HomeMy WebLinkAbout20242810.tiffINVENTORY OF ITEMS FOR CONSIDERATION Applicant: Taelor Solar 1, LLC Case Number: USR24-0014 Submitted or Prepared Prior to Hearing At Hearing 1 Mike Cervi, letter received September 23, 2024 X 2 Art Guttersen, letter received September 25, 2024 X 3 Returned mail X 4 Middle South Platte Company, letter received October 9, 2024 X 5 Michelle Miller, email received October 14, 2024 X 6 Applicant power point presentation X I hereby certify that the six items identified herein was submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners' hearing. Diana Aungst, Planner RECEIVED SEP 2 3 1014 September 19, 2024 Weld County Planning Department Weld County Board of Commissioners 1150'x' Street R.O. Box 758 Greeley, Co 80632 Dear Weld County Board of Commissioners: As a landowner In Weld County, I am writing to state my support for the Taeler Solar Project which is proposed on private property in the community. This project will provide income for the egriculturel landowner and increase property tax refund tor the county. The increased tax revenue will help our schools, fire district and the general fund. Thank you for your consideration in this matter. • Sincerely, r 41/44 Mike Cervi Cervi Enterprises, Inc. PO Box 1930 Greeley, CO X32-1930 IKE CEPSI Office (970) 356.80Q!D Fax (970) 336-6008 Home (303) 849-5533 Aar GUTTERSEN 23691 HIGHWAY 263 • G R EE L E Y, CO 80631 OFFICE: (970) 378-Fi888 WASHOUT (970) 352-00 FAX: (970) 378-0OCO Weld County Board of Commissioners 1150 O Street P.O. Box 758 Greeley, Colorado 80631 September 23, 2024 Dear Weld County Board of Commissioners, As a local property and business owner, I am writing to express my strong support for the proposed Taelor Solar Project in Weld County. This project will be constructed on private land that currently generates insufficient income to cover property taxes. Given the land's limitations —particularly the lack of adequate water for farming and its marginal suitability for livestock grazing ---a solar project represents a much more viable and sustainable use. It would not only provide reliable income for the landowner but also generate significant tax revenue for Weld County, benefiting all residents. Beyond direct financial benefits to the landowner, the broader community will also see substantial advantages. During construction, the project will stimulate the local economy by creating jobs, utilizing local equipment and resources, and supporting area businesses. These short-term economic impacts will be followed by long-term benefits, including full-time employment opportunities for local residents and a consistent stream of tax revenue. This revenue will be essential for supporting critical services, such as local schools, fire districts, and the maintenance of county roads by Weld County Public Works, along with contributions to the general fund. In addition to economic growth, this project also supports Colorado's broader sustainability goals. As part of the state's Renewable Energy Standard (R ES), which aims for 100% renewable electricity by 2040, and the Greenhouse Gas Pollution Reduction Roadmap, which targets a 50% reduction in emissions by 2030, the Taelor Solar Project will play a vital role in advancing Weld County's contribution to these critical initiatives. Furthermore, by aligning with the Colorado Solar and Storage Initiative, this project positions the county as a leader in the state's transition to clean, renewable energy sources, attracting future investments and bolstering the local economy. The Taelor Solar Project delivers both immediate and long-term benefits to the landowner, the community, and Weld County. Its potential to boost economic growth, generate jobs, increase tax revenue, and support the county's transition to renewable energy makes it a clear asset to the region. Thank you for your time and consideration. Sincerely, Art Guttersen EXHIBIT &to Case # I Casa #: USR24-0014 DENVER Co 602 Name I Nombre. Magnum Feedyard Co. LLC, do Taelor Solar 1, LLC 11 -SE,P 2024 PM 6 Proposed Project: USR for the construction of a 1041 Solar Energy Facility The facility including a Solar Energy Facility with a generating