HomeMy WebLinkAbout20242618.tiff•
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
October 1, 2024
To Whom It May Concern:
RECEIVED
OCT 01 2024
WELD COUNTY
COMMISSIONERS
On October 1, 2024, the Colorado Air Pollution Control Division will begin a 30 -day public
comment period for PDC Energy, Inc. - Crawford 33 Sec HZ. A copy of this public notice is
enclosed.
Thank you for assisting the division by posting a copy of this notice in your office. A public
copy of this notice is required by Colorado Air Quality Control Commission regulations. The
notice must be available for public inspection for a period of thirty (30) days from the
beginning of the public comment period. Please reference the public notice for instructions
on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.Qov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
u6 -111L V;LW
►0f11z9
ex'. t?L t&1 i w4), ) L (75/LL), 2024-2618
-'w LCA4 IcA41 DT)I PM/513),DCs PM)
lo�i17}4
Air Pollution Control Division
4�MlM�M
''0 Notice Of A Proposed Title V Operating Permit Warranting Public ,tigr, Comment
Website Title: PDC Energy, Inc. - Crawford 33 Sec HZ - Weld County
Notice Period Begins: October 1, 2024
Notice is hereby given that an application for a proposed project or activity has been submitted to
the Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Crawford 33 Sec HZ
Well Production Facility
SWSW quadrant of Section 33, Township 4N, Range 65W
Weld County
The proposed project or activity is as follows:
Applicant proposes a modification to update site -specific emission factors based on recent
site sampling for the condensate storage tank and to request new permit limits. Additionally, the
requested condensate throughput is decreasing.
The division has determined that this permitting action is subject to public comment requirements
under Colorado Air Quality Control Commission Regulation Number 3, Part B, Section III.C due to
the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to
avoid other requirements
The division has made a preliminary determination of approval of the application.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdohe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
A copy of the application, the division's analysis, and a draft of construction permit number
21WE0536 are available on the division website: Air Permit Public Notices
The division hereby solicits submission of public comments from any interested person concerning
the ability of the proposed project or activity to comply with the applicable standards and
regulations of the commission. The division will receive and consider written public comments for
thirty (30) calendar days after the date of this notice. Comments may be submitted using the
following options:
• Submit comments via web form: Form for Public Comment on Draft Permit
• Submit comments via email: cdphe_apcd airpermitcomments@state.co.us
• Submit comments via mail:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, CO 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and
will be accessible to the public. Your comment(s) and the division's response(s) are not considered
confidential and will be publicly accessible, including your name and any other personal
information you provide in your comment(s).
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
Hello