Loading...
HomeMy WebLinkAbout20250890.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 28 Between County Roads 19 and 21 for Approximately Five (5) Days, for Culvert Replacement Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 28, between County Roads 19 and 21, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective April 7, 2025, for approximately five (5) days for a culvert replacement. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 28, between County Roads 19 and 21, be temporarily closed, with said closure being effective April 7, 2025, for approximately five (5) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc; So (RS), D;Spatcv‘, GS o'i /03/25 2025-0890 EG0024 Temporary Closure — County Road 28 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 31st day of March, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-0890 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 27, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 28 between WCR 19 and WCR 21 from 4/7/25 thru 4/11/25 for culvert replacement. See attached closure diagram. 2025-0890 3/31 ce)002_4 www.invarion.com M4-9 W20 -1F ra) M4-9 M4-10 W20 -1F s a 811-ar—r. is as sIlhaNia CR 28 1IN lop y aon" O rn O c a M4-9 W20 -1F DETOUR M4-9 M4-10 W20 -1F PROJECT #AN -59/2025 ROAD CLOSURE DESCRIPTION WCR Closed for culvert 28 4/7/2025 between replacement thru WCR 4/11/2025 19 and WCR 21 NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR SH WCR 19 66 21 between between between WCR WCR SH 28 19 and 66 and and WCR WCR SH 66 21 28 1 1 1 mile mile mile paved paved paved NOTES: ADT Culvert New: Culvert of 18" is WCR replaced CSPR .2 is: West 364/2024 is Irrigation: of WCR 21 Old: on 18" WCR Round 28 CMP Prepared 3/27/2025 by: Ryan Reynolds Hello