HomeMy WebLinkAbout20252480.tiffaIt -
COLORADO
Department of Public
Health b Environment
Weld County - Clerk to the Board
1150 0 St
PO Box 758
Greeley, CO 80632
September 2, 2025
To whom it may concern:
RECEIVED
SET 0 7 2025
WELD COUNTY
COMMISSIONERS
On September 2, 2025, the Air Pollution Control Division will begin a 30 -day public notice
period for DCP Operating Company, LP - 70 Ranch Compressor Station. A copy of this public
notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public notice period. Please reference the public notice for instructions on
submitting comments.
Thank you,
54;14,-
Jayden Bishop
Operating Permit Unit, Stationary Sources Program
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 CDPHE Website
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
LOA -I-1041 DD11>U14 1 I 5 t3), 0 (_)
q1217-5 2025-2480
Air Pollution Control Division
altoNotice of A Proposed Title V Operating Permit Warranting Public
Comment
�MIM�M
Website Title: DCP Operating Company, LP - 70 Ranch Compressor Station - Weld County
Notice Period Begins: September 2, 2025
Notice Period Ends: October 2, 2025
NOTICE is hereby given that an Operating Permit application has been submitted to the Colorado
Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado 80246-1530, for the
following source of air pollution:
Applicant: DCP Operating Company, LP
3026 4th Ave, Greeley, CO
Greeley, CO, 80631
Facility: 70 Ranch Compressor Station
DCP Operating Company, LP has applied for an Operating Permit for the 70 Ranch Compressor
Station in Weld County, CO. The facility is a natural gas compressor station A copy of the -
application, including supplemental information, the Division's analysis, and a draft of Operating
Permit 20OPWE424 are available on the Division's website. The Division has made a preliminary
determination of approval of the application. Based on the information submitted by the applicant,
the Division has prepared the draft operating permit for approval. Any interested person may
contact the division at cdphe_apcd_title_v@state.co.us to obtain additional information. Any
interested person may submit written comments to the Division concerning 1) the sufficiency of the
preliminary analysis, 2) whether the permit application should be approved or denied, 3) the ability
of the proposed activity to comply with applicable requirements, 4) the air quality impacts of,
alternatives to, and control technology required on the source or modification, and 5) any other
appropriate air quality considerations. Any interested person may submit a written request to the
Division for a public comment hearing before the Colorado Air Quality Control Commission
(Commission) to receive comments regarding the concerns listed above as well as the sufficiency of
2.02 1 ( a
COLORADO
Department of Publle
Health 6 Eavlror�mertt
the preliminary analysis and whether the Division should approve or deny the permit application. If
requested, the hearing will be held before the Commission within 60 days of its receipt of the
request for a hearing unless a longer time period is agreed upon by the Division and the applicant.
The hearing request must: 1) identify the individual or group requesting the hearing, 2) state his or
her address and phone number, and 3) state the reason(s) for the request, the manner in which the
person is affected by the proceedings, and an explanation of why the person's interests are not
already adequately represented. The Division will receive and consider the written public
comments and requests for any hearing for thirty calendar days after the date of this Notice.
Comments may be submitted using the following options:
• Use this web form. This page also includes guidance for public participation
• Send an email to cdphe apcd airpermitcomments®state.co.us
• Send comments to our mailing address:
Title V Operating Permits Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the Division will be uploaded to an online document repository and
will be accessible to the public. Your comments and the division's responses are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comments.
Hearing requests may be submitted to the email address or the mailing address noted above.
Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR §
70.8(a)(1) and 40 C.F.R. § 70.8(a)(1)(ii)).
45 -Day EPA Review Period Start Date: September 3, 2025
45 -Day EPA Review Period End Date: October 20, 2025
2.02 2 Is
COLORADO
I)epaxtment of Publie
Health 6 Envirotu tt
Hello