Loading...
HomeMy WebLinkAbout20252988.tiff__EL,..._...... COUNTY, CO lif LAND USE APPLICATION SUMMARY SHEET Planner: Angela Snyder Case Number: COZ25-0002 Applicant: Bowtie Properties LLC c/o Harvey Houston 517 N 71st Avenue, Greeley, CO 80634 Hearing Date: October 7, 2025 Request: Change of Zone from the A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District Legal Being part of the SE4 of Section 19, Township 1 North, Range 66 West of the 6th Description: Principal Meridian, Weld County, Colorado Location: North of and adjacent to E Crown Prince Blvd (CR 6), west of and adjacent to County Road 27 Acres: +/- 1.956 acres Parcel #: 1471-19-0-00-020 The criteria for review of this Change of Zone are listed in Section 23-2-30 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: ➢ City of Fort Lupton, referral dated August 20, 2025 ➢ Weld County Department of Planning Services — Development Review, referral dated August 18, 2025 The Department of Planning Services' staff has received referral responses without comments from the following agencies: ➢ Weld County Sheriff's Office, referral dated July 18, 2025 ➢ Fort Lupton Fire Protection District, referral dated July 23, 2025 ➢ Colorado Department of Transportation, referral dated July 23, 2025 ➢ Weld County Oil and Gas Energy Department, referral dated July 23, 2025 ➢ Weld County Department of Planning Services — Code Compliance, referral dated July 21, 2025 The Department of Planning Services' staff has not received responses from the following agencies: ➢ City of Brighton ➢ West Adams Conservation District COZ25-0002 I Bowtie Properties LLC Page 1 of 5 Narrative: The request is to rezone a property from the A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District. Potential uses for 1-2 zoned properties can be found in Section 23-3-320 of the Weld County Code. The property has been used as a business since at least 1927. Nonconforming Use NCU-87, approved July 16, 2015, documents the use of the property for a gas station, store, and well pump repair business, with up to eight (8) commercial vehicles, and ten (10) employees. This rezoning request is the result of a Court Order, Case Number 22-C-34216, dated September 21, 2022, related to zoning violation case ZCV21-00188 due to the presence of a commercial business exceeding the limitations of the established NCU-87. The Court Complaint, dated March 3, 2022, cites a directional drilling business with outdoor vehicle storage and repair. The applicant was ordered to submit a Change of Zone application and a Site Plan Review application to correct the violation. The Change of Zone application was submitted over the last three (3) years and was deemed complete on July 18, 2025. If the rezoning request is approved, the applicant will need to submit a Site Plan Review application that meets Weld County requirements. If the request is denied, the Applicant will need to remove all uses on the property that exceed NCU-87. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. — That the proposal is consistent with Chapter 22 [Comprehensive Plan] of the Weld County Code. The following goals and objectives from the Weld County Comprehensive Plan are relevant to this request: Section 22-2-30.B. Locate urban development in urban areas. 1. Encourage annexation of urban -scale development. Zone changes and subdivisions within one -quarter mile of municipal limits are strongly discouraged. Property owners who want to rezone or subdivide their property are encouraged to contact the municipality about annexation. The area surrounding the subject property is a highly -developed industrial area. Locating industrial uses in this area reduces potential nuisances to residential and agricultural areas in the County. It promotes an efficient use of infrastructure and promotes synergy with other similar industrial users. The subject property is adjacent to both the City of Fort Lupton and the City of Brighton. The property is located within the Urban Growth Area for the City of Fort Lupton, and not for the City of Brighton, in accordance with an intergovernmental agreement between the two cities. The property is located within the Coordinated Planning Agreement Area of the City of Fort Lupton. In both the Notice of Inquiry dated December 12, 2024 and in the referral response dated August 20, 2025, submitted with the application, the City expressed interest in annexation of the property. The Applicant was encouraged to pursue annexation to the City of Fort Lupton. A pre -annexation agreement is requested as a condition of approval. Section 22-2-40.A. Support compatible economic development opportunities. 1. Identify target areas where the County is able to encourage shovel -ready commercial and industrial development. COZ25-0002 I Bowtie Properties LLC Page 2 of 5 The site is located within a Weld County Opportunity Zone on the Future Land Use Map. The property has already been used for industrial uses for almost one hundred (100) years. Rezoning the property acknowledges the existing industrial use of the property, facilitating the continuation and expansion of industrial uses in the future. B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. The adjacent surrounding lands located in the City of Fort Lupton are zoned 1-2 (Heavy Industrial) used predominantly for mining and batching. Adjacent lands located in the City of Brighton are zoned 1-1 (Light Industrial) and are currently the site of Vestas, an industrial wind turbine manufacturer. Surrounding lands located in unincorporated Weld County are zoned A (Agricultural), with an isolated residence directly adjacent to the north and a trucking company to the north of the residential property. On July 18, 2025, the Department of Planning Services sent notice to seven (7) surrounding property owners within five hundred (500) feet of the subject parcel. Three (3) notices were returned undeliverable. The Department of Planning Services received no responses from surrounding property owners. Any expansion of existing industrial uses beyond those identified in the Nonconforming Use Permit will have to be approved through a Site Plan Review, Use by Special Review, or a Zoning Permit process, which will include Conditions of Approval and Development Standards to mitigate potential nuisances. C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. The property is currently served by a well for potable water, permit #276221. The permit indicates that the well can be used for business purposes. The site has an existing onsite wastewater treatment system for a shop, permit #SP17-00340. Public sewer is not required for industrial uses. