HomeMy WebLinkAbout20252185.tiffw M,
COLORADO
Department of Public
Health b Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
August 4, 2025
To whom it may concern:
RECEIVED
AUG 0 4 2025
WELD COUNTY
COMMISSIONERS
On August 4, 2025, the Air Pollution Control Division will begin a 30 -day public notice period
for Black Diamond Rockies Storage and Terminals, LLC - Milton Crude Oil Terminal. A copy of
this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public notice period. Please reference the public notice for instructions on
submitting comments.
Enclosure
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 CDPHE Website
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
G6 : ? L (m q pi o , 44L (s)
i
--p(a) Cc Ic 1 !1(s7 r3),
cI4I. 5
2025-2185
Air Pollution Control Division
•
a.
�Y�11 Notice Of A Proposed Title V Operating Permit Warranting Public
Comment
Website Title: Black Diamond Rockies Storage and Terminals, LLC - Milton Crude Oil Terminal -
Weld County
Notice Period Begins: August 4, 2025
Notice Period Ends: September 3, 2025
NOTICE is hereby given that an Operating Permit application has been submitted to the Colorado
Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado 80246-1530, for the
following source of air pollution:
Applicant: Black Diamond Rockies Storage and Terminals, LLC
1400 Smith Street
Houston, TX, 77002
Facility: Milton Crude Oil Terminal
Black Diamond Rockies Storage and Terminals, LLC has applied for an Operating Permit for the
Milton Crude Oil Terminal in Weld County, CO. Facility is a crude oil storage and terminal facility. A
copy of the application, including supplemental information, the Division's analysis, and a draft of
Operating Permit 20OPWE412 are available on the Division's website. The Division has made a
preliminary determination of approval of the application. Based on the information submitted by
the applicant, the Division has prepared the draft operating permit for approval. Any interested
person may contact the division at cdphe_apcd_title_v@state.co.us to obtain additional
information. Any interested person may submit written comments to the Division concerning 1) the
sufficiency of the preliminary analysis, 2) whether the permit application should be approved or
denied, 3) the ability of the proposed activity to comply with applicable requirements, 4) the air
quality impacts of, alternatives to, and control technology required on the source or modification,
and 5) any other appropriate air quality considerations. Any interested person may submit a
written request to the Division for a public comment hearing before the Colorado Air Quality
2.02
1
COLORADO
Department of Public
Health 6 Envirorunent
Control Commission (Commission) to receive comments regarding the concerns listed above as well
as the sufficiency of the preliminary analysis and whether the Division should approve or deny the
permit application. If requested, the hearing will be held before the Commission within 60 days of
its receipt of the request for a hearing unless a longer time period is agreed upon by the Division
and the applicant. The hearing request must: 1) identify the individual or group requesting the
hearing, 2) state his or her address and phone number, and 3) state the reason(s) for the request,
the manner in which the person is affected by the proceedings, and an explanation of why the
person's interests are not already adequately represented. The Division will receive and consider
the written public comments and requests for any hearing for thirty calendar days after the date of
this Notice.
Comments may be submitted using the following options:
• Use this web form. This page also includes guidance for public participation
• Send an email to cdphe apcd airpermitcomments@state.co.us
• Send comments to our mailing address:
Title V Operating Permits Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the Division will be uploaded to an online document repository and
will be accessible to the public. Your comments and the division's responses are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comments.
Hearing requests may be submitted to the email address or the mailing address noted above.
Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR S
70.8(a)(1) and 40 C.F.R. S 70.8(a)(1)(ii)).
45 -Day EPA Review Period Start Date: August 5, 2025
2.02 2 l e e
COLORADO
DepaxtmentoEPublie
Health 6 Envimtu 1Z
45 -Day EPA Review Period End Date: September 19, 2025
2.02 3 I a
COLORADO
Department of Public
Health 6 Environment
Hello