Loading...
HomeMy WebLinkAbout20253124lif __EL ,..._...... COUNTY, CO Planner: Case Number: Applicant: Representative: Request: Legal Description: Location: Acres: LAND USE APPLICATION SUMMARY SHEET Angela Snyder COZ25-0010 Hollingshead Materials LLC c/o Jeff Hollingshead 1000 Hollingshead Circle, Murfreesboro, TN 37129 Hearing Date: November 4, 2025 PENTA Engineering Corporation c/o Christian Benavides 10123 Corporate Square Drive, St. Louis, MO 63132 Change of Zone from the A (Agricultural) Zone District to the C-3 (Business Commercial) Zone District Lot A of Recorded Exemption RE -4866, being a part of the NW4 of Section 18, Township 5 North, Range 67 West of the 6th Principal Meridian, Weld County, Colorado. East of and adjacent to Colorado Boulevard (County Road 13) and approximately 0.4 miles south of U.S. Highway 34 +/- 2.02 acres Parcel #: 0957-18-2-00-054 The criteria for review of this Change of Zone are listed in Section 23-2-30 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: ➢ Windsor -Severance Fire Rescue, referral dated August 19, 2025 ➢ Weld County Department of Planning Services — Development Review, referral dated September 16, 2025 The Department of Planning Services' staff has received referral responses without comments from the following agencies: ➢ Weld County Sheriff's Office, referral dated August 21, 2025 ➢ Larimer County, referral dated August 26, 2025 ➢ Colorado Department of Transportation, referral dated August 26, 2025 ➢ Little Thompson Water District, referral dated August 28, 2025 ➢ Town of Windsor, referral dated September 16, 2025 The Department of Planning Services' staff has not received responses from the following agencies: ➢ Colorado Division of Wildlife ➢ Colorado Division of Water Resources ➢ Colorado Geological Survey ➢ Town of Johnstown ➢ Union Pacific Railroad ➢ Weld County Oil and Gas Energy Department COZ25-0010 I Hollingshead Materials Page 1 of 6 ➢ Weld County School District RE -5J Narrative The property owner has requested a Change of Zone on a property zoned A (Agricultural) to C-3 (Business Commercial). Potential uses for C-3 zoned properties can be found in Section 23-3-230 of the Weld County Code. The property currently contains a residence that has been converted into an office and a 2,500 square foot warehouse. The land around the structures has been used for agricultural purposes, such as crop production, grazing, or farming together with the adjacent property. The applicant suggests that commercial use of the property is more economically viable. The applicant is requesting the Change of Zone to allow for the establishment of a truck maintenance facility for ready mix vehicles. The business can serve nearby concrete and asphalt batch plants. Note, a Change of Zone is not approval of a particular use but opens the property to the potential for any use allowed in the new zone district. If approved, commercial use of the property will require a Site Plan Review (SPR), a Use by Special Review Permit (USR), or applicable Zoning Permit. Windsor Severance Fire Rescue, in the August 19, 2025, referral, did not express any concern with the rezoning request. However, the applicant was made aware of site requirements that will be addressed through the subsequent land use review process: USR, SPR, or Zoning Permit. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. — That the proposal is consistent with Chapter 22 [Comprehensive Plan] of the Weld County Code. The following goals and objectives from the Weld County Comprehensive Plan are relevant to this request: Section 22-2-30.B. Locate urban development in urban areas. According to the Weld County Comprehensive Plan Map, the property is designated for Urban development and is within a Weld County Opportunity Zone, This indicates that the property may be an appropriate location for commercial or industrial development, based on site -specific factors. The area is currently urbanizing and is an appropriate location to consider commercial development. The property is located approximately 0.4 miles from Johnstown and 0.5 miles from Windsor. The Notice of Inquiry response dated March 20, 2025, indicated that the Town of Johnstown is not interested in annexing the property, but asked to be included as a referral agency regarding site development. The Johnstown Future Land Use Map identifies the property for "High Density / High Intensity" development. According to the Notice of Inquiry response from the Town of Windsor dated March 24, 2025, the property is outside of Windsor's Growth Management Area. Section 22-2-30.B.2. Urban -scale development shall only be placed where urban services, including public water, are available. Public water is provided to this property by Little Thompson Water District, which returned a referral, dated August 28, 2025, indicating no concerns with the rezoning. The property is currently served by an on -site wastewater treatment system (OWTS), permit #SP -1700026, COZ25-0010 I Hollingshead Materials Page 2 of 6 which is acceptable in the C-3 Zone District. Other urban utility services are available, such as electric, natural gas, high speed internet, and access to federal highways and rail. Section 22-2-30. B.1. Encourage annexation of urban -scale development. Zone changes and subdivisions within one -quarter mile of municipal limits are strongly discouraged. Property owners who want to rezone or subdivide their property are encouraged to contact the municipality about annexation. This Change of Zone is consistent with the Section 22-2-30.B.1. as the site is not within one - quarter (1/4) mile of a municipality. Windsor is more than one-half (0.5) mile to the north, north of U.S. Highway 34. Section 22-2-40.A. Support compatible economic development opportunities. This site is