HomeMy WebLinkAbout20250695.tiffResolution
Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of
County Road 39 Between County Roads 2 and 4 for Approximately Six (6) Weeks,
for Culvert Replacement, Roadway Construction, and Paving
Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective
jurisdiction may, for the purpose of road construction and maintenance, temporarily close
to through traffic or to all vehicular traffic any highway or portion thereof for a period not
to exceed a specified number of work days for project completion and shall, in conjunction
with any such road closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
Whereas, pursuant to said Statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary
to temporarily close County Road 39, between County Roads 2 and 4, to through traffic
and to regulate, warn and guide vehicular traffic by posting signs thereon, with said
closure being effective March 19, 2025, for approximately six (6) weeks for a culvert
replacement, roadway construction, and paving.
Now, therefore, be it resolved that the Board of County Commissioners of Weld County,
Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County
Roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn, and/or
guide traffic thereon for the safety of the general public and that said traffic control devices
shall conform to the Federal Manual on Uniform Traffic Control Devices.
Be it further resolved that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 39, between County, Roads 2
and 4, be temporarily closed, with said closure being effective March 19, 2025, for
approximately six (6) weeks for a culvert replacement, roadway construction, and paving,
that standard official traffic control devices shall be erected at said closure giving notice
of the restrictions.
ce : So Ots) DIsra-tc1,, CSP
.3/10 /25
2025-0695
EG0024
Temporary Closure — County Road 39
Page 2
The Board of County Commissioners of Weld County, Colorado, approved the above
and foregoing Resolution, on motion duly made and seconded, by the following vote on
the 12th day of March, A.D., 2025:
Perry L. Buck, Chair: Aye
Scott K. James, Pro-Tem: Aye
Jason S. Maxey: Aye
Lynette Peppler: Aye
Kevin D. Ross: Aye
Approved as to Form:
Bruce Barker, County Attorney
Attest:
Esther E. Gesick, Clerk to the Board
2025-0695
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: March 7, 2025
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close WCR 39 between WCR 2 and WCR 4 from
3/19/25 thru 4/25/25 for road construction, paving, and culvert replacement.
See attached closure diagram.
2025-0695
3AZ CC 0024
www.invanon.com
1 Yi
1
B E
,
rte./ ►►r Aiaii.a.►►sales
i7
Q
W20 -1F
M4-10
1
N
W20 -1E
W20 -1F
Y'vR4
M4-9
anol3a
M4-9
i
rt
U
44, a -•3ii►►•. J.•.L-Liarea • i
DETOUR
+INIIII
M4-9
O
O
M4-9
PROJECT
#
LVR
24
ROAD CLOSURE
DESCRIPTION
WCR
Closed
for
Road
39
3/19/2025
between
Construction
WCR
thru
2 and
4/25/2025
WCR
4
NOTICE
TO PUBLIC
Road
Message
signs
and
boards
barricaded
to
be
used
DETOUR ROUTE
WCR
WCR
WCR
2
45
4
between
between
between
WCR
WCR
WCR
39
45
and
2 and
and
WCR
WCR
WCR
45
4
39
1
3
3
mile
miles
miles
paved
paved
paved
NOTES
ADT
Road
Overlay
of
Construction:
WCR
Paving
is:
576/2022
Culvert
Replacement/
Prepared
1/9/2025
by:
Ryan
Reynolds
Hello