Loading...
HomeMy WebLinkAbout20252875.tiff Notice � The Board of County Commissioners of Weld County, Colorado, on October 29, 2025, conditionally approved a Site Specific Development Plan and Use by Special Review Permit, USR25-0010,for the property and purpose described below. Conditional approval of this plan creates a vested property right, pursuant to Article 68 of Title 24, C.R.S., and Article VII, Chapter 23 of the Weld County Code, for a period of three years, beginning on the date of publication of this Notice. The complete case file may be examined in the office of the Clerk to the Board of County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. The Clerk to the Board's Office can be contacted at (970) 400-4226 or egesick@weld.gov. Docket#: 2025-63 Applicant: Guttersen Ranches, LLC P.O. Box 337090 Greeley, Colorado 80633 c/o DCP Operating Company LP 3026 4th Avenue Greeley, Colorado 80631 Legal Description: A portion of land located in the SW1/4 of Section 28, Township 3 North, Range 63 West of the 6th P.M., Weld County, Colorado Type and Intensity of Approved Use: An Oil and Gas Support and Service facility (natural gas compressor station) outside of subdivisions and historic townsites in the A (Agricultural) Zone District Size of Parcel: 33 acres, more or less Failure to abide by the terms and conditions of approval will result in a forFeiture of the vested property right. Board of County Commissioners Weld County, Colorado Dated: November 12, 2025 Published: November 14, 2025, in the Greeley Tribune NoNce rado.TaiO�Uobe 29 202�c�onditbriallyapp w�P�mit,505�5�- Development Plan and Use 6y Speclal R 0010,for the proppe�rty and urpose descnbede rbteylow.Copnditional Prairie Mountain Media LLC ta ArtiGe 68 of Title 24rC�.RS.,and5A�rticle VII,�apt�er 23 ot tt�ie � Weld CouMY Code,for a Derlod of three years,beginning on the date of publicatlon of this NoUce rhe compIete case flle maY be examined in the office of the PUBLISHER'S AFFIDAVIT Glerk M the Board of CounXy Commissiorrers,Weld C6un Ad- The�Cle li�to6 e�dBouds Office caotbe contacted�at C970��= County of Weld ans or egesic��?weld,�ov. State of Colorado ADpodpYcet#:2025-63 Gukers�en Ranches,LLC P.O.Box 337090 Greeley,Coloredo 80633 3026 4th Avenuteng CAmpany,LP GreeleY.Col�orado 806p3o1 The undersigned, As�ent .be(ng flrst duly sworn b'��28,7�awn�shi�p 3 Nortl�Range 63 Wesidof t ee6th p A4A.�,We�ld under oath,states and affirms as follows: County,Colorado Tsypei�and Grt�enys�ityw A�proved Upse:an OII and Gas SuSport and 1, He/she is the legal Advertising Reviewer of �i�ions and historie townites fn�t�he A(agi3cukura)Zone Dis- Preirie Mountain Media LLC,publisher of the Size of vucel:33 acres,more or less Greeley Tribune. Failure to abide by tlie terms and conditions of approval wfll Z, The Greeley Tribune is a newapaper resuk in a forfeiwre of the vested property right Board ot County commissioners of general circulation that has been published weld County,Colarada oated:November 1z,zoz5 continuousiy and without interruption for at least Publh6ed:November 14,2025.In the Greeley Tribune-21435/3 flftytwo weeks In Weld County and meets the legai requisites for a legal newspaper under Colo.Rev.Stat.24-TO-103. 3. The notice that fs attached hereto is a true copy, published in the Greeley Trlbune. in Weld County on the following date(s): Nov 14.2025 Signature Subscribed and swo to me before me this �day of �� Notary Public SHAYLA NAJERA NOTARY PUBLIC STATE OF COLORADO csE^�> NOTARY ID 20174031965 MY COMMISSION EXPIRES JULY 39,2029 Account: 7099690 Ad Number: 2743573 Fee: E18.50 �.a Notice Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be held before the Weld County Planning Commission and the Board of County Commissioners in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631, at the times specified below. The complete case file may be examined by calling the Department of Planning Services at (970) 400-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. Email messages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of your Email correspondence into the case file prior to the Planning Commission hearing, please call the Department of Planning Services to obtain the appropriate contact information. For inclusion of any correspondence prior to the Board of Commissioners hearing, email egesick@weld.gov. If a court reporter is desired for either hearing, please advise the Department of Planning Services or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the requesting party. In accordance with the Americans with Disabilities Act, if special accommodations are required in order for you to participate in this hearing, please contact the Department of Planning Services at (970) 400-6100, or the Clerk to the Board's Office at (970) 400- 4225, prior to the day of the hearing. All cases scheduled before the Planning Commission or Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing continuance information. The application may be updated at any time at the request of the applicant, or in response to public input, referral responses, or staff recommendations. During the public hearing process, the Planning Commission and Board of County Commissioners reserve the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number: 2025-63 Planning Commissioners Date: October 7, 2025 Time: 1:30 p.m. Board of Commissioners Date: October 29, 2025 Time: 10:00 a.m. Case Number: USR25-0010 Applicant: Gutterson Ranches, LLC, c/o DCP Operating Company, LP Planner: Chris Gathman Request: Use by Special Review