HomeMy WebLinkAbout20253058.tiffa
COLORADO
Department of Public
Health 6 Environment
Weld County - Clerk to the Board
1150 0 St
PO Box 758
Greeley, CO 80632
November 5, 2025
To whom it may concern:
RECEIVED
NOV ;2Lizj
WELD COUNTY
COMMISSIONERS
On November 5, 2025, the Air Pollution Control Division will begin a 30 -day public notice
period for DCP Operating Company, LP - Mewbourn Natural Gas Processing Plant. A copy of
this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public notice period. Please reference the public notice for instructions on
submitting comments.
Enclosure
1Pu \i G ?1eu►,ew
1\ \ cu ias
4300 Cherry Creek Drive 5., Denver, CO 80246-1530 P 303-692.2000 CDPHE Website
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
C-C*.PLLI)E.\Mc\\
PtA3 LC A \ \ \\ sHH \S%>
ii o6) S
2025-3058
Air Pollution Control Division
atig,Notice Of A Proposed Renewal Title V Operating Permit Warranting
Public Comment
Website Title: DCP Operating Company, LP - Mewbourn Natural Gas Processing Plant - Weld County
Notice Period Begins: November 5, 2025
Notice Period Ends: December 5, 2025
NOTICE is hereby given that an application to renew an Operating Permit has been submitted to
the Colorado Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado
80246-1530, for the following source of air pollution:
Applicant DCP Operating Company, LP
3026 4th Avenue
Greeley, CO 80631
Facility: Mewbourn Natural Gas Processing Plant
DCP Operating Company, LP has applied to renew the Operating Permit for the Mewbourn Natural
Gas Processing Plant in Weld County, CO. This facility is a natural gas processing plant. This
renewal includes the incorporation of multiple significant modifications in order to include the
most recent versions of the construction permit. There are emission changes associated with this
permit action due to the expansion of the processing trains (Mewbourn II at Ill) and the
decommissioning of the previously permitted train (Mewbourn I). The emission changes include a
permitted decrease of 43.5 tons per year of NOx, a decrease of 16.8 tons per year of VOC, an
increase of 13.5 tons per year of CO, an increase of 18.3 tons per year of PM10/PM2.5/TSP, and an
increase of 54.7 tons per year of SOx. A copy of the application, including supplemental
information, the Division's analysis, and a draft of the Renewal Operating Permit 95OPWE062 are
available on the Division's website. The Division has made a preliminary determination of approval
of the application. Based on the information submitted by the applicant, the Division has prepared
the draft renewal operating permit for approval. Any interested person may contact the Division at
cdphe_apcd_title_v@state.co.us to obtain additional information. Any interested person may
k
2.02 1 I a
COLORADO
arDepartment of Public
6 Environment
submit written comments to the Division concerning 1) the sufficiency of the preliminary analysis,
2) whether the permit application should be approved or denied, 3) the ability of the proposed
activity to comply with applicable requirements, 4) the air quality impacts of, alternatives to, and
control technology required on the source or modification, and 5) any other appropriate air quality
considerations. Any interested person may submit a written request to the Division for a public
comment hearing before the Colorado Air Quality Control Commission (Commission) to receive
comments regarding the concerns listed above as well as the sufficiency of the preliminary analysis
and whether the Division should approve or deny the permit application. If requested, the hearing
will be held before the Commission within 60 days of its receipt of the request for a hearing unless
a longer time period is agreed upon by the Division and the applicant. The hearing request must: 1)
identify the individual or group requesting the hearing, 2) state his or her address and phone
number, and 3) state the reason(s) for the request, the manner in which the person is affected by
the proceedings, and an explanation of why the person's interests are not already adequately
represented. The Division will receive and consider the written public comments and requests for
any hearing for thirty calendar days after the date of this Notice.
Comments may be submitted using the following options:
• Use this web form. This page also includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments@state.co.us
• Send comments to our mailing address:
Title V Operating Permits Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the Division will be uploaded to an online document repository and
will be accessible to the public. Your comments and the division's responses are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comments.
2.02 2 I
COLORADO
Department of Public
Health 613nvim=.
Hearing requests may be submitted to the email address or the mailing address noted above.
Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR §
70.8(a)(1) and 40 C.F.R. § 70.8(a)(1)(ii)).
45 -Day EPA Review Period Start Date: November 6, 2025
45 -Day EPA Review Period End Date: December 22, 2025
2.02
31
COLORADO
Department o! Publlo
Health 6 Environmext
Hello