Loading...
HomeMy WebLinkAbout660276.tiffWEST GREELEY SOIL CONSERVATION P. O. Box 86 Greeley, Colorado To: F. A. Mark, State Conservationist SCS, Denver, Colorado *ELF CU COMM 4hcRS ORGELEY, COt.O.. REGE (rv_..i- DISTRICT ` UN3' 19:6 May 31, 1966 4 From: Arthur V. Briggs, President West Greeley Soil Conservation District Re: Watershed Protection (P.L. 566) — Annual Inspection of Works of Improvement — Coalbank Creels Watershed Project In accordance with 0 and M Agreements dated February 29, 1960, and May 18, 1960, this is to advise that representatives of the sponsors and myself conducted an inspection of the Coalbank Creels Watershed Project on this date. The following is the report of our inspection, recommendations and proposed action. FLOODWATER RETARDATION STRUCTURE CB -1 - (Completed June 26, 1962) 1. The fencing was found to be in order. That portion of the fence which crossed the main channel leading into the structure which was taken out during the flood of June, 1965, has been repaired by the sponsors and at this time is still in good condition. 2. The spillway, conduit, emergency spillway, and trashracks were inspected and found to be very satisfactory. There is no further evidence of deterioration of the main conduit which had been mentioned in previous reports. 3. The headwall on the outlet end of the conduit remains stable and is not in any jeopardy even though a well established scour hole has developed below the dam. 4. The vegetative seeding on the borrow area appears to be good. There is an excellent stand of blue grate on areas between the spreader ditches. The spreader ditches themselves are well established with brome grass, in the channel. 5. The seeding on the upstream face of the dam is fair to good, as is the emergency spillway. The grass seeding catch on the downstream Ar 6 7°f b 660276 F. A. Nett Page 2 Hay 31, 1966 face of the dam is poor, although there is indication of improve- ment aver last year. 6. The flood of last year caused several minor breaks in the spreader ditch system which had been established on the borrow area. Some erosion is occuring. During this inspection by the sponsors, each break was staked for identification in order that arrangements can be made with the co-sponsors to repair the damage. GRADE STABILIZATION DROP STRUCTURES - Completed: Numbers CB -2 and CB -3 Construction - September ID, 1962 Seeding & Fencing - April 29, 1963 1. There has been no change or deterioration in the condition of these 2 structures since they were built. 2. The vegetative cover on the dikes of these 2 structures is poor. However, there is evidence of establishment and it is hoped that suitable cover will be obtained. 3. The earthen weir section on CB -3 is well established with sod forming grasses. We are, however, continuing to have some minor encroachment on to the area granted by the easement by the farming operations of the landowner. Copies: Area - SCS Unit - SCS 'yield County Comaissioners C. E. Veden Dept. of Highways District file Hello