Loading...
HomeMy WebLinkAbout20243318.tiffaNt., COLORADO Department of Public Health Et Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 December 11, 2024 To Whom It May Concern: RECEIVED DEC 11 2024 WELD COUNTY COMMISSIONERS On December 11, 2024, the Colorado Air Pollution Control Division will begin a 30 -day public comment period for PDC Energy, Inc. - Volt 5 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public comment period. Please reference the public notice for instructions on submitting comments. of cot\ do, 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdohe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director X876 T , 1 i L��l1 Lit.) (71l B (2L( T L (cam (c .(tb(1)N-(s13), I5 1 Z4 IZ 124 2024-3318 Air Pollution Control Division Notice of a Proposed Construction Permit Warranting Public Comment Website Title: PDC Energy, Inc. - Volt 5 Sec HZ - Weld County Notice Period Begins: December 11, 2024 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Volt 5 Sec HZ Well Production Facility SWSW Quadrant of Section 5, Township 5 N, Range 66W Weld County The proposed project or activity is as follows: Initial construction permit request for condensate tank (permit 23WEOO28), condensate liquid loadout (permit 23WEOO29), and produced water tank (permit 23WEOO3O), which are all currently permitted under a GP1O. The division has determined that this permitting action is subject to public comment requirements under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The division has made a preliminary determination of approval of the application. s 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.Qov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director A copy of the application, the division's analysis, and a draft of construction permit numbers 23WE0028, 23WE0029, and 23WE0030 are available on the division website: Air Permit Public Notices The division hereby solicits submission of public comments from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the commission. The division will receive and consider written public comments for thirty (30) calendar days after the date of this notice. Comments may be submitted using the following options: • Submit comments via web form: Form for Public Comment on Draft Permit • Submit comments via email: cdphe apcd airpermitcomments@state.co.us • Submit comments via mail: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, CO 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comment(s) and the division's response(s) are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comment(s). 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdohe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Hello