HomeMy WebLinkAbout20250408.tiffResolution
Approve Regulating, Warning, and Guiding Traffic during Temporary Closure of
Count Road 22 between County Roads 15 and 17 for approximately Five (5) Days,
for Repair of Natural Gas Pipeline
Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective
jurisdiction may, for the purpose of road construction and maintenance, temporarily close
to through traffic or to all vehicular traffic any highway or portion thereof for a period not
to exceed a specified number of work days for project completion and shall, in conjunction
with any such road closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
Whereas, pursuant to said Statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary
to temporarily close County Road 22, between County Roads 15 and 17, to through traffic
and to regulate, warn and guide vehicular traffic by posting signs thereon, with said
closure being effective February 10, 2025, for approximately five (5) days for the repair
of a natural gas pipeline.
Now, therefore, be it resolved that the Board of County Commissioners of Weld County,
Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County
Roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn, and/or
guide traffic thereon for the safety of the general public and that said traffic control devices
shall conform to the Federal Manual on Uniform Traffic Control Devices.
Be it further resolved that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 22, between County Roads 15
and 17, be temporarily closed, with said closure being effective February 10, 2025, for
approximately five (5) days for the repair of a natural gas pipeline, that standard official
traffic control devices shall be erected at said closure giving notice of the restrictions.
cc:So(Rs),D:sp, kc1N, cSP
o z/1g/ 5
2025-0408
EG0024
Temporary Closure — County Road 22
Page 2
The Board of County Commissioners of Weld County, Colorado, approved the above
and foregoing Resolution, on motion duly made and seconded, by the following vote on
the 10th day of February, A.D., 2025:
Perry L. Buck, Chair: Aye
Scott K. James, Pro-Tem: Aye
Jason S. Maxey: Aye
Lynette Peppier: Aye
Kevin D. Ross: Aye
Approved as to Form:
Bruce Barker, County Attorney
Attest:
Esther E. Gesick, Clerk to the Board
2025-0408
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 6, 2025
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
DCP Operating Co. is requesting to close CR 22 between CR 15 and CR 17 from 02/10/2025 through
02/14/2025 for a natural gas pipeline repair.
See attached closure diagram.
2025-0408
2/10
www.invarion.com
Legend
:OA
Work Area
5
ROAD
WORK
AHEA
END
DETOUR
ROAD
CLOSED
AHEAD
I
tx
0
W
0
DETOUR
Map
DETOUR
AHEAD
frIaChanted tths
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD CLOSED
TO
THRU TRAFFIC
na CI r
ROAD CLOSED
TO
THRU TRAFFIC
P
ROAD
CLOSED
i/ SAT //
r/1//I
Line Leak: CR 17 & CR 22 (N-2-3) 2-2025
CR22BTWCR 17& CR 151/2
Weld County, CO.
Road Closure
MHT #1
i
r-
DETOUR
DETOUR
AHEAD
Att4alk
NORTH
ROAD
CLOSED
AHEAD
END _
DETOUR
ROAD CLOSED
TO
THRU TRAFFIC
t _
Athlas.
SUNNY N,°""Ta"s"`""""`
Date: 1/21/2025 Author: Burnt Mountain Services Ilc Project: CR 17 & CR 22 (N-2-3) 2-2025
MHT #1: Road Closure
Comments:
Plan Not drawn to scale, concept only.
Plan will conform to the latest edition of the MUTCD & all devices used A
will be within minimum compliance of the NCHRP 350/MASH Report.
Signs will be spaced 500' apart and in advance of WZ.
Hello