Loading...
HomeMy WebLinkAbout20250866.tiffCOLORADO Department of Public Health 8 Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 March 26, 2025 To Whom It May Concern: RECEIVED MAR 2 6 2025 WELD COUNTY COMMISSIONERS On March 26, 2025, the Colorado Air Pollution Control Division will begin a 30 -day public comment period for HighPoint Operating Corporation - Anschutz State 5-62-26_25 SWNW. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. of cocoa F9�''� 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdohe �* Jared Polls, Govemor I Jill Hunsaker Ryan, MPH, Executive Director � 3 31 Z'j (s,1-ICKi Dbl XkiI5$) 06Ci3C,) I I 3�z��zs 2025-0866 Air Pollution Control Division Notice of a Proposed Construction Permit Warranting Public Comment Website Title: HighPoint Operating Corporation - Anschutz State 5-62-26_25 SWNW - Weld County Notice Period Begins: March 26, 2025 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: HighPoint Operating Corporation Facility: Anschutz State 5-62-26_25 SWNW Well Production Facility SWNW quadrant of Section 26, Township 5N, Range 62WW Weld County The proposed project or activity is as follows: This project includes the modification of the produced water storage tanks source covered under point 004. This modification reflects a decrease in the yearly throughput and consequently a decrease in VOC, NOx, CO and HAPs emissions. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The division has made a preliminary determination of approval of the application. A copy of the application, the division's analysis, and a draft of construction permit number 19WE0839 are available on the division website: Air Permit Public Notices of CO� O hI 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.00lorado.gov/cdphe �• � 'S, W )•! Jared Polls, Govemor I Jill Hunsaker Ryan, MPH, Executive Director The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: • Submit comments via web form: Form for Public Comment on Draft Permit • Submit comments via email: cdphe apcd airpermitcomments@state.co.us • Submit comments via mail: Air Pollution Control Division - Oil & Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). pF CO�U� \� �; 4300 Cherry Creek Drive 5., Denver, CO 80246-1530 P 303-692-2000 www.colorado.Qov/cdphe Jared Polls, Govemor I Jill Hunsaker Ryan, MPH, Executive Director Hello