Loading...
HomeMy WebLinkAbout20251656.tiffResolution Approve Regulating, Warning, and Guiding Traffic During Extension of Temporary Closure of County Road 29 Between County Road 74 and State Highway 14 for Approximately an Additional Three (3) Weeks, for Unanticipated Delays Due to Inclimate Weather Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and Whereas, pursuant to C.R.S. §42-4-106(6)(a), "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and Whereas, on the 10th day of February, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board determined that conditions existed which made it necessary to temporarily close County Road 29, between County Road 74 and State Highway 14, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective February 24, 2025, for approximately four (4) months, through July 2, 2025, for a culvert replacement and roadway construction, and Whereas, on the 16th day of June, 2025, pursuant to said Statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to extend said temporary closure of County Road 29, between County Road 74 and State Highway 14, with said extended closure being effective July 2, 2025, for approximately an additional three (3) weeks through July 25, 2025, for unanticipated delays due to inclimate weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Now, therefore, be it resolved that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn, and guide vehicular traffic on County Roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn, and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. cc:so(as),U.sp. tek, CSP 06/iq /2S 2025-1656 EG0024 Extension to Temporary Closure — County Road 29 Page 2 Be it further resolved that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 29, between County Road 74 and State Highway 14, be, and hereby is, extended, with said extended closure being from July 2, 2025, for approximately an additional three (3) weeks through July 25, 2025, for unanticipated delays due to inclimate weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The Board of County Commissioners of Weld County, Colorado, approved the above and foregoing Resolution, on motion duly made and seconded, by the following vote on the 16th day of June, A.D., 2025: Perry L. Buck, Chair: Aye Scott K. James, Pro-Tem: Aye Jason S. Maxey: Aye Lynette Peppier: Aye Kevin D. Ross: Aye Approved as to Form: Bruce Barker, County Attorney Attest: Esther E. Gesick, Clerk to the Board 2025-1656 EG0024 MEMORANDUM TO: Clerk to the Board DATE: June 11, 2025 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to extend the closure on WCR 29 between WCR 74 and SH 14 from the original end date of 7/2/2025 to 7/25/25 due to weather conditions. This road was closed on 3/10/2025 for a culvert replacement and road construction. See attached closure diagram. 2025-1656 EC1OUZ4I- www.invanon.com ,. ,014: T`N U/ 1 uk 3.0143 71 M4I-10 w 4 0 et i S 4 - anoi3a anoi3a i 1!(1O130 M4-103 r DETOUR M4-103 PROJECT # HRP-100 ROAD CLOSURE DESCRIPTION i WCR 29 between WCR 74 and SH 14 Closed 3/10/2025 thru 7/25/2025 for Culvert Replacement and Road Construction NOTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE WCR 74 between WCR 31 between SH 14 between WCR 29 and WCR 31 1 mile paved WCR 74 and SH 14 4 miles paved WCR 31 and WCR 29 1 mile paved NOTES ADT of WCR is: 1115/2023 Culvert Replacement and Road Construction Prepared by: Ryan Reynolds 2/5/2025 Hello