Loading...
HomeMy WebLinkAbout20252695.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Roads 1.5 and 3 Between County Roads 10 and 10.5 for Approximately Seven (7) Weeks, for Roadway Construction and Paving Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Roads 1.5 and 3, between County Roads 10 and 10.5, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective October 13, 2025, for approximately seven (7) weeks for roadway construction and paving. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Roads 1.5 and 3, between County Roads 10 and 10.5, be temporarily closed, with said closure being effective October 13, 2025, for approximately seven (7) weeks for roadway construction and paving, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: So(RS), D;Spa.+ct.,, CS? 1O/gV25 2025-2695 EG0024 Temporary Closure — County Roads 1.5 and 3 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 29th day of September, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Excused Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-2695 EG0024 MEMORANDUM TO: Clerk to the Board DATE: September 23, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 1.5/3 between WCR 10 and WCR 10.5 from 10/13/25 thru 11/26/25 for Road Construction/Paving. See attached closure diagram. 2025-2695 qc www.invanon.com WCR 12.5 as a S i if ■ 0 •V CR 1 15 D W20 -1F M4:10 NORTH VIEW DR � = . t` � � ' S. a� N 2 13 f�l .m ua [n - c p d. w 13 O 'A sc CD tin v } LL Pa le ft Stmt RI,E DE TRUST w O1 x XatiMEWS W20 -1F OLD STATE HI GHWAy. r M4-9 LONGS PEA PC Summit STREET v P � � .. seas MOUNTAIN VIEW STREET • � F G > +m "d ,-. SPRUCE \ DRIVE LO0LIG w,L Qr >w m0 et U w 0 < w 0 co --I (..) W CR 10 ERIE ■ M4-9 ■ P44-9 BULRUSH BL W CR 12 >- J CD _J T CC —gyp_- - - s • Y C ▪ Ili LSI Q a- 3 eC i BRUCE is ROAD i • PROJECT # LVR-26 ROAD CLOSURE DESCRIPTION WCR Closed for 1.5/3 Road 10/13/2025 Construction/Paving between thru WCR 11/26/2025 10 and WCR 10.5 NOTICE TO PUBLIC Road 'Message signs and boards barricaded to be used DETOUR ROUTE SH WCR WCR 52 between 5 10 between between WCR SH WCR 52 3 and and 5 and WCR WCR WCR 5 1 10 3 2 mile 1 mile mile paved paved paved NOTES ADT Road of WCR Construction is: 4033/2023 and Paving Prepared 9/12/2025 by: Ryan Reynolds Hello