Loading...
HomeMy WebLinkAbout20250558.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Rescheduled Temporary Closure of 78 Between County Roads 29 and 31 for Approximately Five (5) Days, for Culvert Replacement Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, on the 10th day of February, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board determined that conditions existed which made it necessary to temporarily close County Road 78, between County Roads 29 and 31, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective February 18, 2025, for approximately four (4) days, through February 21, 2025, for a culvert replacement, and Whereas, Department of Public Works staff informed the Board that inclement weather caused unanticipated delays and requested the Board reschedule the temporary closure, and Whereas, on the 26th day of February, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to reschedule said temporarily closure of County Road 78, between County Roads 29 and 31, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said rescheduled closure being effective March 3, 2025, for approximately five (5) days for a culvert replacement. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the temporary closure of County Road 78, between County Roads 29 and 31, be, and hereby is, rescheduled, with said rescheduled closure being effective March 3, 2025, for approximately five (5) days for a culvert replacement, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. c c : So (RS), I); 5 .*ctn, CSP os/oN/2S 2025-0558 EG0024 Temporary Closure — County Road 78 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 26th day of February, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro -Tern: Aye Jason S. Maxey: Aye Lynette Peppler: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-0558 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 24, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 78 between WCR 29 and WCR 31 from 3/3/2025 thru 3/7/25 for a culvert replacement. The dates originally approved by the board for this closure was 2/18/25 thru 2/21/25 but was postponed due to inclement weather. See attached closure diagram. 2025-0558 OO www.invarion.com W20 -1F y a a spa a -48-s-0-10- •'I M4-9 DETOUR M4-9 • CN CC 7r W20 -1F Kama Vitt R 94 �► per .+rte - a a a a aamt..- a an- a. e• a a a ear- a- a- al a s _a_a.- .- _ • .r r VICR 78 a a a ass_ a_ a. a as An -a- a a r a ea -a -a_ -a. a a is a -a -a .ar. a a a +- p e- •. r- -a M4-9 W20 -1F M4-1. i 0 cc DETOUR M4-9 W20 -1F PROJECT# AN -59/2025 ROAD CLOSURE DESCRIPTION WCR Closed for culvert 78 3/3/2025 between replacement thru WCR 3/7/2025 29 and WCR 31 NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR WCR WCR 29 80 31 between between between WCR WCR WCR 78 and 29 and 80 and WCR WCR WCR 80 31 78 1 1 1 mile mile mile paved gravel paved ES ADT Culvert New: Water Culvert of 18" to is WCR replaced RCPR be 50' used is: East 72/2024 is irrigation: for of dust WCR control 29 Old: on 18" WCR Round 78 CMP Prepared 1/29/2025 by: Ryan Reynolds Hello