Loading...
HomeMy WebLinkAbout20252672.tiffLAND USE APPLICATION SUMMARY SHEET Planner: Diana Aungst Case Number: COZ25-0006 Owner: Affordable Owner, LLC c/o Gregorios Kranias 1492 County Road 11, Erie, CO 80516 Agent: Baseline Engineering Corporation c/o Tez Hawkins 112 N. Rubey Drive #210, Golden, CO 80403 Hearing Date: September 2, 2025 Request: Change of Zone from the A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District Legal Lot B of Lot Line Adjustment LLA25-0013; being the part of the SW4 of Section 25, Ti N, Description: R68W of the 6th P.M., Weld County, CO Location: East of and adjacent to County Road 11 and approximately 0.25 miles north of County Road 4 Parcel Size: +/- 32.25 acres Parcel No. 1467-25-0-00-020 1467-25-0-00-018 The criteria for review of this Change of Zone are listed in Section 23-2-30 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: ➢ Weld County Department of Planning Services — Development Review, referral dated July 22, 2025 The Department of Planning Services' staff has received referral responses without comments from the following agencies: ➢ Town of Erie, referral dated June 30, 2025 ➢ Town of Dacono, referral dated July 2, 2025 ➢ City of Northglenn, referral date June 25, 2025 ➢ Colorado Geological Survey, referral dated July 21, 2025 ➢ Weld County Sheriff's Office, referral dated June 24, 2025 ➢ Regional Transportation District, referral dated July 22, 2025 ➢ Weld County School District RE -8, referral dated June 24, 2025 ➢ Central Weld County Water District, referral dated July 17, 2025 ➢ Colorado Department of Transportation, referral dated July 3, 2025 ➢ Weld County Oil and Gas Energy Department, referral dated June 25, 2025 ➢ State of Colorado, Division of Water Resources, referral dated July 14, 2025 The Department of Planning Services' staff has not received responses from the following agencies: ➢ Adams County ➢ City of Thornton ➢ Broomfield County ➢ Colorado Historical Society ➢ Colorado Parks and Wildlife ➢ Brighton Fire Rescue District ➢ West Adams Conservation District ➢ Mountain View Water Users Association COZ25-0006 I Affordable Owner Page 1 of 7 CASE SUMMARY: The applicant is requesting a Change of Zone from A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District. The configuration of the thirty (30) -acre parcel does not have frontage on to a public right-of-way which is a requirement for rezonings, so the applicant has applied for a Lot Line Adjustment (LLA25-0013) to add approximately two and one -quarter (2.25) -acre flagpole to the thirty (30) - acre parcel to provide an abutment to County Road 11. There is an existing RV Storage facility on the thirty (30) acre parcel that has been on site since 1983. USR-299 (SUP -299) was approved by the Board of County Commissioners (BOCC) on June 2, 1976 (recorded June 10, 1976, reception number 1690823) fora dog kennel (with an unknown number of dogs). This USR-299 was vacated by the Board of County Commissioners on August 23, 2023. USR-588 was approved by the BOCC on December 7, 1983 (recorded January 5, 1984, reception number 1952121) for storage of repossessed mobile homes which replaced USR-299. In a letter dated June 21, 1984, repossessed RVs were added to USR-588 without a formal amendment. An amendment to USR-588 was approved by the BOCC on May 4, 1988 (recorded June 1, 1988, reception number 2143101) which now included the storage of two hundred (200) tractor trailers, recreational vehicles, and/or mobile homes, as well as a second -single family -dwelling. The USR was amended in 2014 under case number MUSR14- 0021 to expand the number of stored RVs to 1,000. The MUSR14-0021 staff report was issued on December 18, 2014, and the MUSR14-0021 map was recorded on April 27, 2016, under reception number 4198944. Per the 2014 amendment water to the two (2) residences was provided by Mountain View Water Users Association. During the review of this rezoning Mountain View and Central Weld County Water District (CWCWD) were both notified, Mountain View did not respond and CWCWD responded with no concerns. The septic permit SP -1400200 was issued on June 26, 2014. The applicant has not indicated the use of the site but since it is now a subsidiary of OutRig (goHomePort) it will more than likely remain, at least partially, as an outdoor RV storage facility. Any new business will require a Site Plan Review (SPR), a Use by Special Review Permit (USR), or a Zoning Permit. