Loading...
HomeMy WebLinkAbout20242569.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 44 BETWEEN COUNTY ROADS 51 AND 53 FOR APPROXIMATELY FOUR AND A HALF (4.5) MONTHS, FOR BRIDGE REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 44, between County Roads 51 and 53, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective October 14, 2024, for approximately four and a half (4.5) months for the Bridge 44/51A replacement. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 44, between County Roads 51 and 53, be temporarily closed, with said closure being effective October 14, 2024, for approximately four and a half (4.5) months for the Bridge 44/51A replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC: so (Rs), D:Spa.-C1�, CS? I0/3/24 2024-2569 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 44 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 30th day of September, A.D., 2024. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: „,) ‘.4)%10;,,,k. Weld County Clerk to the Board BY: n/1 . L0OA tk Deputy Clerk to the Board APPOVED AS TO FORM: 14 —1/ AIV.,_d_di e?, County Attorney I , I Date of signature: l0 13I Z4� EXCUSED Kevjo-B, Ross, Chair /f Perry L. Bk, Pro-Tem ike Fr eman ri Saine 2024-2569 EG0024 MEMORANDUM TO: Clerk to the Board DATE: September 24, 2024 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close WCR 44 between WCR 51 and WCR 53 from 10/14/24 through 2/28/25 for a bridge replacement. See attached closure diagram. 2024-2569 q /30 GG 0ON www.invarion.com q 1 a a • W20 -1F I I 1 I i 1 1 1 34 )1 W20 -1R r 0 al • O M4-9 ♦ -wee • • • 1 ifi • M4-9 M4-lu W20t3 a 1 i W20 -1F i i 4 ''CR46 " y e is . ► s SO 4 -411`0416 M4-9 • W20 -1F M4-10 Li t V • M4-9 W20 -1F W20-3 amml20-1F PROJECT BR 44/51A # AN -64 ROAD CLOSURE DESCRIPTION WCR CLOSED for Bridge 44 between 10/14/24 Replacement WCR thru 51 2/28/2025 and WCR 53 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE WCR WCR WCR 51 46 53 between between between WCR WCR WCR 44 51 46 and and and WCR WCR WCR 46 53 44 1 1 1 mile mile mile gravel gravel paved NOTES ADT Bridge: Bridge of is WCR Bridge 950' is: 1520/2023 Replacement: West of WCR 51 Frico on Ditch WCR 53 Prepared 9/24/2024 by: Ryan Reynolds Hello