Permit for an Oil and Gas Support and Service facility (natural gas compressor station), outside of subdivisions and historic townsites in the A (Agricultural) Zone District. Legal Description: SW1/4 of Section 28, Township 3 North, Range 63 West of the 6th P.M., Weld County, Colorado. Location: East of and adjacent to County Road 65 section line; approximately 8,524 feet north of Interstate 76 (1-76). (See Legal Description for precise location) Size: 33 acres, more or less Dated: September 17, 2025 Published: September 19, 2025, in the Greeley Tribune Notice Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be held before the Weld County Planning Commission and the Board of County Commissioners in the Hearing Room, Weld County Administra- tion Building, 1150 O Street, Greeley, Colorado 80631, at the times specified below. The complete case file may be examined by calling the De- partment of Planning Services at (970) 400-6100 to make ar- rangements with the case planner, or at the office of the Clerk to the Board of County Commissioners, Weld County Administra- tion Building, 1150 O Street, Greeley, Colorado 80631. Email mes- sages sent to an Individual Commissioner may not be included in the case file. To ensure Inclusion of your Email correspond- ence into the case file prior to the Planning Commission hearing, please call the Department of Planning Services to obtain the appropriate contact information. For inclusion of any corre- spondence prior to the Board of Commissioners hearing, email egesick@weld.gov. If a court reporter is desired for either hearing, please ad- vise the Department of Planning Services or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the re- questing party.In accordance with the Americans with Disabili- ties Act, if special accommodations dgare required In order for you tof PlanninggiSerrvices ate in this t (970)400-6100. or te he Clerct k Department the Board Board's Office at (970) 400-4225, prior to the day of the hearing. All cases scheduled before the Planning Commission or Board of County Commissioners are subject to continuance, due to lack of quo- rum or otherwise. Contact the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing continuance information. The application may be updat- ed at any time at the request of the applicant, or in response to public input, referral responses, or staff recommendations. Dur- ing the public hearing process, the Planning Commission and Board of County Commissioners reserve the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number. 2025-63 Planning Commissioners Date: October 7, 2025 Time: 1:30 p.m. Board of Commissioners Date: October 29, 2025 lime: 10:00 a.m. Case Number: USR25-0010 Applicant: Gutterson Ranches, LLC, c/o DCP Operating Compa- ny, LP Planner: Chris Gathman Request: Use by Special Review Permit for an Oil and Gas Sup- port and Service facility (natural gas compressor station), out- side of subdivisions and historic townsites in the A (Agricultural) Zone District. Legal Description: SW1/4 of Section 28, Township 3 North, Range 631 West of the 6th P.M., Weld County, Colorado. Location: East of and adjacent to County Road 65 section line; approximately 8,524 feet north of Interstate 76 (I.76). (See Legal Description for precise location) Size: 33 acres, more or less Dated: September 17, 2025 Published: September 19, 2025, in the Greeley Tribune - 2134455 Prairie Mountain Media, LLC PUBLISHER'S AFFIDAVIT County of Weld State of Colorado The undersigned, Agent , being first duly sworn under oath, states and affirms as follows: 1. He/she is the legal Advertising Reviewer of Prairie Mountain Media LLC, publisher of the Gree/ey Tribune. 2. The Greeley Tribune is a newspaper of general circulation that has been published continuously and without interruption for at least fifty-two weeks in Weld County and meets the legal requisites for a legal newspaper under Colo. Rev. Stat. 24.70-103. 3. The notice that is attached hereto is a true copy, published In the Greeley Tribune in Weld County on the following date(s): Sep 19, 2025 Signature J S scribed and sworn to a befor me this day o ,05 Notary Public (SEAL) SHAYLA NAJERA NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20174031965 MY COMMISSION EXPIRES JULY 31, 2029 Account: Ad Number: Fee: 1099981 2134455 $30.00 ie thc Hearing Notice Iii4eVitowntsi , it c:strci Mkr cn u d ng . 11 SO O Si. Greeley, CO 806; rig Ariti CASE NUMBER: ()Sea 2-5- Sava aric' _ n �3tCYW� 1-417p� 110- 0.#. •�.�..'. -..q is r -,r— It,2 r 4- 1 ` i-- C. S� T�(�ir��:' to, Inpl#. TN tresitit.ii.i.-. {iflifi.� •'L j r Ara. ilev►41 girt . .2!?'A;r• r • 9 r;. 1t.Y * S;lO. Itk i� I PLANNING COMMISSION & BOARD OF COUNTY COMMISSIONERS SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS September 27, 2025. THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT- OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POSTA SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, CHRIS GATHMAN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST 10 DAYS BEFORE THE PLANNING COMMISSION AND BOARD OF COMMISSIONERS HEARINGS FOR USR25-0010 IN THE AGRICULTURAL ZONE DISTRICT. Chris Gathman Name of Person Posting Sign r - Signature of Person Posting Sign STATE OF COLORADO ) ss. COUNTY OF WELD The foregoing instrument was subscribed and sworn to me this 11t. day of au- , 2024. WITNESS my hand and official seal. \ A el Notary Public My Commission Expires: IST%NE RANSLEM • �� NOTARY PUBLIC STATE OF COLORADo NOTARY ID 20124034827 MY COMMISSION EXPIRES JUNE 05, Hello