February 11, 2025
To Whom It May Concern:
RECEIVED
FEB 1 1 2025
WELD COUNTY
COMMISSIONERS
On February 11, 2025, the Colorado Air Pollution Control Division will begin a 30 -day public
comment period for Red Hawk Petroleum, LLC - Leggett 1-5H. A copy of this public notice is
enclosed.
Thank you for assisting the division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public comment period. Please reference the public notice for instructions
on submitting comments.
�OF _COO\
o 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.Qov/cdohe
�. � Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
i ft ejj.
DN
2-1l4-Fto (c,4lcKID ( ), D V
2jlly5
�5
2025-0467
Air Pollution Control Division
Notice of a Proposed Construction Permit Warranting Public Comment
Website Title: Red Hawk Petroleum, LLC - Leggett 1-5H - Weld County
Notice Period Begins: February 11, 2025
Notice is hereby given that an application for a proposed project or activity has been submitted to
the Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Red Hawk Petroleum, LLC
Facility: Leggett 1-5H
Well Production Facility
NWSW SEC 5 T7N R60W
Weld County
The proposed project or activity is as follows:
Red Hawk Petroleum, LLC submitted an application for equipment and routine or
predictable emissions (ROPE) at an existing oil and gas well production facility located in the ozone
non -attainment area. Upon reclassification of the 8 -Hour Ozone Control Area to "severe," the
facility had potential to emit above the NANSR/OP major source threshold. This project involves
establishing synthetic minor permit coverage for the facility.
The division has determined that this permitting action is subject to public comment requirements
under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to
the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to
avoid other requirements
The division has made a preliminary determination of approval of the application.
A copy of the application, the division's analysis, and a draft of construction permit number
13WE2603 are available on the division website: Air Permit Public Notices
of co-
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdohe
l*�*Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
\1a�6/
The division hereby solicits submission of public comments from any interested person concerning
the ability of the proposed project or activity to comply with the applicable standards and
regulations of the commission. The division will receive and consider written public comments for
thirty (30) calendar days after the date of this notice. Comments may be submitted using the
following options:
• Submit comments via web form: Form for Public Comment on Draft Permit
• Submit comments via email: cdphe apcd airpermitcomments@state.co.us
• Submit comments via mail:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, CO 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and
will be accessible to the public. Your comment(s) and the division's response(s) are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comment(s).