HomeMy WebLinkAbout20252695.tiffResolution
Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of
County Roads 1.5 and 3 Between County Roads 10 and 10.5 for Approximately
Seven (7) Weeks, for Roadway Construction and Paving
Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective
jurisdiction may, for the purpose of road construction and maintenance, temporarily close
to through traffic or to all vehicular traffic any highway or portion thereof for a period not
to exceed a specified number of work days for project completion and shall, in conjunction
with any such road closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
Whereas, pursuant to said Statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary
to temporarily close County Roads 1.5 and 3, between County Roads 10 and 10.5, to
through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon,
with said closure being effective October 13, 2025, for approximately seven (7) weeks for
roadway construction and paving.
Now, therefore, be it resolved that the Board of County Commissioners of Weld County,
Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County
Roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn, and/or
guide traffic thereon for the safety of the general public and that said traffic control devices
shall conform to the Federal Manual on Uniform Traffic Control Devices.
Be it further resolved that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Roads 1.5 and 3, between County
Roads 10 and 10.5, be temporarily closed, with said closure being effective October 13,
2025, for approximately seven (7) weeks for roadway construction and paving, and
further, that standard official traffic control devices shall be erected at said closure giving
notice of the restrictions.
cc: So(RS), D;Spa.+ct.,, CS?
1O/gV25
2025-2695
EG0024
Temporary Closure — County Roads 1.5 and 3
Page 2
The Board of County Commissioners of Weld County, Colorado, approved the above
and foregoing Resolution, on motion duly made and seconded, by the following vote on
the 29th day of September, A.D., 2025:
Perry L. Buck, Chair: Aye
Scott K. James, Pro-Tem: Aye
Jason S. Maxey: Aye
Lynette Peppier: Aye
Kevin D. Ross: Excused
Approved as to Form:
Bruce Barker, County Attorney
Attest:
Esther E. Gesick, Clerk to the Board
2025-2695
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: September 23, 2025
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close WCR 1.5/3 between WCR 10 and
WCR 10.5 from 10/13/25 thru 11/26/25 for Road Construction/Paving.
See attached closure diagram.
2025-2695
qc
www.invanon.com
WCR 12.5
as a
S
i
if
■
0
•V CR 1 15
D
W20 -1F
M4:10
NORTH
VIEW DR
�
= . t`
� � ' S.
a� N 2 13
f�l
.m ua [n -
c p d. w
13
O 'A sc
CD
tin
v
}
LL
Pa le ft Stmt
RI,E DE
TRUST
w
O1
x
XatiMEWS
W20 -1F
OLD STATE HI GHWAy.
r
M4-9
LONGS
PEA PC
Summit STREET
v P � � ..
seas MOUNTAIN
VIEW STREET
•
� F
G
> +m "d
,-. SPRUCE
\ DRIVE
LO0LIG
w,L Qr >w
m0 et U w 0 < w 0 co --I (..)
W CR 10
ERIE
■
M4-9
■
P44-9
BULRUSH BL
W CR 12
>- J
CD _J
T
CC
—gyp_- - -
s
• Y C
▪ Ili LSI Q
a- 3 eC
i
BRUCE
is ROAD
i
•
PROJECT
#
LVR-26
ROAD CLOSURE DESCRIPTION
WCR
Closed
for
1.5/3
Road
10/13/2025
Construction/Paving
between
thru
WCR
11/26/2025
10
and
WCR
10.5
NOTICE
TO PUBLIC
Road
'Message
signs
and
boards
barricaded
to
be
used
DETOUR ROUTE
SH
WCR
WCR
52
between
5
10
between
between
WCR
SH
WCR
52
3 and
and
5
and
WCR
WCR
WCR
5 1
10
3
2
mile
1
mile
mile
paved
paved
paved
NOTES
ADT
Road
of
WCR
Construction
is:
4033/2023
and
Paving
Prepared
9/12/2025
by:
Ryan
Reynolds
Hello