Loading...
HomeMy WebLinkAbout20252356.tiffCOLORADO • =j Department of Public ® Health b Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 August 18, 2025 To Whom It May Concern: RECEIVED AUG 18 2025 WELD COUNTY COMMISSIONERS On August 18, 2025, the Colorado Air Pollution Control Division will begin a 30 -day public comment period for PDC Energy, Inc. - Miller Et Burton. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Walt lei 1 S)zOl z6 ec, P. ?L (E4 4 M), ►-I t. Cbs), 2025-2356 a44.4-410 N4.- Air Pollution Control Division Notice of a Proposed Construction Permit Warranting Public Comment Website Title: PDC Energy, Inc. - Miller £t Burton - Weld County Notice Period Begins: August 18, 2025 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Miller a Burton Well Production Facility SWNW Sec 25 T4N R66W Weld County The proposed project or activity is as follows: PDC Energy, Inc. is requesting a permit modification to 15WE0704 which covers a condensate storage tank at a well -production facility located in the severe ozone nonattainment area. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to the following reason(s): • This source is requesting a federally -enforceable limit on the potential to emit to avoid other requirements. (Regulation Number 3, Part B, Section III.C.1.d. ) The division has made a preliminary determination of approval of the application. A copy of the application, the division's analysis, and a draft of construction permit number 15WE0704 are available on the division website: Air Permit Public Notices 4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: Submit comments via web form: Form for Public Comment on Draft Permit Submit comments via email: cdphe apcd airpermitcomments@state.co.us Submit comments via mail: Air Pollution Control Division - Oil 8 Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). 4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Hello