Loading...
HomeMy WebLinkAbout20252377.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Extension of Temporary Closure of County Road 72 Between County Roads 33 and 35 for Approximately an Additional Three (3) Weeks, for Unanticipated Delays Due to Additional Sub -Grade Road Preparation Equipment and Materials, and Property Owner Accommodations Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, on the 30th day of June, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board determined that conditions existed which made it necessary to temporarily close County Road 72, between County Roads 33 and 35, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective July 14, 2025, for approximately six (6) weeks for storm water improvements, roadway construction, and paving, and Whereas, on the 20th day of August, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to extend said temporary closure of County Road 72, between County Roads 33 and 35, with said extended closure being effective August 22, 2025, for approximately an additional three (3) weeks through September 12, 2025, for unanticipated delays due to additional sub -grade road preparation equipment and materials, and property owner accommodations, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. c •.SoCs -s), D: spo.-t-ck CS P oS/,2.6f25 2025-2377 EG0024 Extension to Temporary Closure — County Road 72 Page 2 Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 72, between County Roads 33 and 35, be, and hereby is, extended, with said extended closure being effective August 22, 2025, for approximately an additional three (3) weeks through September 12, 2025, for unanticipated delays due to additional sub -grade road preparation equipment and materials, and property owner accommodations, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 20th day of August, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppler: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-2377 EG0024 MEMORANDUM TO: Clerk to the Board DATE: August 15, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Connell Resources, on behalf of Weld County Public Works, is requesting to extend the closure of CR 72 between CR 33 and CR 35 from original end date of 8/22/2025 through 9/12/2025 for storm water improvements, road construction and paving. Delays in completion were due to issues arising during the road subgrade prep which required additional equipment and materials, and needing to make additional accommodations for property owners. Original closure dates: 7/14/2025 through 8/22/2025 See attached closure diagram. 2025-2377 DETOUR OV3HV '480M avoa ROAD WORK AHEAD Allow Access to Residents on either the East or West End School Add flagger symbols and and flagger if we need to stop traffic 0V3HV MHOM avow DETOUR ROAD WORK AHEAD www.invarion.com Legend Comments: Plan not drawn to scale Plan will conform to the latest edition of the MUTCD and all devices used will be in compliance of the NCHRP 350 Sign distancing will be a minimum of 350 feet for speeds 40 and over and 100 feet for speeds under 40 Taper will be a minimum of L for Lane Closures Taper will be a minimum of 1/2 L for Lane Shifts Taper will be a minimum of 1/3 L for Shoulder Closures Hello