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. Per Section 23-2-30.A.4, a Change of Zone to an industrial district requires that the property abut a paved road. The site directly abuts two paved roads. East Crown Prince Blvd (County Road 6) is maintained by the City of Fort Lupton and is classified on their transportation map as an arterial. County Road 27 is maintained by Weld County and is also classified as an arterial. Both arterial roads are capable of withstanding industrial traffic. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. The site is not located within any overlay district officially adopted by the County: the A -P (Airport) Overlay District, Floodplain Management Overlay District, Historic Townsite Overlay, Geologic Hazard Overlay District, 1-25 Overlay District, Agricultural Heritage Overlay District, or (MS4) Municipal Separate Storm Sewer System area. COZ25-0002 I Bowtie Properties LLC Page 3 of 5 2) Section 23-2-30.A.5.b. - That the proposed rezoning will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. According to the Mineral and Aggregate Evaluation prepared by Northern Colorado Geotech dated February 8, 2023, the site likely contains deposits of sand and gravel aggregate, but the size of the property makes extraction not commercially viable. There is no evidence of commercially viable deposits of quarry rock or minerals. The proposed rezoning will not interfere with the present or future extraction of a commercially viable mineral deposit. 3) Section 23-2-30.A.5.c. - If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations can be overcome and that the limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to the development of the property. The Natural Resources Conservation Services (NRCS) Soil Survey submitted with the application indicates that site consists of Altvan loam soils, which are well drained and "not limited" for small commercial buildings. The soil conditions of the site do not present moderate or severe limitations to future development. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' Staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat, evidence of such shall be submitted in writing to the Weld County Department of Planning Services of an executed pre -annexation agreement between the applicant and the City of Fort Lupton. (Department of Planning Services) 2. The Change of Zone plat shall be amended to delineate the following: A. All pages of the plat shall be labeled COZ25-0002. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.C and D. of the Weld County Code. (Department of Planning Services) C. All recorded easements shall be shown and dimensioned on the Change of Zone plat. (Department of Planning Services) D. County Road 27 is a paved road and is designated on the Weld County Functional Classification Map as an arterial road which requires 140 feet of right-of-way at full buildout. The applicant shall delineate and label the future right-of-way, existing right-of-way (along with the documents creating the existing right-of-way), and the physical location of the road. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Development Review) E. This portion of County Road 6 is under the jurisdiction of the City of Brighton. Please contact the City to verify the right-of-way and upon verification, show and label it on the plat. (Development Review) F. The following notes shall be delineated on the Change of Zone plat: 1) The Change of Zone, COZ25-0002, allows for 1-2 (Medium Industrial) Zone District uses which shall comply with the requirements set forth in Chapter 23, Article III, Division 4 of the Weld County Code. (Department of Planning Services 2) The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) COZ25-0002 I Bowtie Properties LLC Page 4 of 5 3) Any future structures on site must obtain the appropriate building permits. (Department of Planning Services) 4) Water service may be obtained from an appropriately permitted well. (Department of Planning Services) 5) The property is not currently served by a municipal sanitary sewer system. Sewage disposal may be by an on -site wastewater treatment system (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Planning Services) 6) The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 7) The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. (Development Review) 8) There shall be no parking or staging of vehicles on public roads or within public rights -of -way. On -site parking shall be utilized. (Development Review) 9) The historical flow patterns and runoff amounts will be maintained on the site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to runoff rate and velocity increases, diversions, concentration and/or unplanned ponding of stormwater runoff. (Development Review) 3. Upon completion of Conditions of Approval 1. and 2. above, the applicant shall submit one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-50.C. and D. of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one -hundred -twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 4. If a plat has not been recorded within one hundred twenty (120) days of the date of the approval of the Change of Zone (COZ), or within a date specified by the Board of County Commissioners, the Board may require the landowner to appear before it and present evidence substantiating that the COZ has not been abandoned and that the applicant possesses the willingness and ability to record the plat. The Board of County Commissioners may extend the date for recording the plat. If the Board determines that conditions supporting the original approval of the COZ cannot be met, the Board may, after a public hearing, revoke the COZ. 5. In accordance with Appendix 5-J of the Weld County Code, should the plat not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional 3 -month period. 6. Any approved amendments to the Official Zoning Map shall be effective immediately upon approval by the Board of County Commissioners unless otherwise specified by the approving resolution of the Board of County Commissioners. However, no building permit shall be issued, and no use shall commence on the property until the plat is recorded and a land use permit perfected. COZ25-0002 I Bowtie Properties LLC Page 5 of 5 861 / September 5, 2025 COUNTY, CO Nicole Nies 5350 South Roslyn Street, Suite 100 Greenwood Village, CO 80111 DEPARTMENT OF PLANNING SERVICES 1402 North 17th Ave Greeley, CO 80631 Website: www.weld.gov Email: asnyder@weldgov.com Phone: (970) 400-3557 Fax: (970) 304-6498 Subject: COZ25-0002 - Change of Zone from the A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District On parcel(s) of land described as: Part of the SE1/4 of Section 19, Township 1 North, Range 66 West of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on October 7, 2025 at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on November 12, 2025 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://aca- prod.accela.com/WELD/ Respectfully, Angela Snyder Planner Hello