HomeMy WebLinkAbout20240884.tiffCOLORADO
Department of Public
Health Et Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
April 15, 2024
To Whom it May Concern:
RECEIVED
APR 15 2024
WELD COUNTY
COMMISSIONERS
On April 15, 2024, the Air Pollution Control Division will begin a 30 -day public notice period for PDC
Energy, Inc. - Ridgway 1 Sec HZ. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Pubis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
1l1zylz4 TwLem c-KIaDlI5B)bCO sit)
gM.74, Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
44-40
Comment
Website Title: PDC Energy, Inc. - Ridgway 1 Sec HZ - Weld County
Notice Period Begins: April 15, 2024
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Ridgway 1 Sec HZ
Well Production Facility
NWNW quadrant of Section 1, Township 3N, Range 66W
Weld County
The proposed project or activity is as follows: The operator requested the initial construction permits for
condensate and produced water storage tanks, and condensate loadout, which are also permitted under
General Permit 10 coverage. Permits 23WE0504, 23WE0505, and 23WE0506 will cover the condensate
storage tanks, condensate loadout, and produced water storage tanks. This project includes general permit
02 (GP02) for two (2) compression engines. This facility will be considered a new synthetic minor source of
NOx and VOCs by NANSR through this project.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 23WE0504 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
11*
COLORADO
Department of Publle
Health 6 Environment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02 2 la
COLORADO
Department of Publie
Health 6 Environment
Hello