Loading...
HomeMy WebLinkAbout20242144.tiffPlanner: Case Number: Applicants: Representative: Request: Site Address: Legal Description: Location: LAND USE APPLICATION SUMMARY SHEET Diana Aungst USR24-0011 Samuel and Laura Gavito 11192 County Road 23, Fort Lupton, CO 80621 AGPROfessionals c/o Hannah Dutrow 3050 67th Avenue, Greeley, CO 80634 Hearing Date: August 6, 2024 A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service (truck parking) outside of subdivisions and historic townsites in the A (Agricultural) Zone District. 11192 County Road 23, Fort Lupton, CO 80621 Lot A of Recorded Exemption RE -4146; being a part of the SW4 of Section 1, Township 2 North, Range 67 West of the 6th P.M., Weld County, CO East of and adjacent to County Road 23 and approximately 0.63 miles north of County Road 22.5 Size of Parcel: +/- 7.15 acres Parcel No. 1311-01-3-00-001 The criteria for review of this Special Review Permit are listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: Fort Lupton Fire Department, referral dated May 23, 2024 Weld County Oil and Gas Energy Department, referral dated April 30, 2024 Weld County Department of Public Health and Environment, referral dated May 21, 2024 Weld County Department of Planning Services — Code Compliance, referral dated May 21, 2024 Weld County Department of Planning Services — Development Review, referral dated May 22, 2024 The Department of Planning Services' staff has received referral responses without comments from the following agencies: Town of Firestone, referral dated May 3, 2024 Town of Platteville, referral dated May 2, 2024 City of Fort Lupton, referral dated May 22, 2024 Colorado Parks and Wildlife, referral dated May 7, 2024 Weld County Sheriff's Office, referral dated May 7, 2024 Weld County School District RE -8, referral dated May 8, 2024 Central Weld County Water District, referral dated May 24, 2024 State of Colorado, Division of Water Resources, referral dated May 14, 2024 The Department of Planning Services' staff has not received responses from the following agencies: y Platte Valley Conservation District USR24-0011 I Gavito Page 1 of 9 Case Summary: The applicants, Samuel and Laura Gavito, are requesting a Use by Special Review for truck parking for up to nine (9) semi -trucks and nine (9) trailers for their business known as Gavito Trucking. Gavito Trucking hauls equipment and materials to oil and gas sites. There will be up to nine (9) employees. There are currently three (3) employees who pick up their trucks and leave for off -site operations. Hours of operation are proposed to be 5:00 a.m. and 7:00 p.m., Monday through Sunday (7 -days a week). The parking of the trucks and storage of any related equipment will occur 24/7. There is an existing 2,900 SF residence, 1,200 SF livestock shelter, and a 3,500 SF hay shed. No additional structures are proposed to be utilized with this USR. The property is below the grade of the road but the because the trucks are parked approximately 1,000 feet east of County Road 23 along the north and west side of the hay storage building, no screening or landscaping is requested by staff. This case is an active Zoning Violation (CCV23-00226) which was initiated due to the presence of a trucking business on the property without first completing the necessary Weld County Zoning Permits. If this application is approved, all conditions of approval completed, and the final (USR) map is recorded, the Code Violation (CCV23-00226) will then be closed. If this application is denied then all but one (1) Commercial Vehicle, as allowed as an Accessory Use in the Agricultural Zone District, shall be removed from the property within thirty (30) days of the denial, otherwise, this case will be forward to the County Attorney's Office for legal action. DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 [Weld County Comprehensive Plan] and any other applicable code provisions or ordinance in effect. Section 22-2-30.A.1. states: "Land use changes should not inhibit agricultural production nor operations." The subject property has historically been used for residential purposes. The location of the parking area and the existing buildings on the approximate seven (7) acre parcel limits the amount of land that can be devoted to agricultural uses; however, the business does support agriculture in the County. Colorado Parks and Wildlife stated that this site is project is on the edge of the 1/2 -mile buffer for a Bald Eagles nest and within Mule deer severe winter range and recommends starting construction outside of the Mule deer winter season (December 1 - April 30). No construction is proposed with this USR. Section 22-2-30. C. states: "Harmonize development with surrounding land uses." The parcel is small, about seven (7) acres, but the nearest residence is approximately 650 feet south of the site. The semi -truck parking is set back from County Road 23 and is partially screened by the existing buildings. The noise and dust generated by the trucks will be minimal as there are only nine (9) trucks. B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A (Agricultural) Zone District. Section 23-3-10. -- Intent, of the Weld County Code states, "Agriculture in the County is USR24-0011 I Gavito Page 2of9 considered a valuable resource which must be protected from adverse impacts resulting from uncontrolled and undirected business, industrial and residential land uses. The A (Agricultural) Zone District is established to maintain and promote agriculture as an essential feature of the County. The A (Agricultural) Zone District is intended to provide areas for the conduct of agricultural activities and activities related to agriculture and agricultural production, and for areas for natural resource extraction and energy development, without the interference of other, incompatible land uses." Section 23-3-40.V. Uses by Special Review, of the Weld County Code allows for a "Oil and Gas Support and Service" in Lots outside of a subdivision and historic townsite in the (A) Agricultural Zone District. Section 23-1-90. states that Oil and Gas Support & Service includes trucking companies principally engaged in the hauling of drilling rigs, oil and gas, pipe for use in drilling, water, etc. This code section allows the applicant to apply for the oil and gas truck parking. C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The adjacent properties