Loading...
HomeMy WebLinkAbout20251135.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Temporary Closure of County Road 21 Between County Road 28 and State Highway 66 for Approximately Three and a Half (3.5) Weeks, for Mill and Overlay Roadway Construction Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 21, between County Road 28 and State Highway 66, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective May 12, 2025, for approximately three and a half (3.5) weeks for mill and overlay roadway construction. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 21, between County Road 28 and State Highway 66, be temporarily closed, with said closure being effective May 12, 2025, for approximately three and a half (3.5) weeks for mill and overlay roadway construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc•.so(RS),D�SP0.+G1., CSP O5 /O8/2.5 2025-1135 EG0024 Temporary Closure — County Road 21 Page 2 The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 28th day of April, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-1135 EG0024 MEMORANDUM TO: Clerk to the Board DATE: April 22, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 21 between SH 66 and WCR 28 from 5/12/25 thru 6/4/25 for road construction: mill, overlay. See attached closure diagram. 2025-1135 EC -,OOZE www.invanon.com DETOUR ano�3a M4-9 M4-9 r M4-9 ♦` *rift i. WCR 28 � ib•a.` . � W20 -1F W20 -1F W20 -1F PROJECT #AN -612025 ROAD CLOSURE DESCRIPTION WCR Closed for Road 21 5/12/2025 between Construction: SH thru 66 6/4/2025 Mill; and Overlay WCR 28 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE SH WCR WCR 66 between 19 28 between between WCR SH WCR 21 66 and and 19 and WCR WCR WCR 19 1 28 1 21 mile mile 1 mile paved paved gravel NOTES: ADT Road of WCR Construction: is: 559/2022 Mill, Overlay Prepared 4/22/2025 by: Ryan Reynolds Hello