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. — That the proposal is consistent with Chapter 22 [Comprehensive Plan] of the Weld County Code. Section 22-2-30.8 states: "Locate urban development in urban areas." The applicant is requesting to rezone about thirty-two and one -quarter (32.25) acres from A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District. The parcel currently lacks public right-of-way frontage, however, the applicant has applied for a Lot Line Adjustment (LLA25-0013) to add approximately two and one -quarter (2.25) -acre flagpole to the thirty (30) - acre parcel to provide an abutment to County Road 11. This Lot Line Adjustment will be recorded prior to the Board of County Commissioners hearing. The site is located in the Urban Area according to the Weld County Comprehensive Plan. Section 22-2-30. 8.1 states: "Encourage annexation of urban -scale development. Zone changes and subdivisions within one -quarter mile of municipal limits are strongly discouraged. Property owners who want to rezone or subdivide their property are encouraged to contact the municipality about annexation." COZ25-0006 I Affordable Owner Page 2 of 7 This Change of Zone is consistent with the Section 22-2-30.B.1. as the site is not within one - quarter (1/4) mile of a municipality. Northglenn is one -quarter (1/4) mile to the south and Dacono is about one (1) mile to the northeast. Section 22-2-30. 8.2 states: "Urban -scale development shall only be placed where urban services, including public water, are available." There is an existing water tap from the Central Weld County Water District (CWCWD) and possibly from Mountain View Water Users Association although no referral response was received. There is a septic permit SP -1400200 on the site. Section 22-2-40.A. states: "Support compatible economic development opportunities." This site is partially located in a Weld County Opportunity Zone. The Opportunity Zone is due to the Regional Transportation District (RTD) rail line that is just east of the subject site. These RTD track are still in place, however, it does not appear to have had any rail traffic for many years. The subject site does not benefit from this rail line. Section 22-2-30.C. states: "Harmonize development with surrounding land uses." The properties surrounding the site are zoned agricultural and the land uses include commercial, industrial, and agricultural. The gravel mining and a batch plant to the north is an industrial land use and the compressor station to the south is a commercial land use. The property west of and adjacent to the west is agriculture. The east boundary includes vacant land and the abandoned RTD rail corridor. The site has been utilized as an RV storage facility since 1983 with no concerns from the surrounding property owners noted. B. 23-2-30.A.2. — The uses which would be allowed on the subject property by granting the Change of Zone will be compatible with the surrounding land uses. The adjacent surrounding lands are zoned A (Agricultural), and the land uses include commercial, industrial, agricultural and rural residential. USR(SUP)-223 for a compressor station is directly south of the site and USR-1341 for gravel mining and a batch plant is located directly north. The land use to the west is agricultural and to the east, east of the railroad track, is the closest residence, just about one-third (1/3) of a mile east of the site. There are fifteen (15) USRs within one (1) mile of the site. USR16-0026 for a commercial junkyard and salvage yard, USR-1737 for commercial vehicle storage and repair, Amended AMUSR-941 for a compressor station, USR(SUP)-223 for a compressor station, USR-998 for electrical power lines 230 kV and USR-1392 for electrical power lines 115 kV, USR-1077 for a twenty-four (24) -inch natural gas pipeline, USR-1341 for a gravel mining and a batch plant, USR16-0041 for a mineral resource development facility, 1 MUSR20-18-0061 for an oil and gas support service facility, USR-1702 for a public utility facility, USR-733 for four (4) radio towers each three hundred twenty-four (324) -feet in height, USR-971 for manufacturing of stairs, 1 MUSR19-04-1445 for a construction, storage and fabrication of materials, 2MUSR17-13-0010 for an RV, boat, commercial vehicles storage facility, USR16-0002 for storage of roofing materials, USR-1669 for truck parking, USR-117 for a turkey farm 3,000 turkeys (no longer operating), USR16-0035 for a vehicle parking and storage. On June 24, 2025, the Department of Planning Services sent notice to five (5) surrounding property owners within 500 -feet of the subject parcel. No correspondence was received. The site is not located within a Coordinated Planning Agreement (CPA) boundary of any municipality. The site is located within the three (3) mile referral area for the City of Northglenn, the City of Dacono, Town of Erie, City of Thornton, and the City of Fort Lupton, as well as Broomfield County and Adams County. The referral comments received from the Town of Erie, Cities of Dacono and Northglenn dated June 30, 2025, July 2, 2025 and June 25, 2025 respectively, COZ25-0006 I Affordable Owner Page 3 of 7 stated no concerns. Adams County and the City of Thornton did not submit referral agency