Loading...
HomeMy WebLinkAbout640138.tiffTLAUD$ A. NASH, ARCHITECT Date December 28, 1964 Project No. 1127 Amount (Plus-ifshansin Project Name Office Remodeling for the Weld Count Court House and Weld County Services Building To: Manion -Cropper Construction Company Contractor) for general, including/ wort- in connection with above project, mechanical & electrical For County Commissioners, Weld County , Owner. Your proposal for making the following changes has been accepted: (Following changes are for Services Building, unless otherwise noted) 1. Provide and install a 3/4" exterior plywood cover plate over "B.P.O.E." on Services Building with beveled edges and three coats of enamel to match adjacent surface. Add - S 30.00 2. Provide and install one (1) 1 3/4" solid core flush wood door at Boildr Room entrance from hallway in Services Building. Reuse existing butts. Provide and install new 8037 lockset MK to existing and 50 Series Sargent fusible link arm closer. Finish door and frame as shown for doors in original contract. 3. Convert doors M to Blue Cross 211 to "Dutch" doors. Add z pr. Add - 100.OD butts per door to match specified and add one (1) surface bolt. - -Add - 60.00 4. In County Superintendent's Office 202 provide and install three (3) new Type L pendant mounted fixtures including painted Wire - mold connections. Also provide and install three (3) duplex floor outlets, Wiremold service from floor below in locations as directed by the Architect. Provide and install two (2) additional floor outlets near south partition in Appraisal 310. - -Add - 310.00 5. Paint all surfaces in Vault Room 203 in accordance with re- quirements of original specifications. Patch and paint all presently painted surfaces in Toilet 206. 6. Install new storage area with doors and floor and ceiling Add - 151.00 over exterior to Vestibule 104 (Court House). _Refinish as necessary to match exis ing. 7. Omit removal of existing floor tile and installation of new Add - 40.00 floor tile in Judges Chambers 207 and 210 (Court House). Do not omit rubber base at new partitions. Confirm color for base with Owner. Deduct - 125.07 The amount of the contract shall be (;.ncreased)(du ) in the sam of: Five Hundred Sixty Six with ( 4 00/100011ars ($ 566.00 - - - - ) n da�rs"'aee'�S (no change) ) in the contract time. The adjusted contract price CHANGE ORDER NO. 2 566.00 CLAUDE A. NASA, /0711117ECT By \/_as dam';( 1' h OeHu 00%100 - Dollars $ ) 117,296.00 Owner e d Count Col By nnfan _ Thanca 4. Two- Hundred- N nett Contract Manion-Cr2pper Cohstruc on By /n 9.�S. CLAUDE A. NASH JAMES E. MILLENSIFER A.I.A. ARCHITECT ASSOCIATE 1009 SOUTH PEARL STREET • DENVER, COLORADO 00210 • TELEPHONE 799.0291 December 28, 1961, Board of County Commissioners Weld County Court House Greeley, Colorado Re: Offices Remodeling for the Weld County Services Building Gentlemen: In my inspection of the Services Building today I observed some possible structural damage to the stairs caused by the movers. While my sere ces have mot been involved with any structural design or changes on the stairs I believe you should be advised of the possibility of damage. The damage, if any, cannot be assessed without removing the stair soffits for inspec- tion. Solely as a precaution I have instructed Manion -Cropper to install temporary shoring under the stairs pending a decision by you of whether you desire us to undertake further investigation. Our advice that moving be accomplished by lifting objects to the third floor balcony by an outside lift and then moved through the building over planking to the assigned locations was not followed. The stairs have carried much greater than normal loads of people from the third floor assembly room when it was used for the Elks meetings and are, in my opinion, more than capable of serving the new needs providing structural damage has not been caused by over -loading with equipment. In addition, severe'damage has been caused by the movers to the new metal nosing trim and stair covering that were installed by Manion -Cropper. It is my recommendation that the nosinps and portions of the flooring be re- placed. Please advise me of any further action you want me to take on the stairs. Very truly yours, CLAUDE A. NASH, ARCHITECT Claude A. Nash, A. I. A. cc: Manion-Cropper.Construction Co. MEMBER AMERICAN INSTITUTEOF ARCHITECTS ARC; I SECT I'5 Jos No. 1127 �' , L DECEMBER 4, 1964 I CERTIFICATE No. 2 To: COUNTY COMMISSIONERS, WELD COUNTY, COLORADO THIS IS TO CERTIFY THAT IN ACCORDANCE WITH YOUR CONTRACT DATED OCTOBER 2, 1961+ THAT MANION•'CROPPER CONSTRUCTION Co., GENERAL CONTRACTOR FOR OFFICES REMODELING FOR THE WELD COUNTY COURT HOUSE AND WELD COUNTY SERVICES BUILDING AT GREELEY, COLORADO IS ENTITLED TO THE SECOND PAYMENT FOR THE PERIOD NOVEMBER ►, 1964 THROUGH NOVEMBER 30. 1964 IN THE AMOUNT OF THIRTY FIVE THOUSAND SIX DOLLARS ($ 35,610.00 HUNDRED TEN AND NO/100 THE PRESENT STATUS OF THE ACCOUNT FOR THE ABOVE CONTRACT IS AS FOLLOWS; CHANGE ORDERS No . No. _ No. No. Na. No. .�“ NFS ADDITIONS DEDUCTIONS 992.001' 932.001 INi IS .!0 CERYIr( ImAT ALL S'•iLLS ARE PQ OR WH PCH PREv?DNS C i1TIFIC?.-as FOR PAYW NT 'kYENE ISS4'LIn, ►&N ION -CROPPER CON57RUC7 ION DATE ajy_ :zfZ ;. 7• ORIGINAL CONTRACT SUM $115,733.00 i TOTAL ADDITIONS $ 992.00 Sot TOTAL $1111 ,730.00 TOTAL DEtNod:c`u' IONS $ TOTAL AMOIJ I OF CONTRACT TO DATE $116,730.00 WOR;; STILL TO FINISH (n us DATE) $ 62.5 0.00 f.DDJE CONTRACTOR, TO $ 54,160.00 Less RE7A.IIInG2 Ito%. $—....52U6.00 TOTAL TO BE DRAWN $__ ,L4.00 'VRTIF;CATFS PREVIOUSLY ISSUED $.16,695.00 THIS CERTIF/CATE $_3.2A0 THIS CERTIFICATE IS B'SCO? ON TIU ESTIMATED AMOUK T OF WORM COi4PLETED IN THE PERIOD COVERED AWN ANY RE - TA NAGE SI{OIf i CS ! I DUC TG1) THEREFROM, Tilts CERTIFICATE RS NOT NEGOTIABLE, IT IS PAYABLE ONLY TO SHE PAYEE NAMED HEREIN 2ND ITS ISSUANCE, PAY- MENT AND ACCEPTANCE ARE WITHOUT .PRE^ JUDICE 70 ANT RiGHTS OF THE OWNER OR CONTRACTOR UNDER 'T mT.IR CONTRACT, CLAUDE A. NASH, ARCHITECT BY Hello