HomeMy WebLinkAbout20242315.tiffMEMORANDUM
TO: Esther Gesick, Clerk to the Board
FROM: Ryan Rose, Chief Information Officer
SUBJECT: B2400058 - Fiber Repair
BOCC Approval Date: September 18, 2024
September 4, 2024
Bids were received and opened on August 27, 2024, for B2400058 - Fiber Repair (IT -
1623 -Network Switches and Access Points). Two (2) bids with 2 options each were
received. Option 1, boring under the river, is the desired option with costs ranging from
$73,584.00 to $110,053.41. Attached is the bid tabulation for your information.
The Information Technology staff reviewed all bid responses. Allo Communications,
LLC out of Lincoln, NE proposed the lowest cost solution for option 1 of $73,584.00 and
meets the needed functionality documented in the bid process.
Based on the above information, I recommend the Board award B2400058 - Fiber
Repair to Allo Communications, LLC, for a total amount of $73,584.00.
O9 ( g
202--2315
i--OOt3
WELD COUNTY Dept. of Information Technology
PO Box 758 / 1401 North 17th Avenue, Greeley CO 80632
E-mail: AChuryk@weld.gov
Phone: (970) 400-2555
Fax: (970) 304-6572
DATE OF BID: August 27, 2024
REQUEST FOR: Fiber Repair
DEPARTMENT: INFORMATION TECHNOLOGY
BID NO: # B2400058
PROJECT: IT -1623 -Network Switches and Access Points
PRESENT DATE: September 4, 2024
APPROVAL DATE: September 18, 2024
Vendor Name
Total Bid Amount
Address
Allo Communications, LLC
330 S. 21. Street
Lincoln, NE 68510
Option 1 $ 73,584.00
Option 2 $ 54,099.00
Sturgeon Electric
12150 East 112th Ave
Henderson, CO 80640
Option 1 $ 110,053.41
Option 2 $ 83,317.80
** Bids are being reviewed at this time by dept.**