comments. The subject property is located within the City of Northglenn's future land use map and growth management area and is designated as Development Corridor. Development Corridor, per the City's comprehensive plan, is a land designation that is defined as, "An area agreed upon to be developed at a residential density of 1 dwelling unit per acre in the Weld Co. portion and a maximum of 6 dwelling units per acre in the Adams Co. portion." The current use was established prior to the adoption of the City's Comprehensive Plan. The site is in a Weld County Opportunity Zone which is a preferred site for rezoning to commercial and industrial. Any future or expanded commercial/industrial uses will have to be approved through a Site Plan Review, Use by Special Review, or a Zoning Permit process. All of these processes are required to notify the referral agencies and, with the Use by Special Review and Zoning Permit processes, also sent to the surrounding property owners for comment. The Conditions of Approval and Development Standards applied to both this Change of Zone and any future Site Plan Review, Use by Special Review, or a Zoning Permit will adequately mitigate potential impacts. C. 23-2-30.A.3. — That adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. There is an existing water tap from the Central Weld County Water District (CWCWD) and possibly from Mountain View Water Users Association although no referral response was received. There is a septic permit SP -1400200 on the site. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. Per Section 23-2-30.A.4 a Change of Zone to a commercial or industrial zone district requires an abutment to a paved road. The site abuts County Road 11 which is a paved road. This portion of County Road 11 is under the jurisdiction of the City and County of Broomfield. The municipality has jurisdiction over access to the road. E. Section 23-2-30.A.5. — In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. The proposed Change of Zone (COZ) site is not located within any overlay district officially adopted by the County, including A -P (Airport) Overlay District, 1-25 Overlay District, Geologic Hazard Overlay District, MS4 - Municipal Separate Storm Sewer System area, Special Flood Hazard Area, Historic Townsites Overlay District, or Agricultural Heritage Overlay District. 2) Section 23-2-30.A.5.b. - That the proposed rezoning will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. The Geologic Hazards and Mineral Resources Report from Earth Engineering Consultants, LLC, dated April 24, 2025, submitted in the application materials, state there are no significant resources of clean and sound course aggregate exist below ground surface and no economically recoverable proppant sand resources were indicated. The site is located COZ25-0006 I Affordable Owner Page 4 of 7 within an identified oil and gas field, however, existing oil/gas wells are not currently located on the subject property. The EEC report states that oil/gas resources could exist below the site; however, evaluation by others would be needed to explore the potential. The site is located in the Denver Coal Region and a review of available maps show no coal mines were on or in the vicinity of the project site. Geotechnical subsurface explorations are recommended to evaluate the subsurface conditions and provide site specific recommendations for any future site improvements. 3) Section 23-2-30.A.5.c. - If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations can be overcome and that the limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to the development of the property. The Natural Resources Conservation Services (NRCS) Soil Survey indicates that 50% of the site consists of low -slope (1-3%) Nunn loam soils, 12% low -slope (1-3%) Weld loam, and 38% moderate -slope (3-5%) Wiley -Colby complex soils. The Wiley -Colby complex soils are classified as "Farmland of Statewide Importance", and the Nunn and Weld Loam are classified as "Prime Farmland if irrigated". The results of this zone change will remove about eleven (11) acres of Farmland of Statewide Importance from production; however, the site has not been utilized for agriculture uses since about 1983. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. THE CHANGE OF ZONE FROM THE A (AGRICULTURAL) ZONE DISTRICT TO THE 1-2 (MEDIUM INDUSTRIAL) ZONE DISTRICT IS CONDITIONAL UPON THE FOLLOWING: 1. The Change of Zone plat shall be amended to delineate the following: A. All sheets of the plat shall be labeled COZ25-0006. