Loading...
HomeMy WebLinkAbout20251567.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Extension of Temporary Closure of County Road 17 Between County Road 28 and State Highway 66 for Approximately an Additional Three (3) Weeks, for Unanticipated Delays Due to Inclimate Weather and Irrigation issues Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, on the 19th day of February, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board determined that conditions existed which made it necessary to temporarily close County Road 17, between County Road 28 and State Highway 66, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective February 26, 2025, for approximately three and a half (3.5) months, for a bridge replacement, and Whereas, on the 9th day of June, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to extend said temporary closure of County Road 17, between County Road 28 and State Highway 66, with said extended closure being effective June 13, 2025, for approximately an additional three (3) weeks through July 2, 2025, for unanticipated delays due to inclimate weather and irrigation issues, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. cc So CRS), D :SPv.1-ct,, C SP 06/19/AS 2025-1567 EG0024 Extension to Temporary Closure — County Road 17 Page 2 Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 17, between County Road 28 and State Highway 66, be, and hereby is, extended, with said extended closure being effective June 13, 2025, for approximately and additional three (3) weeks through July 2, 2025, for unanticipated delays due to inclimate weather and irrigation issues, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 9th day of June, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-1567 EG0024 MEMORANDUM TO: Clerk to the Board DATE: June 4, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to extend the road closure on WCR 17 between SH 66 and WCR 28 to 7/2/2025. The extension is being requested due to weather delays and irrigation issues. The original closure dates were 2/26/25 thru 6/13/25 for bridge replacement. See attached closure diagram. 2025-1567 Lo/9 Ec ouzo+ www.invanon.com n^r or W20 -1F • #41 -411-41- S w lF 44 -i-.l-0- Or I °° �U 1}y ea -10-11%a -a -e-s-.-... a -1.-•-."s V W20-Itilffigb s Np-. a� rr6 • V C.\ rtaaas--w.s se�-►rya WCR 28 1�1l20-lr �t�-r w ♦ -w-� I Al 'ease° e w 1 w re -or! yr if -• i"iT'f'! • r + 411 M4-9 (41.1.1.8noi3a M4-9 a M4-9 ti1 M4-9 PROJECT # BR -145 BRIDGE 17/28A ROAD CLOSURE DESCRIPTION WCR Closed for Bridge 17 2/26/2025 between Replacement SH thru 66 and 7/2/2025 WCR 28 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE SH WCR WCR 66 19 28 between between between WCR SH WCR 17 66 and and 19 and WCR WCR WCR 19 28 17 1 1 mile mile 1 mile paved paved gravel NOTES ADT Bridge Bridge of WCR Replacement: is .5 is: South 92/2024 of SH Lost 66 Chance on WCR Ditch 17 Prepared 2/12/2025 by: Ryan Reynolds Hello