiffu�M .. COLORADO Department of Public Health b Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 April 28, 2025 To whom it may concern: RECEIVED APR 2 8 2025 WELD COUNTY COMMISSIONERS On April 28, 2025, the Air Pollution Control Division will begin a 30 -day public notice period for Public Service Company - Yosemite Air Blend Plant. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. Enclosure /7t7 ;. rt,61i c 6 Le(,0 3b) -z5 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 CDPHE Website Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director cam'. PL CD El MUC)) i-+L. LDS �lJ (CHlcxIDT) I 1>ktIsF3), Dv (3C) 1-11Z3IZ-5 2025-1144 Air Pollution Control Division 474' Notice Of A Proposed Renewal Title V Operating Permit Warranting Public Comment Website Title: Public Service Company - Yosemite Air Blend Plant - Weld County Notice Period Begins: April 28, 2025 Notice Period Ends: May 28, 2025 NOTICE is hereby given that an application to renew an Operating Permit has been submitted to the Colorado Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado 80246-1530, for the following source of air pollution: Applicant: Public Service Company 1800 Larimer St. Suite 1300 Denver, CO 80202 Facility: Yosemite Air Blend Plant Public Service Company has applied to renew the Operating Permit for the Yosemite Air Blend Plant in Weld County, CO. This facility consists of six gas -fired air compressors used for compressed air natural gas blending, under Standard Industrial Classification 4922. In addition, the other significant emission units included in Section II of this permit include two emergency generators. E001 and E002 were modified to lower the emission factors/emission limits for NOx in order to comply with the requirements of Colorado Regulation No. 26, Part B, Section I.D.6. E003, E004, E005, and E006 were modified to lower the emission factors/emission limits for NOx, CO, and/or VOC in order to comply with the requirements of Colorado Regulation No. 26, Part B, Section I.D.5. Each modification resulted in pure decreases of emissions for the facility for the modified criteria pollutants. A copy of the application, including supplemental information, the Division's analysis, and a draft of the Renewal Operating Permit 02OPWE247 are available on the Division's website. The Division has made a preliminary determination of approval of the application. Based on the information submitted by the applicant, the Division has prepared the draft renewal operating COLORADO 2.02 1 I IRIIP H..lD°°'th 66evlronm.°nt permit for approval. Any interested person may contact the Division at cdphe_apcd_title_v@state.co.us to obtain additional information. Any interested person may submit written comments to the Division concerning 1) the sufficiency of the preliminary analysis, 2) whether the permit application should be approved or denied, 3) the ability of the proposed activity to comply with applicable requirements, 4) the air quality impacts of, alternatives to, and control technology required on the source or modification, and 5) any other appropriate air quality considerations. Any interested person may submit a written request to the Division for a public comment hearing before the Colorado Air Quality Control Commission (Commission) to receive comments regarding the concerns listed above as well as the sufficiency of the preliminary analysis and whether the Division should approve or deny the permit application. If requested, the hearing will be held before the Commission within 60 days of its receipt of the request for a hearing unless a longer time period is agreed upon by the Division and the applicant. The hearing request must: 1) identify the individual or group requesting the hearing, 2) state his or her address and phone number, and 3) state the reason(s) for the request, the manner in which the person is affected by the proceedings, and an explanation of why the person's interests are not already adequately represented. The Division will receive and consider the written public comments and requests for any hearing for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use this web form. This page also includes guidance for public participation • Send an email to cdphe apcd airpermitcomments@state.co.us • Send comments to our mailing address: Title V Operating Permits Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 NOTE: Comments submitted to the Division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered 2.02 COLORADO gitwoh==‘,2 I confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. Hearing requests may be submitted to the email address or the mailing address noted above. Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR S 70.8(a)(1) and 40 C.F.R. S 70.8(a)(1)(ii)). 45 -Day EPA Review Period Start Date: April 29, 2025 45 -Day EPA Review Period End Date: June 13, 2025 2.02 ,ICOLORADO 3 n�..tt oe tug H�tkh 6 Envfronmsnt Hello