On March 8, 2024, the Air Pollution Control Division will begin a 30 -day public notice period for
Bonanza Creek Energy Operating Company, LLC - Pronghorn D-9 Production Facility. A copy of this
public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, Co 80246-1530 P 303-692-2000 www.cotorado.gov/cdphe
?LARD 1 V Jared Potts, Governor I Jill Hunsaker Ryan, MPH, Executive Director
'• FL I pai) 1-1-1._ LDS/ U_,
3! 13 I 7...4 ?w LC I c l< n J D 14I s rte) D (C,U #)
51.13 I zt+
2024-0623
g M„M,M Air Pollution Control Division
444 1.Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Bonanza Creek Energy Operating Company, LLC - Pronghorn D-9 Production Facility - Weld
County
Notice Period Begins: March 8, 2024
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Bonanza Creek Energy Operating Company, LLC
Facility: Pronghorn D-9 Production Facility
Well Production Facility
SWSW quadrant of Section 9, Township 5N, Range 61W
Weld County
The proposed project or activity is as follows: The following project consists of permit 14WE1822.CP6
where a decrease in annual throughput is being requested and in which new synthetic minor limits are being
established for the facility.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 14WE1822 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil a Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
1 SC
COLORADO
Department of Pt�lie
Health 67::Z meat
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
COLORADO
DepartmentotPubllc
Health 6 Environment
Hello