Loading...
HomeMy WebLinkAbout20242873.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 October 28, 2024 To Whom It May Concern: RECEIVED OCT 2 8 2024 WELD COUNTY COMMISSIONERS On October 28, 2024, the Colorado Air Pollution Control Division will begin a 30 -day public comment period for Summit Oil Ft Gas - Castor 7-59-11. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director Le,.. lt- CDC -1 IZ I A Lk) } }-L C175) LL), pLo (C./44-1O41M' 41z5) Oil OR 5c..)10 I lv-f -RAW i l`�evi e- �� 14174 2024-2873 Air Pollution Control Division a. 47..7 Notice of a Proposed Construction Permit Warranting Public Comment Website Title: Summit Oil a Gas - Castor 7-59-11 - Weld County Notice Period Begins: October 28, 2024 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Summit Oil a Gas Facility: Castor 7-59-11 Well Production Facility SWSW quadrant of Section 11, Township 7N, Range 59W Weld County The proposed project or activity is as follows: The following construction permits 24WE0081-24WE0084 are establishing new synthetic minor limits for equipment that were previously covered under GP10 coverage at the Castor 7-59- 11 facility. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The division has made a preliminary determination of approval of the application. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Potts, Governor I Jilt Hunsaker Ryan, MPH, Executive Director A copy of the application, the division's analysis, and a draft of construction permit number 24WE0081 are available on the division website: Air Permit Public Notices The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: • Submit comments via web form: Form for Public Comment on Draft Permit • Submit comments via email: cdphe apcd_airpermitcomments@state.co.us • Submit comments via mail: Air Pollution Control Division - Oil It Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Potis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Hello