HomeMy WebLinkAbout20253035.tiffa
COLORADO
Department of Public
Health 6 Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
November 3, 2025
To whom it may concern:
RECEIVED
NOV L ;. 2025
WELD COUNTY
COMMISSIONERS
On November 3, 2025, the Air Pollution Control Division will begin a 30 -day public notice
period for DCP Operating Company, LP - SLW Compressor Station. A copy of this public
notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public notice period. Please reference the public notice for instructions on
submitting comments.
Enclosure
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692.2000 CDPHE Website
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
C c-% PL lDE\trcvV P NLMsDC,L'6�1
pwCC.k\c���D1��1�Nl56D)
\\ \ o31a5
2025-3035
Air Pollution Control Division
Notice of A Proposed Title V Operating Permit Warranting Public
Comment
Website Title: DCP Operating Company, LP - SLW Compressor Station - Weld County
Notice Period Begins: November 3, 2025
Notice Period Ends: December 3, 2025
NOTICE is hereby given that an Operating Permit application has been submitted to the Colorado
Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado 80246-1530, for the
following source of air pollution:
Applicant: DCP Operating Company, LP
3026 4th Avenue
Greeley, CO 80644
Facility: SLW Compressor Station
DCP Operating Company, LP has applied for an Operating Permit for the SLW Compressor Station in
Weld County, CO. A copy of the application, including supplemental information, the Division's
analysis, and a draft of Operating Permit 20OPWE425 are available on the Division's website. The
Division has made a preliminary determination of approval of the application. Based on the
information submitted by the applicant, the Division has prepared the draft operating permit for
approval. Any interested person may contact the division at cdphe_apcd_title_v@state.co.us to
obtain additional information. Any interested person may submit written comments to the Division
concerning 1) the sufficiency of the preliminary analysis, 2) whether the permit application should
be approved or denied, 3) the ability of the proposed activity to comply with applicable
requirements, 4) the air quality impacts of, alternatives to, and control technology required on the
source or modification, and 5) any other appropriate air quality considerations. Any interested
person may submit a written request to the Division for a public comment hearing before the
Colorado Air Quality Control Commission (Commission) to receive comments regarding the concerns
listed above as well as the sufficiency of the preliminary analysis and whether the Division should
2.02
1I Mit
COLORADO
Department of Public
Health ft Envtronr 1
approve or deny the permit application. If requested, the hearing will be held before the
Commission within 60 days of its receipt of the request for a hearing unless a longer time period is
agreed upon by the Division and the applicant. The hearing request must: 1) identify the individual
or group requesting the hearing, 2) state his or her address and phone number, and 3) state the
reason(s) for the request, the manner in which the person is affected by the proceedings, and an
explanation of why the person's interests are not already adequately represented. The Division will
receive and consider the written public comments and requests for any hearing for thirty calendar
days after the date of this Notice.
Comments may be submitted using the following options:
• Use this web form. This page also includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments®state.co.us
• Send comments to our mailing address:
Title V Operating Permits Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the Division will be uploaded to an online document repository and
will be accessible to the public. Your comments and the division's responses are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comments.
Hearing requests may be submitted to the email address or the mailing address noted above.
Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR §
70.8(a)(1) and 40 C.F.R. § 70.8(a)(1((ii)).
45 -Day EPA Review Period Start Date: November 4, 2025
45 -Day EPA Review Period End Date: December 19, 2025
2.02 2 I
COLOR ADO
Department o! Publie
Health 6 Environment
Hello