HomeMy WebLinkAbout20241107.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 76 BETWEEN COUNTY ROADS 39 AND 41 FOR
APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 76, between County Roads 39 and 41, to through traffic and to
regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being
effective May 7, 2024, for approximately four (4) days for a culvert replacement.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 76, between County Roads 39 and 41,
be temporarily closed, with said closure being effective May 7, 2024, for approximately
four (4) days for a culvert replacement, and further, that standard official traffic control devices
shall be erected at said closure giving notice of the restrictions.
cc: SO (RS), A:SPa-1-cl,, CS?
05/14 /2y
2024-1107
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 76
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 6th day of May, A.D., 2024.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY,
ATTEST: dmitAmj �, •XltD;,
Weld County Clerk to the Board
BY:
APP
County At orney
Date of signature: O5/13
oss, Chair
Perry L. BucPro-Tem
Mike Freeman
cott K. James
Lori Saine
2024-1107
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: May 1, 2024
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close WCR 76 between WCR 39 and WCR 41
from 05/07/24 through 05/10/24 for a culvert replacement.
See attached closure diagram.
2024-1107
www.invanon.com
•
•
W20 -1F
'r 1
CC
I
•
W20 -1F •
r
i
•
W20 -1F
M4-9
aa- -a-ea- r•
[11....
noi3o
U'1 CR 74
M4-9
m
-4
0
M4-9
a a.•aa aaaat-a -s
W220 -1F
M
d
M
10
120-1F
4
•
•
i
i
a
4
1
1
a
a
-91
PROJECT
#LVR-19
ROAD CLOSURE DESCRIPTION
WCR
closed
for
Culvert
76
5/7/2024
between
Replacement
thru
WCR
5/10/2024
39 and
WCR
41
NOTICE TO PUBLIC
'Road
signs
and
barricaded
DETOUR ROUTE
WCR
WCR
WCR
39
74
41
be-ween
between
between
WCR
WCR
WCR
76
39
74
and
and
and
WCR
WCR
WCR
74
41
76
1
1
1
mile
mile
mile
paved
paved
gravel
NOTES:
ADT
Drainage:
New:
of
18"
WCR
Old:
CSPR
is:241/2022
18"
Round
C
M
P
Prepared
4/30/2024
by:
Ryan
Reynolds
Hello