capacity up to 650 megawatt AC 2) A Battery Energy Storage Facility planned for 650 MWh with a possible increase to up to 1,300 MWh; a substation to interconnect the project to the high voltage transmission system; an operations area including an operations and maintenance building, possible water storage, materials storage and parking; an onsite communication system; Meteorological Stations (approximately 15 -feet high on posts); up to seven (7) construction trailers and ten (10) conex containers during construction; and up to four (4) conex containers will be retained for parts storage in the Agricultural Zone District. Proyecto Propuesto: USR para la construction de una instalacion de Energia Solar 1041. La instalacion incluye una instalacion de energia solar con una capacidad de generacion de hasta 650 megavatios CA 2) una instalaciOn de almacenamiento de energia en baterias prevista para 650 MWh con un posible aumento hasta 1.300 MWh; una subestacion para interconectar el proyecto al sistema de transmisiOn de alta tension; un area de operaciones que incluye un edificio de operaciones y mantenimiento, posible almacenamiento de ague, almacenamiento de materiales y estacionamiento; un sistema de comunicacibn en el sitio; Estaciones meteorologicas (aproximadamente 15 pies de altura en postes); hasta siete (7) remolques de construction y diez (10) contenedores Conex durante la construcabn; y se retendran hasta cuatro (4) contenedores conex para almacenamiento de piezas en el Distrito de Zona Agricola. Location: 2 miles south of I-76/CR 91 intersection; 0.75 miles north of CR 20/CR 93 intersection; west of and adjacent to Weld and Morgan County Line; approximately 7.5 miles east of CR 75.5 Ubicacion: 2 millas al sur de la interseccion I-76/CR 91; 0,75 minas al node de la interseccion CR 20/CR 93; al oeste y adyacente a la linea de los condados de Weld y Morgan; aproximadamente 7 5 millas al este de CR 75.5 Planner / Planificador: Chris Gathman PC Hearing Date: October 15 2024 at 1:30 p.m. PC Fecha de audiencia: 15 de octubre de 2024 a las 13:30 horas BOCC Hearin : October 30, 2024 at 10:00 Facture; a%L1Ic%'&%B&1 `.iciaixtutry, t _ i6ras .%• US POSTAGE v I'F'S welES 014 erre r ZIP 80631 t 000 690 0241`f 0000335769 SEP 11 7024 Weld County Planning Services 1402 N. 17th Ave P.O. Box 758 Greeley, CO 80632 UNITED STATES OF AMERICA PO BOX 151029 LAKEWOOD CO 80215 a Case # / Caso #: USR24-0014 DENVER CO 802 Name / Nombre: Magnum Feedyard Co. LLC, do Taelor Solar 1, LLC 11 SEP 2024 PM 6 Proposed Project: USR for the construction of a 1041 Solar Energy Facility. The facility including a Solar Energy Facility with a generating capacity up to 650 megawatt AC 2) A Battery Energy Storage Facility planned for 650 MWh with a possible increase to up to 1,300 MWh; a substation to interco�nnect the project to the high voltage transmission system; an operations area including an operations and maintenance building, possible water storage, materials storage and parking; an onsite communication system; Meteorological Stations (approximately 15 -feet high on posts); up to seven (7) construction traders and ten (10) conex containers during construction; and up to four (4) conex containers will be retained for parts storage in the Agricultural Zone District Proyecto Propuesto: USR para la construction de una instalacion de Energia Solar 1041 La instalaciOn incluye una instalacion de energia solar con una capacidad de generacion de hasta 650 megavatios CA 2) una instalacion de almacenamiento de energia en baterlas prevista para 650 MWh con un posible aumento hasta 1.300 MWh, una subestaciOn para interconectar el proyecto al sistema de transmisibn de alta tension; un area de operaciones que incluye un edificio de operaciones y mantenimiento, posible almacenamiento de agua, almacenamiento de materiales y estacionamiento; un sistema de comunicacion en el sitio; Estaciones meteorologicas (aproximadamente 15 pies de altura en postes); hasta siete (7) remolques de construction y diez (10) contenedores Conex durante la construccidn; y se retendran hasta cuatro (4) contenedores conex para almacenamiento de piezas en el Distrito de Zona Agricola Location: 2 