are zoned A (Agricultural) and the land uses include pastures, crops and rural residences. There are four (4) USRs within one mile of the site. USR-1391 for a retail shop that sells trees, shrubs, decor, and jewelry, USR-1639 for a directional drilling company, USR14-0042 for a 20 - inch high-pressure natural-gas pipeline, USR13-0035 for a greater than 10 -inch natural-gas pipeline, and USR17-0072 for a gravel mine. The Weld County Department of Planning Services sent notice to six (6) surrounding property owners within five hundred (500) feet of the subject property. Three letters were received, one (1) in support of the USR and two (2) with questions/concerns about the request. The application materials did include a letter of support from a nearby neighbor. The concerns outlined in one (1) of the letters generally pertain to the sixteen (16) -foot easement, utilized for access by the applicant and the property owner to the east; including concerns about damage to an irrigation pipeline and the option for reimbursement if the irrigation pipe were to be damage and encroachment and/or obstruction of the easement. The three (3) surrounding property owner letters were sent to the authorized agent on May 29, 2024 and a response email, dated July 23, 2024, was submitted that stated the easement if a civil matter to be addressed between the two (2) individual property owners and answer the specific questions concerning the operations of the business. The proposed use is in an area that can support this development and the Development Standards and the Conditions of Approval will assist in mitigating the impacts of the facility on the adjacent properties and ensure compatibility with surrounding land uses and the region. D. Section 23-2-220.A.4 -- That the uses which would be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of this Code or master plans of affected municipalities. The site is located within the Coordinated Planning Agreement Area (CPA) for the City of Fort Lupton and the Towns of Firestone and Mead. As part of the pre -application process the municipalities were sent a Notice of Inquiry (NOI). The City of Fort Lupton submitted a Notice of Inquiry dated March 28, 2024, that states, "The site is located on the Platteville side of our [Platteville and Fort Lupton] IGA but is in our [Fort Lupton] Planning Area. We [Fort Lupton] are not interested in annexation at this time but will review and comment on any future submittals." The Town of Firestone submitted a Notice of Inquiry dated February 29, 2024, that states. "Per existing IGAs with Ft. Lupton and Platteville, Firestone will not annex east of CR 19." The Town of Mead's NOI stated that they are not interested in annexation. USR24-0011 I Gavito Page 3 of 9 The site is located within the Urban Growth Boundary and the Three Mile Area Boundary for the Town of Platteville, the Town of Firestone and the City of Fort Lupton. The land use classification on Platteville's Three Mile Area Plan, dated December 2021, is Agricultural Holding which, according to the 2017 Town of Platteville's Comprehensive Plan, "...is intended to encourage the sustainability of the regional agricultural and energy economy, discourage leapfrog development and ensure that land develops in a systematic and cost-conscious manner." The site is depicted on the Town of Firestone's Master Plan Map with a land designation of Mixed Use which, according to the 2013 Town of Firestone Master Plan, "...provide urbanized areas that can provide a live, work and shop style environment. Mixed Use areas and some limited commercial use areas have been identified along major arterials which are expected to carry increasing volumes of traffic over the years." Additionally, the land use depiction on the City of Fort Lupton's 2020 Future Land Use Map, is Mineral Zone. The Fort Lupton Comprehensive Plan, adopted in 2018, states that Mineral Zones are "...along the South Platte River which include significant mineral resources." The site is not located within the Urban Growth Boundaries of the Town of Mead. The site is also located within the three (3) mile referral areas of the Towns of Platteville and Firestone as well as the City of Fort Lupton. These municipalities submitted referral agency comments dated May 2, 2024, May 2, 2024, and May 22, 2024 respectively stating that they have no comments. E. Section 23-2-220.A.5 -- That the application complies with Articles V and XI of this Chapter if the proposal is located within an overlay zoning district or a special flood hazard area identified by maps officially adopted by the county. The property is not located within any overlay district officially adopted by the County, including A -P (Airport) Overlay District, 1-25 Overlay District, Geologic Hazard Overlay District, MS4 - Municipal Separate Storm Sewer System area, Special Flood Hazard Area, Historic Townsites Overlay District, or Agricultural Heritage Overlay District. Building Permits issued on the lot will be required to adhere to the fee structure of the County - Wide Road Impact Fee, County Facility Fee and Drainage Impact Fee Programs. F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The Natural Resources Conservation Services (MRCS) Soil Survey indicates that 63% of the site consists of low -slope (0-3%) Ellicott-Ellicot sandy -skeletal complex classified as "Prime farmland if irrigated", about 33% of the site consists of moderately steep slope Ustic Torriorthents which is classified as "Not Prime Farmland", and another 3% of the site consists of (0-3%) Altvan loam which is classified as "Prime Farmland if Irrigated". No Prime Farmland will be removed from production. G. Section 23-2-220.A.7 — There is adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and County. The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This proposal has been reviewed by the appropriate referral agencies and it has been determined that the attached conditions of approval and development standards ensure that there are adequate provisions for the protection of the health, safety and welfare of the USR24-0011 I Gavito Page 4 of 9 inhabitants of the neighborhood and county and will address and mitigate impacts on the surrounding area with the operation of this facility. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to recording the map: A. The applicant shall address the referral comments of the Fort Lupton Fire Department, as stated in the referral response dated May 23, 2024. