HomeMy WebLinkAbout20242223.tiffa
COLORADO
Department of Public
Health Et Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
August 16, 2024
To whom it may concern:
RECEIVED
AUG 16 2024
WELD COUNTY
COMMISSIONERS
On August 16, 2024, the Air Pollution Control Division will begin a 30 -day public notice
period for DCP Operating Company, LP - Platteville Natural Gas Processing Plant. A copy of
this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public notice period. Please reference the public notice for instructions on
submitting comments.
Enclosure
Vi_to
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
exj. t'7 L Cg -1 kl`L), 1+L 0)s LL--) 2024-2223
pto L� I CK I All 1)14155), D6LILt)
Air Pollution Control Division
Warranting Public Comment
Notice Of A Proposed Reopening of a Title V Operating Permit
Website Title: DCP Operating Company, LP - Platteville Natural Gas Processing Plant - Weld County
Notice Period Begins: August 16, 2024
NOTICE is hereby given that the Colorado Air Pollution Control Division, 4300 Cherry Creek Drive
South, Denver, Colorado 80246-1530 has initiated a reopening to modify an Operating Permit for
the following source of air pollution:
Applicant: DCP Operating Company, LP
6900 E. Layton Ave
Suite 900
Denver, CO 80237
Facility: Platteville Natural Gas Processing Plant
13675 Weld County Rd 34
Sec 8, T3N, R66W
Platteville, CO 80651
The Division has initiated a reopening of the Operating permit issued to DCP Operating Company,
LP for the Platteville Natural Gas Processing Plant in Weld County, CO. This facility is a natural gas
processing plant. The Division is reopening the permit to address the order issued by EPA in
response to Petition VIII -2023-14. The Division is proposing to add a requirement for a performance
test on the enclosed combustor for volatile organic compounds within 180 days of permit issuance,
and every five (5) years thereafter. There are no emission changes associated with this reopening.
A copy of the application, including supplemental information, the Division's analysis, and a draft
of the modified Operating Permit 02OPWE252 are available on the Division's website. Based on the
information submitted by the applicant, the Division has prepared the draft modified operating
COLORADO
2.02 1 I Hea 6 E a!� pro men,
permit for approval. Any interested person may contact the Division at
cdphe_apcd_title_v@state.co.us to obtain additional information. Any interested person may
submit written comments to the Division concerning 1) the sufficiency of the preliminary analysis,
2) whether the modified permit should be issued, 3) the ability of the proposed activity to comply
with applicable requirements, 4) the air quality impacts of, alternatives to, and control technology
required on the source or modification, and 5) any other appropriate air quality considerations.
Pursuant to Colorado Regulation No. 3, Part C, Section XIII.A.6, only those portions of the permit
for which there is cause to reopen are subject to Public Comment. Those portions of the permit
affected by the reopening are summarized in Appendix F of the permit. Any interested person may
submit a written request to the Division for a public comment hearing before the Colorado Air
Quality Control Commission (Commission) to receive comments regarding the concerns listed above
as well as the sufficiency of the preliminary analysis and whether the Division should issue the
modified permit. If requested, the hearing will be held before the Commission within 60 days of its
receipt of the request for a hearing unless a longer time period is agreed upon by the Division and
the applicant. The hearing request must: 1) identify the individual or group requesting the hearing,
2) state his or her address and phone number, and 3) state the reason(s) for the request, the
manner in which the person is affected by the proceedings, and an explanation of why the person's
interests are not already adequately represented. The Division will receive and consider the
written public comments and requests for any hearing for thirty calendar days after the date of this
Notice.
Comments may be submitted using the following options:
• Use this web form. This page also includes guidance for public participation
• Send an email to cdphe apcd airpermitcomments@state.co.us
• Send comments to our mailing address:
Title V Operating Permits Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 2 I a
COLORADO
Department ofPublle
Health 6 Environment
NOTE: Comments submitted to the Division will be uploaded to an online document repository and
will be accessible to the public. Your comments and the division's responses are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comments.
Hearing requests may be submitted to the email address or the mailing address noted above.
2.02
3I
COLORADO
Department of Pebble
Health ft Environment
Hello