miles south of 1-76/CR 91 intersection; 0.75 miles north of CR 20/CR 93 intersection; west of and adjacent to Weld and Morgan County Line; approximately 7.5 miles east of CR 75.5 Ubicacicn: 2 millas al sur de la intersection 1-76/CR 91; 0,75 millas al node de la intersection CR 20/CR 93; al oeste y adyacente a la linea de los condados de Weld y Morgan; aproximadamente 7.5 millas al este de CR 75.5 Planner / Planificador: Chris Gathman PC Hearing Date: October 15 2024 at 1:30 p.m. PC Fecha de audiencia: 15 de octubre de 2024 a las 13:30 horas ,--aseee e ti v r r fir VIIPIV �''-v ati'� ! laa4 , e ,:816 ,7 o.AOA � tifoe C it ♦Csi. a US POSTAGE IS'P1TNEV BOWES tif trim= sailIPPAIS ZIP soggy, $ 000.69° 02 Iry 0000335769 SEP 11 2024 Weld County Planning Services 1402 N. 17th Ave P.O. Box 758 Greeley, CO 80632 wewpedea thun ¶ZOZ tL[S a3A130:2H BONNIE TAYLOR WULFF 21 NEWELL COURT MENANDS NY 12204 BOCC Hearing Date: October 30, 2024 at 10:00 a.m. T•,,,, Fecha de audiencia de BOCC: 30 de octubre de 2024 a las 'tS horas I 3.- 1111"11'11f11$111,11,0 fi his A ele‘ (co (P e Casa #8 o #: USR24-0014 24 CI f DENVER ER 802 Name Nombre: Magnum Feedyard Co. LLC, c/o Tailor Solar 1 a LLC 1 1 SEP224PM5L Proposed Project USR for the constructfon of a 1041 Solar Energy Facility The silty including a Solar Energy Facility with a generating capacity up to 650 megawatt AC 2) A Battery Energy Storage Facility planned far 650 MWh with a possible increase to up to 1,300 MWh; a substation to Interconnect the prat to the high voltage transmission system; an operations area including an operations and msrr enanOe building, possible water store, materials storage and parking; an onsite communication system; Meteorological Stations ( proximately 15 -feet high on posts); up to seven (7) construction trailers and ten (10) cortex containers during construction; on; and up to four (4) conex containers will be retained for ports storage In the Agricultural Zone District Preyec+to Prupussto: USR pars Is construacion de una Instalacion de Energla Solar 1041 La instalaciOn Induye una instalacion de energia mar con ens capaddecl de generation de haste 650 megavat 2) una instalacion de almacenamlento de energia en baterias prevista pare 651 MWh can un posible aunento haste 1.300 MWh; una subestaclon pars inter onectar el proyecto al sistema de trensmiaidn de airs tension; un area de operacionea qua incluye un edlfloic de operaclones y maantenirilentc, posible alrnacenamiento de ague, almacenamiento de materiaales y a Gtacianariento; un sistema de comunicacion en el sitio; Estacionea met logl (aproxirnadamenta 15 pies de altura en pastes); haste sista (7) remelques de contraction y diez (10) contenedores Conex durante la ctnstrucclon; y se retendrin bests cuatro (4) conteredores cortex para almacenamiento de pietas en el Distrito de Zone Agricola. Location: 2 miles south of l-761CR 91 interne on; 015 miles north of CR R 93 intersactinn; west of and adjacent to Weld and Morgan County Line; approximately 7 5 mikes east of CR 75.5 ublcacien: 2 millas al sur de la intersr do 1-7 R 91 0,75 millas al norte de la intcraeccidn CR 20tCR 93; al oaf y adyacente a la lines de los condedos de Weld y Morgan; aproxlmadamente 7.5 mulles al este de CR 75.5 Planner / Plan dor: Chris Gagman PC Hearing Date: October 15 2024 at 1:30 p.m. PC Facha de audiencia: 15 de octubre de 2024 a las 13:30 horse [MCC Hearing Date: October 30, 2024 at 10:00 am. u T Pecks de sudiencia de C: 30 de US POSTAGE ..Pn Y EIMES gray= 414•01631 MX1•6 0000335769 SEP 11 2024 Weld County Planning Services 1402 N. 17th Ave Pees Box 758 Greeley CO 80632 BUREAU OF LAND MANAGEMENT 2850 YOUNGFIEW ST uracEve000 CO 80215 Vase 11/ Case it R24-0014 DENVER 2 Name l Nombre: Magnum Feedyard Co. LLB, c/o Tailor Solar 1,. LW P24PM 5L. Proposed Project USR for the congtiruction of a 1041 Solar Energy Facility. The facility including a Solar Energy Facility with a generating aspaclty up to 550 megawatt AC 2) A Battery Energy Storage Facility planned for 650 MWh with a possible increase to up to 1,300 MWh; a substation to intercrinnect the project to the high voltage transmission system; an operations area including an operations and