Loading...
HomeMy WebLinkAbout20240511.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 February 27, 2024 To Whom it May Concern: RECEIVED FEB 2 7 2024 WELD COUNTY COMMISSIONERS On February 27, 2024, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Pharaoh 36 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive 5., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director TAb "-2J1Pbt.) (CZIM N)4 )-L_C1)5I LL). 314/ 2.4 Ce-14/bK I Dbl D► -t155), bGLJM) -z1z174 2024-0511 Air Pollution . Control Division, Notice of a Proposed Project or Activity Warranting Public cc.Comment Website Title: PDC Energy, Inc. w Pharaoh 36 Sec HZ - Weld County Notice Period Begins: February 27, 2024 Notice is hereby given that an -application for a proposed projector activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Pharaoh 36 Sec HZ Well Production Facility NESE quadrant of Section 36, Township 5N, Range 64W Weld County The proposed project or activity is as follows: The initial issuance for construction permits 22WE0431, 22WE0432, and 22WE0433 in which new synthetic minor,limits are being established in order to avoid major source requirements,at the Pharaoh 36 Sec HZ facility. Additionally, a revised modelling determination was conducted for the facility received on 02/07/2024 andwill be incorporated with the following permits. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, 'Part B, Section 1II.C due to thefollowing reason(s): • - the source is requesting a federally enforceable limit on the potential to emit in order toavoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0431 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to complywith the applicable standards and regulations of the - Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also. includes guidance for public participation Send an email to cdphe apcd airpermitcomments®state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil &t Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 • 2.02 aft,,,,,j COLORADO 1 I Department o} Public �ii�/ Health 6 Environment NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 I COLORADO Department o! Public Heakh 6 Envlr f,, Hello