Loading...
HomeMy WebLinkAbout20250812.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 49 Between County Roads 64 and 66 for Approximately Five (5) Days, for Culvert Replacement Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 49, between County Roads 64 and 66, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective March 31, 2025, for approximately five (5) days for a culvert replacement. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 49, between County Roads 64 and 66, be temporarily closed, with said closure being effective March 31, 2025, for approximately five (5) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc ; SO(as), D;S po�-}�j,�l GSP 03/27as 2025-0812 EG0024 Temporary Closure — County Road 49 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 24th day of March, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-0812 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 19, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 49 between WCR 66 and WCR 64 from 3/31/25 thru 4/4/25 for culvert replacement. See attached closure diagram. 2025-0812 3/zi- eciouze-I www.invarion.com W20 -1F W20 -1F 4 M i W20 -1F 4 1 rt 0 _ !AU aaaa tneunu it WCR 66 s w aa-ue- gw02 r ! - Is is Si a se - -i s is w •OB s s-rabse- f r - - -*-411-r • e.. .a_ .. r .i. W20 -1F 'W"cr-1 F— - — - W20-3 M4-9 ►-ate w• w 4It a -111.-111b-S. IS. sib a .o s DETOUR 4 �Er }V i 41.1Mill anoLao M4-9 WCR 64 ��.�y - s• din ma �-re.sh Alma ���F 4 i ��1JLaLL • r-1'x'7~LS.a Oh a JOeiter-F s a a iiaK a 0 m 0 M4-9 i PROJECT # AN -59/2025 ROAD CLOSURE DESCRIPTION WCR closed for culvert 49 3/31/2025 between replacement WCR thru 4/4/2025 66 and WCR 64 NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR WCR WCR 64 51 66 between between between WCR WCR WCR 49 64 51 and and and WCR WCR WCR 51 66 49 1 1 1 mile mile mile gravel paved gravel NOTES. ADT Culvert Culvert Culvert New Water of 24" to WCR replaced Replacement is CSPR be .5 used is: North 47/2024 is irrigation: for of dust WCR control 64 Old on 24" WCR Round 49 CMP Prepared 3/14/2025 by: Ryan Aragon Hello