maintenance building, possible water stay*, materials storage and parking; an oneite communication system; Meteorological Stations (approximately" 154eet high on posts); up to seven (7) construction trailers and ten (10) conex contaimrs during construction; and up to four (4) conex containers will be retained for parts storage in the Agricultural Zone District Prayveto Prupuesto: USR pare la construccion de una instalacion de Energda Solar 1041. Ui instaiaciOn incluye una instaladOn de energia mar con una capucrdad de generuclon de haste 650 megavataO5 CA 2) uris Instal:06n de aicnacertamiertto de energia en baterlas prevista pare 650 MWh con un posibie aumento haste 1.300 MWh; una rut talon pars interconeotar el prayecto al Stems de transmision de site tension; un Ira de oper-aciones qua induye un eado de operrtones y mantenirientc, posible alrnacenamiento de U L:ua, almacenamiento de material)ca y eatacionamiento; un Stems cia comunicaciOn en el sitio; Estacionee mateoroldgicas (aproxirnadamentc 15 pies de allure en posies); haste siete (7) rernulques de construct On y disz (10) enntenedores Cox durante Is ctnacion; y so retendrin haste cuatro (4) contsn&kores conex pare almacenarniento de plazas en el Distrito do Zone Agricola. Location; 2 miles south of 1481 R 91 intersection; 0475 miles north of CR 20/CR 93 intersection; west of and adjacent to Weld and Morgan County Line; approximately 7.5 miles east of CR 75.5 Ubicacidrn; 2 millas al sur de Is interaecci4n I-76/CR 91; 0,75 millas al norte de Ia interseccidn CR 20/CR 93; al oeste y adyacenta a Is lines de los c ondedas de Weld y Morgan; aproxir nudomerde 7.5 mega al este de CR 75 5 Planner/ Planificada►r: Chris Gathman PC Hearing Date: October 15 2024 at 1:30 p.m. PC Fiche de anudiencler: 15 de octubre tie 2024 alas 13:30 hares ii0004411friteilleitactiat�4 at 10:00 an. I `' t Fecha de audiencla de BOCC: 30 de toraas THOMAS GALJMEN 2880 S LOCUST DENVER 03 80222 • 4 gaPISESSOIT f 1 AC ;' d oit. Ike 1?r..St 0447 ;- US POSTAGE PpnrcYaMea (trim gar aliglassa: ZIP 00631 g Ann 0.890 00 0033.5769 SEP 11 2024 Weld County Planning Services 1402 H. 47th Ave P.O. Box 758 Greeley, Co 80632 4 I 4 .v 0 �, f Cr "I • r x► • 4, Case 0 I case #: USR24-0014 DENVER OD 802 Name I Nombre: Magnum Feedyard Co. LLC, 010 l e`or Solar t, LLC Proposed Project USR for the construction of a 1 041 Solar Energy Facioppgiate#024 PM 6 including a Solar Energy Facility with a generating c acity up to 650 megawatt AC 2) A Batten/ Energy Storage Facility planned for 650 MWh with a possible increase to up to 1,300 PAWN a substation to interconnect the project to the high voltage transmission system; an operations area including an operations and maintenance building, possible water storage, materials storage and parking; an onsite communication system; Meteorological Stations (approximately 15 -feet high on posts) up to seven (7) construction trailers and ten (10) conex containers during construction; and up to four (4) conex containers will be retained for parts storage in the Agricultural Zone District. Proyecto Propueete: USR pare la constucciOn de una lnstalaciOn de Eriergia Solar 1041 La instalaciOn incluye una instalacibn de energfa solar con una capacidad de generadiOn de haste 650 megavatios CA 2) una instalacion de almacenamiento de energia en baterlas prevista para 650 11Wh con un posible aumento haste 1.300 MWh; una subestaciOn pars interconectar el proyecto al Sterna de transrnision de alta tension; un Irea de opera ones quo incluye un edificla de operaclones y mantenimiento, posibte almacenamiento de ague, almacenamiento de rnateriiales y estacionamiento; un sistema de cornunicacic n en el 51tio; Eataciones rneteorclagi!cas (aproximadarnente 15 pies de altura en postes); haste siete (7) remokNes de co►nstrucci0n y diez (10) oontenedores Conex durante la construction; y se retendran haste cuatro (4) contenedorea conex pars almacenamiento de plazas en el Distrito de Zona Agricola Location: 2 miles south of 1-76/ R 91 intersection; 0 75► miles north of CR 20 R 93 intersection; west of and adjacent to Weld and Morgan County Line; approximately 7.5 miles east of CR 75.5 Ublcacion: 2 minas al sur de la inter con 1-76/CR 91: 0,75 minas al norte de la inter sec & CR 20/CR 93; al oeste y adyacente a Is lines de los condados de Weld y Morgan; aproximadarnente 7 5 millas al este de CR 75.5 Planner I Planificador: Chris Gathman PC Hearing Date: October 15 2024 at 1:30 p.m. PC Fecha de audlenc la: 15 de octu bra de 2024 a las 13:30 hares BOGO RaIR*ttta gaitiMinA at 10:00 a.m AN X. Fechs Flitjayersii ''i p 4ibepubre de 2024 a las 10:00 horn a°221te "re - US POSTAGE KAMPtY SE'S a 0,— �.