Loading...
HomeMy WebLinkAbout20252289.tiffCENTRAL WELD COUNTY WATER DISTRICT January 16, 2025 David Kamin Public Service-Xcel Energy 1800 Lairmer St. Suite 1300 Denver, CO 80202 RE: Additional Water Service Tap 240 Dear Mr. Karmin, This letter is in response to a request for water service to serve the following property described as follows: 21173 ALL SEC 10 3 67 (16R8SHT) Parcel: #120910000006 Water service is presently available to the above described property through 'lap 240 located on County Road 19.5 between County Road 34 & County Road 36. We understand that the customer is interested in adding a dwelling or business to their existing tap. One water tap may serve a business or a second residence providing that there is only one owner involved and one specific parcel of property. The existing tap has a 55,642,000 gallon annual water allotment. The tap holder can be provided with additional water through the existing tap if the District has water available. lithe annual water allotment for the tap is exceeded, a CBT surcharge will be assessed on all additional water usage. The CBT surcharge is currently $15.00 per thousand gallons. The tap holder should also expect to pay a multiple unit surcharge of $10.00, which will be added to the monthly bill. The following restrictions apply: 1. Water service which involves two or more residences on the same water tap generally means that both pressures and flows are inadequate during the periods of peak usage. The District's responsibility ends at the customer's side of the meter yoke in the meter pit and poor pressures or flows attributed to the second residences are the responsibility of the customer. 2. Once a customer's water service has been designated as having an additional residence involved and a multiple unit surcharge has been assessed to the account, the charge will remain on the account indefinitely, regardless of whether the additional residences are occupied or not. In the event that the additional residence has been removed from the property, or the water service line has been permanently disconnected to the additional residence, the customer may request that the dwelling unit charge be removed from their account. This request must be in writing, stating the circumstances involved, and will be addressed by the Board at the next regular scheduled meeting. The customer will then be advised of the Board's decision in writing. 3. In the event that the parcel of property involving additional residences is sold, so that the "one owner - one property" rule is violated, a second water tap will have to be purchased to serve the additional residence. 2235 2nd Avenue • Greeley, Colorado 80631 • Phone (970) 352-1284 • Fax (970) 353-5865 Stan Linker, District Manager CENTRAL WELD COUNTY WATER DISTRICT For your records, Tap 240 year to date usage is 9,494,000 gallons_ Water usage was 81,886,000 gallons during the 2024 water year. Water usage was 62,578,000 gallons during the 2023 water year. Water usage was 56,571,000 gallons during the 2022 water year. If you exceed 55.642,000 gallons usage in a water year, you should expect to pay a surcharge for any additional water. A water year is November 1 -October 3 I . If service from existing tap is determined to be insufficient, additional water service can be made available to this property with a new tap purchase, provided all requirements of Central Weld County Water District, Northern Colorado Water Conservancy District and the Bureau are satisfied. A water study, which includes a review of the District's system in this water service area, must be completed prior to an additional water tap being sold. A water tap installation is for a specific parcel of property and a customer will not be permitted to extend a service line from one parcel or property to another parcel to provide additional water service. If a landowner is negotiating an annexation to a City or Town, the terms of this letter become null and void and water service shall be obtained through the City or Town. If annexation is not being considered, this letter expires 120 days from date of issue, unless extended in writing by the District. The District will not notify, by separate letter, any prospective landowners of cost increases. The District has the right to review the annual allotment and compare it to actual usage to determine if additional raw water will be purchased and transfen-ed to the District by Tap Holder. It is your responsibility to confirm with your local Fire Protection Authority if fire flow water capacity is required for your project. If you have any questions regarding the above, please contact this office. Sincerely, CENTRAL WELD COUNTY WATER DISTRICT Stan Linker. District Manager S Lldc 2235 2nd Avenue • Greeley, Colorado 80631 • Phone (970) 352-1284 • Fax (970) 353-5865 Stan Linker, District Manager FORT ST. VRAIN GENERATING STATION COMBUSTION TURBINE UNIT 7 AND 8 SANITARY SEWER SERVICE Fort St. Vrain Station currently has a sanitary sewer system and a sewer vault that will continue in operation through and after construction of units 7 & 8. During construction the additional construction staff will be supported by mobile bathroom trailers with black water holding tanks. The produced sewage from the site construction staff will be disposed of via a sewer pump and haul service similar to how port -a -johns are maintained. • The plant currently has sewer produced from the main building's bathrooms, kitchens, and locker rooms (1) and flow into a septic tank (2) and then to the treatment ponds (3 & 4) before discharge to the site outfall. • An additional bathroom (one sink and toilet) located between units 3 and 4 feeds into a sewer vault with a high-level indicator (5). This vault is pumped out by a septic system sucker truck and hauled to a treatment facility. 1. Main Plant Building 2. Septic Tank 3. Sewage Treatment Lagoon 1 (note this lagoon has two sides) 4. Sewage Treatment Lagoon 2 5. Septic Vault at Unit 3-4 Chemistry Lab Weld County Site Selection and Construction of Major Facilities of a Public Utility Application FORT ST. VRAIN GENERATING STATION COMBUSTION TURBINE UNIT 7 AND 8 Weld County Site Selection and Construction of Major Facilities of a Public Utility Application Hello