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.D. of the Weld County Code. (Department of Planning Services) C. All recorded easements and rights -of -way shall be delineated on the plat by book and page number or reception number. (Department of Planning Services) D. This portion of County Road 11 is under the jurisdiction of the City and County of Broomfield. Please contact the City/County to verify the right-of-way. Show and label the right-of-way. Show the approved access on the plat and label with the approved access permit number, if applicable. Include in the label all applicable access types (Agricultural, Commercial, Industrial, and/or Oil and Gas). (Development Review) E. Show and label (including the reception number) any existing access and/or utility easement within the limits of the subject parcel. (Development Review) F. The following notes shall be delineated on the Change of Zone plat: 1) Change of Zone, COZ25-0006, allows for 1-2 (Medium Industrial) Zone District uses which shall comply with the requirements set forth in Chapter 23, Article III, Division 4 of the Weld County Code. (Department of Planning Services) 2) Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) 3) The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) COZ25-0006 I Affordable Owner Page 5 of 7 4) Water service may be obtained from Central Weld County Water District. (Department of Planning Services) 5) The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by an on -site wastewater treatment system (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Planning Services) 6) Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Planning Services) 7) The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 8) The access to the subject parcel shall be maintained to mitigate any impacts to County Road 11 including damages and/or offsite tracking. (Development Review) 9) The historical flow patterns and runoff amounts will be maintained on the lots created with this lot line adjustment. (Development Review) 10) Building permits may be required, for any new construction, set up of manufactured structures, or change of use of existing buildings per Section 29-3-10 of the Weld County Code. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2018 International Building Codes, 2018 International Energy Code, 2020 National Electrical Code, and Chapter 29 of the Weld County Code. A Building Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A Geotechnical Engineering Report, performed by a Colorado registered engineer, shall be required or an Open Hole Inspection. A building permit must be issued prior to the start of construction. (Department of Building Inspection) 11) Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County -Wide Road Fee Impact Program and the County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) 12) Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 2. Upon completion of Conditions of Approval 1 and 2 above, the applicant shall submit one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-50.D. of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one -hundred -twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 3. If a plat has not been recorded within one hundred twenty (120) days of the date of the approval of the Change of Zone (COZ), or within a date specified by the Board of County Commissioners, the Board may require the landowner to appear before it and present evidence substantiating that the COZ has COZ25-0006 I Affordable Owner Page 6 of 7 not been abandoned and that the applicant possesses the willingness and ability to record the plat. The Board of County Commissioners may extend the date for recording the plat. If the Board determines that conditions supporting the original approval of the COZ cannot be met, the Board may, after a public hearing, revoke the COZ. 4. In accordance with Appendix 5-J of the Weld County Code, should the Change of Zone plat not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional 3 -month period. 5. Any approved amendments to the Official Zoning Map shall be effective immediately upon approval by the Board of County Commissioners unless otherwise specified by the approving resolution of the Board of County Commissioners. However, no building permit shall be issued, and no use shall commence on the property until the plat is recorded. COZ25-0006 I Affordable Owner Page 7 of 7 August 11, 2025 DEPARTMENT OF PLANNING SERVICES 1402 North 17th Ave Greeley, CO 80631 Website: www.weld.gov Email: daungst@weld.gov Phone: (970) 400-3524 Fax: (970) 304-6498 Tez Hawkins 112 N. RUBEY DRIVE, #210 Golden, CO 80403 Subject: COZ25-0006 - Change of Zone from the A (Agricultural) Zone District to the 1-2 (Medium Industrial) Zone District On parcel(s) of land described as: Lot B of LLA25-0013; being part of the SW1/4 of Section 25, Township 1 North, Range 68 West of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on September 2, 2025 at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on October 01, 2025 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://aca- prod.accela.com/WELD/ Respectfully, Diana Aungst Planner Hello