Loading...
HomeMy WebLinkAbout20250979.tiffCOLORADO Department of Public Health 8 Environment DCP Operating Company, LP 3026 4th Avenue Greeley, CO 80631 April 8, 2025 To whom it may concern: RECEIVED APR 0 8 2025 \PIELD COUNTY COMMISSIONERS On April 8, 2025, the Air Pollution Control Division will begin a 30 -day public notice period for DCP Operating Company, LP - Spindle Natural Gas Processing plant. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. Enclosure FAO Lg141zs 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 CDPHE Website Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director -PwACJileKIMIDNI-1sB),OG (SC-) yI1125 2025-0979 Air Pollution Control Division -M'74"- •1 41 Notice Of A Proposed Renewal Title V Operating Permit Warranting . %Or Public Comment Website Title: DCP Operating Company, LP - Spindle Natural Gas Processing plant - Weld County Notice Period Begins: April 8, 2025 Notice Period Ends: May 8, 2025 NOTICE is hereby given that an application to renew an Operating Permit has been submitted to the Colorado Air Pollution Control Division, 4300 Cherry Creek Drive South, Denver, Colorado 80246-1530, for the following source of air pollution: Applicant: DCP Operating Company, LP 3026 4th Avenue Greeley, CO 80631 Facility: Spindle Natural Gas Processing plant DCP Operating Company, LP has applied to renew the Operating Permit for the Spindle Natural Gas Processing plant in Weld County, CO. Natural Gas Processing Plant This renewal incorporates one minor modification and eight significant modifications, which includes the following changes: the installation of a vapor return line connecting the condensate loadout point to the facility flare, the incorporation of Colorado Construction Permits 15WE1132 and 23WE0520 for the dehydration unit and the fugitive VOC emissions, the modification of emission limits for various engines pursuant to Colorado Regulation No. 26 updates, the modification of the emission limit and sampling requirements for P-178 (AIRS 063), replacement of process heater P179 (AIRS 064) with process heater H-800 (AIRS 091), and the removal of engine C-212 (AIRS 062). This renewal results in an overall decrease of total permitted emissions by 112.1 tpy of NOx, 109.2 tpy of CO, and 57.5 tpy of VOC, an increase of permitted emissions by 26 tpy of fugitive VOC and 1.1 tpy of PM, and no change in permitted emissions of SO2 (in comparison to September 2020 permitted emission limits). A copy of the application, including supplemental information, the Division's analysis, and a draft of the Renewal Operating Permit 95OPWE039 are available on the Division's website. The Division 2.02 1.Sm COLORADO nepxement f r,�ue Health 6 Emilio to has made a preliminary determination of approval of the application. Based on the information submitted by the applicant, the Division has prepared the draft renewal operating permit for approval. Any interested person may contact the Division at cdphe_apcd_title_v@state.co.us to obtain additional information. Any interested person may submit written comments to the Division concerning 1) the sufficiency of the preliminary analysis, 2) whether the permit application should be approved or denied, 3) the ability of the proposed activity to comply with applicable requirements, 4) the air quality impacts of, alternatives to, and control technology required on the source or modification, and 5) any other appropriate air quality considerations. Any interested person may submit a written request to the Division for a public comment hearing before the Colorado Air Quality Control Commission (Commission) to receive comments regarding the concerns listed above as well as the sufficiency of the preliminary analysis and whether the Division should approve or deny the permit application. If requested, the hearing will be held before the Commission within 60 days of its receipt of the request for a hearing unless a longer time period is agreed upon by the Division and the applicant. The hearing request must: 1) identify the individual or group requesting the hearing, 2) state his or her address and phone number, and 3) state the reason(s) for the request, the manner in which the person is affected by the proceedings, and an explanation of why the person's interests are not already adequately represented. The Division will receive and consider the written public comments and requests for any hearing for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use this web form. This page also includes guidance for public participation • Send an email to cdphe apcd airpermitcomments@state.co.us • Send comments to our mailing address: Title V Operating Permits Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 COLORADO Depaxtenent of Public Health 6 ,,11. nmext NOTE: Comments submitted to the Division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. Hearing requests may be submitted to the email address or the mailing address noted above. Note that the draft/proposed permit is subject to parallel EPA review (pursuant to 40 CFR S 70.8(a)(1) and 40 C.F.R. S 70.8(a)(1)(ii)). 45 -Day EPA Review Period Start Date: April 9, 2025 45 -Day EPA Review Period End Date: May 27, 2025 2.02 COLORADO 147DepnttrentefPublle 0:6 E Ills ant Hello