HomeMy WebLinkAbout20240683.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 72 BETWEEN COUNTY ROADS 31 AND 33 FOR
APPROXIMATELY ONE (1) WEEK, FOR INSTALLATION OF 48 -INCH CASING PIPE
FOR NEW 30 -INCH WATER MAIN
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 72, between County Roads 31 and 33, to through traffic and to
regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being
effective March 25, 2024, for approximately one (1) week for the installation of a 48 -inch casing
pipe for a new 30 -inch water main.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 72, between County Roads 31 and 33,
be temporarily closed, with said closure being effective March 25, 2024, for approximately
one (1) week for the installation of a 48 -inch casing pipe for a new 30 -inch water main, and further,
that standard official traffic control devices shall be erected at said closure giving notice of the
restrictions.
cc•. SoCRS), D;SFc+cl., GSi'
oy /O3 /zN
2024-0683
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 72
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 20th day of March, A.D., 2024.
BOARD OF COUNTY COMMISSIONERS
WELD COUNT
ATTEST:
Weld County Clerk to the Board
BY fL OctAusick
Deputy Clerk to the Board
APP: eVED •RM:
County Attorney
Date of signature:
6)
Ross, Chair
Perry L. B , ck, Pro-Tem
3�
Mik � Freeman
2024-0683
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: March 18, 2024
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Connell Resources is requesting permission to close CR 72 between CR 31 and CR 33 beginning
03/25/2024 through 04/01/2024 for installation of a 48" casing pipe for a new 30" watermain for North
Weld County Water District.
See attached closure diagram.
2024-0683
3/2.0 EC -(002__
•J.q F.`F • i- -
Hello