Loading...
HomeMy WebLinkAbout20251803.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 126 Between County Road 21 and U.S. Highway 85 for Approximately Four (4) Days, for Railroad Track Construction Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 126 Between County Road 21 and U.S. Highway 85, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective July 8, 2025, for approximately four (4) days for railroad track construction. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 126 Between County Road 21 and U.S. Highway 85, be temporarily closed, with said closure being effective July 8, 2025, for approximately four (4) days for railroad track construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:5oOzs), D:SPo.+clcSP 0-7/02/25 2025-1803 EG0024 Temporary Closure — County Road 126 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 25th day of June, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-1803 EG0024 MEMORANDUM TO: Clerk to the Board DATE: June 23, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 126 between WCR 21 and SH 85 from 7/8/2025 thru 7/11/2025 for railroad track construction. See attached closure diagram. 2025-1803 cv/25 EC 00Zct www.invarion.com • Q CC:) N r I ion _ C.4 Y 'NCR 124 s • a rs-s•s • • a so-aar • ► • a ado • in/ t.)4 k i 1 1 E .41 t t m N N WCRt18 � s a .a a.a-► a s a 4.1••••••••a agars. •• a .•.�♦ • i 1 1 1 1 1 WCR 120 71- W �� • WCR 128 res", �s N N. ilt.Cfl Cfl N N �}. N 1r U 1 1 1 1 W CR 122 . • • ..a.t4. • a a s.a-11. ► PROJECT # ROAD CLOSURE DESCRIPTION WCR Closed for 126 RXR 7/8/2025 Track between Construction thru WCR 7/11/2025 21 and SH 85 NOTICE TO PUBLIC Road Message signs and board barricaded to be used DETOUR ROUTE Preferred 1-25 to WCR Detour 100 : to SH 85 NOTES ADT RXR of Track WCR is:761/2023 Construction/Realignment of Tracks Prepared 6/23/2025 by: Ryan Reynolds Hello