HomeMy WebLinkAbout20250254.tiffXcel Energy
WILL SERVE LETTER
July 30, 2024
Dan Baker
Weld County Road Project
Re: Weld County Road Project
Dear : Dan Baker,
This letter is to confirm that Xcel Energy is your utility provider for electrical service. In accordance with our tariffs, on file
with and approved by the Colorado Public Utilities Commission, electric facilities can be made available to serve the project
at 22169 Weld County Road 35 Lots 2, 3, and 5.
Your utility service(s) will be provided after the following steps are completed:
• Application submitted to Public Service's "Builders Call Line (BCL) "— once your application is accepted you
will be assigned a design department representative who will be your primary point of contact
• Utility design is completed — you must provide your design representative with the site plan, the one line
diagrams, and panel schedules for electric and gas loads if applicable
• All documents provided by design representative are signed and returned
• Payment is received
• Required easements are granted - you must sign and return applicable easement documents to your Right -of -
Way agent
• Site is ready for utility construction
A scheduled in-service date will be provided once these requirements have been met.
It is important to keep in mind that the terms and conditions of utility service, per our tariffs, require that you provide
adequate space and an easement on your property for all gas and electric facilities required to serve your project, including but
not limited to gas and electrical lines and meters, transformers, and pedestals. General guidelines for these requirements can
be found at Site Requirements. https://www.xcelenergy.com/staticfiles/xe-responsive/Ad min/Managed Documents
& PDFs/Xcel-Energy-Standard-For-Electric-Installation-and-Use.pdfEasement requirements can be found at Utility
Design and Layout.
Xcel Energy looks forward to working with you on your project and if I can be of further assistance, please contact me at the
phone number or email listed below.
Sincerely,
Taylor Cronic
Data Entry Specialist
Pike Engineering LLC
555 Zang Street Suite 250
Lakewood, CO 80228
Pike Engineering
Version July 2, 2018
Mailing address: Pike Engineering
555 Zang, Suite 250
Lakewood, CO 80228
Version July 2, 2018
To Dan Et Debra Baker
32776 Vista Lake Rd
Greeley, CO 80631
RECEIVED FROM
(''
XFOR
ACCOUNT
PAYMENT
BAL. DUE
19000`
in ill kl_12114 baKer
'-44&t4144 &kiwis e6i f i DOLLARS
1-04
III ►-:td, Ls
.,k- eucti-ter -
OCASH JL1 )C5 -114 -10(1)Q �c4 1 4 5
( CHECK FHVM O0 COO I C'e4,3 '-iT7
ORDER p
OCREDIT � r" "T
CARD BY
3-11
JOB Tap Fees for MINK24-0001
Parcel 105711400002
DICE
4O. 090424
ER 4, 2024
DESCRIPTION
UNIT PRICE
LINE TOTAL
2
5/8" tap - tot 2
Budget tap - lot 3
Quarter tap - tots 1 and 5
$84,000.00
$49,000.00
$31,500.00
$84,000.00
$49,000.00
$63,000.00
CCCtOitor,3
SUBTOTAL
SALES TAX
TOTAL
$196,000.00
$196,000:'00
Hello