Loading...
HomeMy WebLinkAbout20251034.tiffINVENTORY OF ITEMS FOR CONSIDERATION Applicant: Wells Ranch Case Number: USR25-0001 Submitted or Prepared Prior to Hearing At Hearing 1 Applicant Presentation X I hereby certify that the one item identified herein was submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners' hearing. Or Maxwell Nader, Planner k� Cr OLORADO SAND COMPANY OVER'il WELD COUNTY' APRIL 2025 rr COLORADO SAND COMPANY & PARENT COMPANY PRIVATELY OWNED tic OPERATED WITH 45+ YEARS SAND, MINING He AGGREGATES EXPERTISE 7Capital Sand Inc. was founded in 1973. ';'A trusted sand mining company in the Midwest. 7/Committed to the highest level of production quality, customer service & safety standards. 71 of 50 operating companies with 3,000 employees vertically integrated in sand, mining, limestone quarries, ready -mix concrete, asphalt & logistics. 2 CSC EXISTING FRAC SAND OPERATIONS Colorado Sand 7 3.2M tons per year production 7 Located on 1-76, Keenesburg CO 7 4 truck loadouts, 70k tons dry storage Permian 7 3M tons per year production Located on 1-20 service road, Monahans, TX, with quick access to Midland and Delaware basins 6 truck loadouts, 50k tons dry storage Marcellus — Haynesville - Eagle Ford 3.M tons per year production 7 strategic barge -fed terminals >100M tons quantifiable reserves Northern White, St. Peters Formation CSC - WELL LOCATED WITHIN COLORADO CUSTOMER ACREAGE 7Prior to 2023, all frac sand used in CO was shipped >1,000 miles via train 7/CSC's 2 sites cover the DJ frac sand market and help to reduce the distance to the well for the operators 7Keenesburg mine is approximately 3 miles north of town of Keenesburg, CO, offI-76 Proposed Kersey mine is located off SH-392 on the Wells Ranch 'Airy O C CIE csal le Service Area aiN Laramie Banner i Larimer Boulder. 144 Broomfield - - J -rrd agar ti;ek Jefferson rci'VeII Perriits YT D 2024:4.1 i a� *AIN Service A oLM, RADO 0i1/44110 .ice, 4 44 we. p, w Kersey Keenesburg k Adams Derive r 4 � Arapahoe n Lig an i et k 1' Washington Dame El Faso tee Adive Rig CSC: Mine �. Interstate Density 4 KEENESBURG PLANT COMMISSIONED IN 2023 7 Site located -3m north of Keenesburg, CO KEENESBURG PLANT WAS SUCCESSFUL Keenesburg Plant was commissioned in 2023 with 3 additional build phases 7Greatly reduced the train traffic into Weld County from out of state sand companies 7 All operators who have pumped the sand report that the sand is performing on par with traditional northern white sand Keenesburg plant has been a success across all metrics KERSEY SITE LAYOUT -4 swineu --- S04 T5N RON - R63W I : 'I r. -�- 1 I I 0 1 I I o r I I I 1. A (_. tr - . _ - - - 1 i _ t 535 T6N R&M t 1 r I 6 I A 0 r I 1 1 1 1 c I a r a 636 T6N R63W _• i .. u A ; , 1 t r r , 40 S34 T6N R63W SO2 T5N R6DA1 I1 l i SO3 T91 R63W d 4i 11 - S01 T5N ROW - S09 T5N R63W S1►5 T5N R63'11"r' 3 1 a : I a 1 a 1 r m 1 i 11 S10 T5N R63W u n �` S15 T5N R63W _ ,ti r j S11 T5N R63W -` STOCK POND Si4T5N R63W a Ia II' A 1 a n .a ,1 at 1 1 a i 1 1 a 1 a ! I S12 T5N R63W . .1 -14 —. S13 T5N R63 „I : ./ 4 1 - itis KERSEY PLANT LAYOUT - DETAIL KERSEY PLANT BENEFITS TO WELD COUNTY AND INDUSTRY 7 Create an additional —120 jobs in Weld County, for >15 yrs, in a large, multi -state diversified company offering upward mobility :' Reduce cost of sand for DJ operators by >30`)/0, and increase reliability of supply • Sand not sourced in Colorado by DJ operators is sourced from >1,000 mi, via rail • Sand is the third largest cost drivers in a frac • 70k additional tons of onsite finished product storage 7 Position DJ operators to better compete with peers • And increase ROI of DJ assets for companies who can choose where in their portfolio to spend capital COLORADO SAND COMPANY & PARENT COMPANY PRIVATELY OWNED & OPERATED WITH 45+ YEARS SAND, MINING & AGGREGATES EXPERTISE irCapital Sand Inc. was founded in 1973. TA trusted sand mining company in the Midwest. 7Committed to the highest level of production quality, customer service & safety standards. 1-71 of 50 operating companies with 3,000 employees vertically integrated in sand, mining, limestone quarries, ready -mix concrete, asphalt & logistics. Hello