HomeMy WebLinkAbout20252043.tiffa to
COLORADO
Department of Public
Health Et Environment
Weld County - Clerk to the Board
1150 0 St
PO Box 758
Greeley, CO 80632
July 14, 2025
To Whom It May Concern:
RECEIVED
JUL 14 2025
WELD COUNTY
COMMISSIONERS
On July 14, 2025, the Colorado Air Pollution Control Division will begin a 30 -day public
comment period for PDC Energy, Inc. - B -Farm LD Pad. A copy of this public notice is
enclosed.
Thank you for assisting the division by posting a copy of this notice in your office. A
public copy of this notice is required by Colorado Air Quality Control Commission
regulations. The notice must be available for public inspection for a period of thirty
(30) days from the beginning of the public comment period. Please reference the
public notice for instructions on submitting comments.
OF CO�O�
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Ohl ; j u ij,u)
Izi 17_5
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
cc,: ?L_LpEr M N) +I L- C15),
wCG+)c /DI) f Do (st3), 0C (ac-)
'l l(6) 2,5
2025-2043
a 47.'74'
Website Title:
Air Pollution Control Division
Notice of a Proposed Construction Permit Warranting Public Comment
PDC Energy, Inc. - B -Farm LD Pad - Weld County
Notice Period Begins: July 14, 2025
Notice is hereby given that an application for a proposed project or activity has been submitted to
the Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: B -Farm LD Pad
Well Production Facility
NENW Section 7 T1 S R67W
Weld County
The proposed project or activity is as follows:
PDC Energy, Inc. is requesting a permit modification to use state -default emission factors
for a produced water storage tank covered under 19AD0555.
The division has determined that this permitting action is subject to public comment requirements
under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to
the following reason(s):
• This source is requesting a federally -enforceable limit on the potential to emit to avoid
other requirements. (Regulation Number 3, Part B, Section III.C.1.d.)
The division has made a preliminary determination of approval of the application.
A copy of the application, the division's analysis, and a draft of construction permit number
19AD0555 are available on the division website: Air Permit Public Notices
4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.cotorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
The division hereby solicits submission of public comments from any interested person concerning
the ability of the proposed project or activity to comply with the applicable standards and
regulations of the commission. The division will receive and consider written public comments for
thirty (30) calendar days after the date of this notice. Comments may be submitted using the
following options:
Submit comments via web form: Form for Public Comment on Draft Permit
Submit comments via email: cdphe_apcd airpermitcomments@state.co.us
Submit comments via mail:
Air Pollution Control Division - Oil Ft Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, CO 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and
will be accessible to the public. Your comment(s) and the division's response(s) are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comment(s).
4300 Cherry Creek Drive S., Denver, CO 80246-1530 I P 303-692-2000 I www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
Hello