Loading...
HomeMy WebLinkAbout20250408.tiffResolution Approve Regulating, Warning, and Guiding Traffic during Temporary Closure of Count Road 22 between County Roads 15 and 17 for approximately Five (5) Days, for Repair of Natural Gas Pipeline Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 22, between County Roads 15 and 17, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective February 10, 2025, for approximately five (5) days for the repair of a natural gas pipeline. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 22, between County Roads 15 and 17, be temporarily closed, with said closure being effective February 10, 2025, for approximately five (5) days for the repair of a natural gas pipeline, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:So(Rs),D:sp, kc1N, cSP o z/1g/ 5 2025-0408 EG0024 Temporary Closure — County Road 22 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 10th day of February, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-0408 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 6, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item DCP Operating Co. is requesting to close CR 22 between CR 15 and CR 17 from 02/10/2025 through 02/14/2025 for a natural gas pipeline repair. See attached closure diagram. 2025-0408 2/10 www.invarion.com Legend :OA Work Area 5 ROAD WORK AHEA END DETOUR ROAD CLOSED AHEAD I tx 0 W 0 DETOUR Map DETOUR AHEAD frIaChanted tths ROAD WORK AHEAD ROAD WORK AHEAD ROAD CLOSED TO THRU TRAFFIC na CI r ROAD CLOSED TO THRU TRAFFIC P ROAD CLOSED i/ SAT // r/1//I Line Leak: CR 17 & CR 22 (N-2-3) 2-2025 CR22BTWCR 17& CR 151/2 Weld County, CO. Road Closure MHT #1 i r- DETOUR DETOUR AHEAD Att4alk NORTH ROAD CLOSED AHEAD END _ DETOUR ROAD CLOSED TO THRU TRAFFIC t _ Athlas. SUNNY N,°""Ta"s"`""""` Date: 1/21/2025 Author: Burnt Mountain Services Ilc Project: CR 17 & CR 22 (N-2-3) 2-2025 MHT #1: Road Closure Comments: Plan Not drawn to scale, concept only. Plan will conform to the latest edition of the MUTCD & all devices used A will be within minimum compliance of the NCHRP 350/MASH Report. Signs will be spaced 500' apart and in advance of WZ. Hello