located in a Weld County Opportunity Zone. The site is within one (1) mile of U.S. Highway 34 and within one -quarter (0.25) mile of a rail -road track. Section 22-2-30.C. Harmonize development with surrounding land uses. 1. Transition between land use types and intensities with buffers. Uses that are incompatible with existing uses must be able to mitigate conflicts. The site is approximately one-half (0.5) mile from a residential subdivision, Indianhead. The applicant indicates a willingness to screen and landscape the property as necessary to create a buffer between the two (2) land uses. C-3 zoning further provides a buffer between industrial uses to the south along the Union Pacific and Great Western railroads and the U.S. Highway 34 gateway corridor to the north. Section 22-2-40. - Economic Development Goals and Objectives. A. Support compatible economic development opportunities. 1. Identify target areas where the County is able to encourage shovel -ready commercial and industrial development. The subject property is located adjacent to an arterial paved road, Colorado Boulevard (County Road 13), improved to withstand considerable commercial and industrial traffic. The site is located within a Weld County Opportunity Zone. The urbanization and increased population density in the area further support commercial zoning on the subject property. B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. Land uses immediately surrounding the property to the west, north, and east consist of oil and gas production facilities and agriculture uses. Land to the south is zoned industrial and consists of industrial uses including transloading, concrete and asphalt batching, a construction company, a mini -storage facility, and a pet crematorium. The Iron Horse Industrial Park in Johnstown, less than one-half (0.5) mile to the west, hosts several additional industrial and commercial users. On August 15, 2025, the Department of Planning Services sent notice via regular mail to three (3) surrounding property owners within five hundred (500) feet of the subject parcel, including those in both Larimer and Weld Counties. The Department of Planning Services received no responses from surrounding property owners. Any future or expanded commercial/industrial uses will have to be approved through a Site Plan Review, Use by Special Review, or a Zoning Permit process. All of these processes are required to notify the referral agencies and, with the Use by Special Review and Zoning Permit processes, also sent to the surrounding property owners for comment. The Conditions of Approval and Development Standards applied to both this Change of Zone and any future Site COZ25-0010 I Hollingshead Materials Page 3 of 6 Plan Review, Use by Special Review, or Zoning Permit will adequately address and mitigate potential impacts. C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. Public water is provided to this property by Little Thompson Water District, which returned a referral, dated August 28, 2025, indicating no concerns with the rezoning. The parcel is not currently served by a municipal sanitary sewer system. The property is currently served by a residential on -site wastewater treatment system (OWTS), permit #SP -1700026. If the system is intended to be used commercially, it will be reviewed through the land use permitting process. Sewage disposal may be provided by an OWTS designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of system construction, repair, replacement, or modification. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. Per Section 23-2-30.A.4, a Change of Zone to a commercial district requires that the property access on to an adequately improved road. The site directly abuts Colorado Boulevard, which is a paved public arterial road. The existing access, granted via the plat of Recorded Exemption RE -4866, recorded May 21, 2009, at Reception No. 3624449, is a thirty-foot (30') shared access easement located on the northern property line. The traffic produced by a new user may trigger improvements to the access but will be determined with review of a new land use permit. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. The site is not located within an overlay district officially adopted by the County, including A -P (Airport) Overlay District, Geologic Hazard Overlay District, Floodplain Management Overlay District, Historic Townsites Overlay District, 1-25 Overlay District, Agricultural Heritage Overlay District, or (MS4) Multiple Separate Storm Sewer System area. 2) Section 23-2-30.A.5.b. - That the proposed rezoning will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. The proposed rezoning will not interfere with the present or future extraction of a commercial mineral deposit. The report submitted with the applicant prepared by Earth Engineering Consultants, LLC, dated April 3, 2025, geologic hazards do not appear on the property, critical mineral resources are not inferred on the property, and coal resources do not appear as an economic resource. 3) Section 23-2-30.A.5.c. - If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations can be overcome and that the limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to the development of the property. COZ25-0010 I Hollingshead Materials Page 4 of 6 The Natural Resources Conservation Services (NRCS) Soil Survey indicates that site consists of Nunn clay loam and Wiley -Colby complex, both with one to three percent (1 - 3%) slopes. Both are rated as "somewhat limited" for small commercial buildings and basements due to shrink -swell ratings. However, the limitations are not moderate or severe and can be overcome with building design. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval of this Change of Zone from the A (Agricultural) Zone District to the C-3 (Business Commercial) Zone District is conditional upon the following: 1. The Change of Zone plat shall be amended to delineate the following: A. All pages of the plat shall be labeled COZ25-0010. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.C and D. of the Weld County Code. (Department of Planning Services) C. All recorded easements shall be shown and dimensioned on the Change of Zone plat. (Department of Planning Services) D. All approved accesses shall be delineated on the plat. (Department of Planning Services) E. County Road 13 is a paved road and is designated on the Weld County Functional Classification Map as an arterial road which requires 140 feet of right-of-way. The applicant shall delineate and label the existing right-of-way (along with its creating document), the future right-of-way, and the physical location of the road. All setbacks shall be measured from the future right-of-way line. This road is maintained by Weld County. (Development Review) F. The following notes shall be delineated on the Change of Zone plat: 1) The Change of Zone, COZ25-0010, allows for C-3 (Business Commercial) Zone District uses which shall comply with the requirements set forth in Chapter 23, Article III, Division 3 of the Weld County Code. (Department of Planning Services) 2) Any future structures on site must obtain the appropriate building permits. (Department of Planning Services) 3) The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) Water service may be obtained from Little Thompson Water District. (Department of Planning Services) 4) The parcel is not currently served by a municipal sanitary sewer system. Sewage disposal may be by an on -site wastewater treatment system (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Planning Services) 5) Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Planning Services) 6) The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) COZ25-0010 I Hollingshead Materials Page 5 of 6 7) The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. (Development Review) 8) There shall be no parking or staging of vehicles on public roads or within public rights -of -way. On -site parking shall be utilized. (Development Review) 9) The historical flow patterns and runoff amounts will be maintained on the site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to runoff rate and velocity increases, diversions, concentration and/or unplanned ponding of stormwater runoff. (Development Review) 10) Building permits may be required, for any new construction, set up of manufactured structures, or change of use of existing buildings per Section 29-3-10 of the Weld County Code. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2018 International Building Codes, 2018 International Energy Code, 2020 National Electrical Code, and Chapter 29 of the Weld County Code. A Building Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A Geotechnical Engineering Report, performed by a Colorado registered engineer, shall be required or an Open Hole Inspection. A building permit must be issued prior to the start of construction. (Department of Building Inspection) Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County - Wide Road Fee Impact Program and the County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) All buildings shall comply with the setback from oil and gas wells per Section 23-4-700, as amended. (Department of Planning Services) 2. Upon completion of Conditions of Approval 1. above, the applicant shall submit one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the plat the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-50.D. of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one -hundred -twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 3. If a plat has not been recorded within one hundred twenty (120) days of the date of the approval of the Change of Zone (COZ), or within a date specified by the Board of County Commissioners, the Board may require the landowner to appear before it and present evidence substantiating that the COZ has not been abandoned and that the applicant possesses the willingness and ability to record the plat. The Board of County Commissioners may extend the date for recording the plat. If the Board determines that conditions supporting the original approval of the COZ cannot be met, the Board may, after a public hearing, revoke the COZ. 4. In accordance with Appendix 5-J of the Weld County Code, should the plat not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional 3 -month period. 5. Any approved amendments to the Official Zoning Map shall be effective immediately upon approval by the Board of County Commissioners unless otherwise specified by the approving resolution of the Board of County Commissioners. However, no building permit shall be issued, and no use shall commence on the property until the plat is recorded and a land use permit perfected. COZ25-0010 I Hollingshead Materials Page 6 of 6 861/ October 10, 2025 COUNTY, CO Christian Benvides 10123 Corporate Square Dr. St Louis, CO 63132 DEPARTMENT OF PLANNING SERVICES 1402 North 17th Ave Greeley, CO 80631 Website: www.weld.gov Email: asnyder@weldgov.com Phone: (970) 400-3557 Fax: (970) 304-6498 Subject: COZ25-0010 - Change of Zone from the A (Agricultural) Commercial) Zone District. Zone District to the C-3 (Business On parcel(s) of land described as: Part of Lot A of Recorded Exemption RE -4866; being part of the NW1 /4 of Section 18, Township 5 North, Range 67 West of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on November 4, 2025 at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on November 19, 2025 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://aca- prod.accela.com/WELD/ Respectfully, :1 t ik Angela Snyder Planner Hello