�� see a !Di _away zIP MI 1 I $ 000 69° 0000335769 SEP 11 2024 Weld County Planning Services 1402 N. 17th Ave F O. Box 758 Greeley, CO 80632 JOSEPHINE CLARK 12513 W ALAMEDA CSR LAKEWOOD CO 80228 IiiLyy11111���I� I ars a' EXHIBIT Li‘otkoolit Middle South Platte Reservoir Company January 22, 2024 Tom Parko, Community Development Coordinator Weld County Planning and Zoning Department P.O. Box 758 1402 N. 17th Ave Greeley, CO 80632 Dear Mr. Parka, We are writing on behalf of MSP Reservoir Company, LLC ("MSP") to notify you that we have met with Mr. Steve Gabel (landowner) and Mr. Matt Mooney, VP of Development for Balance Rock Power to discuss the Taetor Solar 1, LLC project located immediately adjacent to [and we control on the south side of 1-76 at Exit 57 CR 91, in Weld County, consisting of approximately 3,200 acres. We met to voice concerns about erosion control and reclamation obstacles that may result from installation of the the solar project and create "blowouts" impacting land. MSP also expressed understanding that our project will need to address the same issues regarding Mr. Gabel's Land. MSP is satisfied that both parties have agreed in principle to arrive at solutions that will address these concerns and are mutually beneficial, including to be agreed upon setbacks from our common property line. We have not agreed to specifics at this time but do believe we have agreed to work together in good faith and are confident the parties wilt resolve these and other small items that may come up during their approval process. Our goat is to work in good faith with Mr. Gabel, as our neighbor and long-standing property owner to advance both of our projects. Thank you and please feel free to contact me if you have questions. Michael Vickers Chief Operating Officer and Managing Member 70* P/te*,42.4, Acknowledged and approved: Matt Yo am Matt Yo a m Property Owner and Managing Member afrn. gad/64a, Sal, Joshua Suter Managing Member From: Michelle Pape <r'nipapei3mail.com> Sent: Monday, October 14, 2024 4:00 PM To: Maxwell Nader <mnader@weld.gov>; Latham@weld.gxov; erelsord@weld.gov; Mike Freeman <mfreernan@weld.gav>; Scott James <sjames@weld.gov>; Lori Saine <Isaine@weldgov> Subject: opposition to proposed weld county solar farm Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. 10/14/2024 Hello, Let me introduce myself, I am Michelle Miller. I am reaching out to you so you may better understand my opposition to the proposed solar farm to be developed on the Magnum Feedlot ground located one half mite west of my mother's property. Our family settled here over 100 years ago. We have fought hard over the years with our farm and ranch to provide a livelihood and to be good stewards of the land. It is heartbreaking to me to think of looking West of my property to see miles and mites of solar panels which was once grazing land for our cattle and prime agriculture for our crops. Not to forget the negative environmental impact that is associated with solar power. The loss of viable agricultural land, loss of habitat, loss of water, the effect of hazardous materials during manufacturing, and lack of responsible waste disposal for the units. The life cycle emissions for photovoltaic emissions are between 0.07 and 0.18 per KW hour. Most estimates for concentrating solar power range from 0.08 and 0.2 pounds of carbon dioxide. This sacrifice is not worth the reward. My mother wilt experience a huge financial loss because of decreased property value as it is located in close proximity to the solar panels. I greatly oppose this invasion of her home and the surrounding area. Thank you for your consideration. Best regards, Michelle Miller EXHIBIT izovu 0014 Hello