Loading...
HomeMy WebLinkAbout20250695.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 39 Between County Roads 2 and 4 for Approximately Six (6) Weeks, for Culvert Replacement, Roadway Construction, and Paving Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 39, between County Roads 2 and 4, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective March 19, 2025, for approximately six (6) weeks for a culvert replacement, roadway construction, and paving. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 39, between County, Roads 2 and 4, be temporarily closed, with said closure being effective March 19, 2025, for approximately six (6) weeks for a culvert replacement, roadway construction, and paving, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. ce : So Ots) DIsra-tc1,, CSP .3/10 /25 2025-0695 EG0024 Temporary Closure — County Road 39 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 12th day of March, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppler: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-0695 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 7, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 39 between WCR 2 and WCR 4 from 3/19/25 thru 4/25/25 for road construction, paving, and culvert replacement. See attached closure diagram. 2025-0695 3AZ CC 0024 www.invanon.com 1 Yi 1 B E , rte./ ►►r Aiaii.a.►►sales i7 Q W20 -1F M4-10 1 N W20 -1E W20 -1F Y'vR4 M4-9 anol3a M4-9 i rt U 44, a -•3ii►►•. J.•.L-Liarea • i DETOUR +INIIII M4-9 O O M4-9 PROJECT # LVR 24 ROAD CLOSURE DESCRIPTION WCR Closed for Road 39 3/19/2025 between Construction WCR thru 2 and 4/25/2025 WCR 4 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE WCR WCR WCR 2 45 4 between between between WCR WCR WCR 39 45 and 2 and and WCR WCR WCR 45 4 39 1 3 3 mile miles miles paved paved paved NOTES ADT Road Overlay of Construction: WCR Paving is: 576/2022 Culvert Replacement/ Prepared 1/9/2025 by: Ryan Reynolds Hello