HomeMy WebLinkAbout20242569.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 44 BETWEEN COUNTY ROADS 51 AND 53 FOR
APPROXIMATELY FOUR AND A HALF (4.5) MONTHS, FOR BRIDGE REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 44, between County Roads 51 and 53, to through traffic and to
regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being
effective October 14, 2024, for approximately four and a half (4.5) months for the Bridge 44/51A
replacement.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 44, between County Roads 51 and 53,
be temporarily closed, with said closure being effective October 14, 2024, for approximately
four and a half (4.5) months for the Bridge 44/51A replacement, and further, that standard official
traffic control devices shall be erected at said closure giving notice of the restrictions.
CC: so (Rs), D:Spa.-C1�, CS?
I0/3/24
2024-2569
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 44
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 30th day of September, A.D., 2024.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: „,) ‘.4)%10;,,,k.
Weld County Clerk to the Board
BY: n/1 . L0OA tk
Deputy Clerk to the Board
APPOVED AS TO FORM:
14 —1/ AIV.,_d_di
e?, County Attorney I , I
Date of signature: l0 13I Z4�
EXCUSED
Kevjo-B, Ross, Chair /f
Perry L. Bk, Pro-Tem
ike Fr eman
ri Saine
2024-2569
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: September 24, 2024
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close WCR 44 between WCR 51 and WCR 53
from 10/14/24 through 2/28/25 for a bridge replacement.
See attached closure diagram.
2024-2569
q /30 GG 0ON
www.invarion.com
q
1
a
a
•
W20 -1F
I
I
1
I
i
1
1
1
34
)1
W20 -1R
r
0
al
• O
M4-9
♦ -wee • • • 1 ifi
•
M4-9
M4-lu
W20t3
a
1
i W20 -1F
i
i
4
''CR46
" y e is . ► s
SO 4 -411`0416
M4-9
•
W20 -1F
M4-10
Li
t
V
•
M4-9
W20 -1F
W20-3
amml20-1F
PROJECT
BR
44/51A
# AN
-64
ROAD CLOSURE DESCRIPTION
WCR
CLOSED
for
Bridge
44
between
10/14/24
Replacement
WCR
thru
51
2/28/2025
and
WCR
53
NOTICE TO PUBLIC
Road
Message
signs
and
boards
barricaded
to
be
used
DETOUR ROUTE
WCR
WCR
WCR
51
46
53
between
between
between
WCR
WCR
WCR
44
51
46
and
and
and
WCR
WCR
WCR
46
53
44
1
1
1
mile
mile
mile
gravel
gravel
paved
NOTES
ADT
Bridge:
Bridge
of
is
WCR
Bridge
950'
is:
1520/2023
Replacement:
West
of
WCR
51
Frico
on
Ditch
WCR
53
Prepared
9/24/2024
by:
Ryan
Reynolds
Hello