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) B. The applicant shall acknowledge the advisory referral comments of the Weld County Oil and Gas Energy Department, as stated in the referral response dated April 30, 2024. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) C. A Road Maintenance Agreement is required at this location. Road maintenance includes, but is not limited to, dust control and damage repair to specified haul routes during construction. (Development Review) D. The map shall be amended to delineate the following: 1. All sheets of the map shall be labeled USR24-0011 (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The map shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 4. The map shall delineate the existing landscaping and/or screening. (Department of Planning Services) 5. The map shall delineate the parking area for the trucks. (Department of Planning Services) 6. The applicant shall delineate on the map the trash collection areas. Section 23-2-240.A.13 of the Weld County Code addresses the issue of trash collection areas. (Department of Planning Services) 7. All signs shall be shown on the map and shall adhere to Chapter 23, Article IV, Division 2 of the Weld County Code, if applicable. (Department of Planning Services) 8. County Road 23 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a collector road, which requires 80 feet of right-of-way at full buildout. The applicant shall delineate and label on the USR map the future and existing right -of- way (along with the documents creating the existing right-of- way) and the physical location of the road. If the existing right-of-way cannot be verified it shall be dedicated. The applicant shall also delineate the physical location of the roadway. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. (Development Review) 9. Show and label an access point, onto CR 23, that meets Weld County Code. Include the access usage type (i.e. Oil and Gas), the appropriate width, and the appropriate radii. The access point will be reviewed as part of the USR map submittal. (Development Review) 10. Show and label the approved tracking control on the site plan. (Development Review) USR24-0011 I Gavito Page 5 of 9 11. Show and label the drainage flow arrows. (Development Review) 2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) electronic copy (.pdf) of the map for preliminary approval to the Weld County Department of Planning Services. Upon approval of the map the applicant shall submit a USR map along with all other documentation required as Conditions of Approval. The USR map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The map shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The USR map and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. In accordance with Appendix 5-J of the Weld County Code, should the map not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional 3 -month period. (Department of Planning Services) 4. The Use by Special Review Permit is not perfected until the Conditions of Approval are completed and the map is recorded. Activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement. (Department of Planning Services) USR24-0011 I Gavito Page 6 of 9 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Samuel and Laura Gavito USR24-0011 1. A Site Specific Development Plan and Use by Special Review Permit, USR24-0011, for Oil and Gas Support and Service (truck parking) outside of subdivisions and historic townsites in the A (Agricultural) Zone District, subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) 4. The hours of operation are 5:00 a.m. - 7:00 p.m. Monday through Sunday (7 -days a week). The semi - trucks will be parked on -site 24 hours a day and the equipment will be stored on the site 24 hours a day. (Department of Planning Services) 5. The number of employees shall be up to nine (9) as stated in the application materials. (Department of Planning Services) 6. The number of on -site commercial vehicles shall be no more than nine (9), as stated in the application materials. (Department of Planning Services) 7. No vehicle repair, washing, or service shall occur on site. (Department of Planning Services) 8. No derelict vehicles, as defined in Section 23-1-90 of the Weld County code, shall be stored on the site. (Department of Planning Services) 9. The parking area on the site shall be maintained. (Department of Planning Services) 10. The existing landscaping/screening on the site shall be maintained. (Department of Planning Services) 11. All signs shall adhere to Chapter 23, Article IV, Division 2 of the Weld County Code, if applicable. (Department of Planning Services) 12. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 13. The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. (Development Review) 14. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Development Review) 15. The Property Owner shall comply with all requirements provided in the executed Road Maintenance Agreement. (Development Review) 16. The Road Maintenance Agreement for this site may be reviewed on an annual basis, including a site visit and possible updates. (Development Review) 17. The historical flow patterns and runoff amounts on the site will be maintained. (Development Review) 18. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20- 100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) USR24-0011 I Gavito Page 7 of 9 19. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment) 20. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall operate in accordance with Chapter 14, Article 1 of the Weld County Code. (Department of Public Health and Environment) 21. Fugitive dust should attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations. (Department of Public Health and Environment) 22. Any On -site Wastewater Treatment system located on the property must comply with all provisions of the Weld County Code, pertaining to On -site Wastewater Treatment Systems. (Department of Public Health and Environment) 23. A permanent, adequate water supply shall be provided for drinking and sanitary purposes, if required for business use. (Department of Public Health and Environment) 24. For employees or patrons on site for less than 2 consecutive hours a day, and 2 or less full-time employees on site, portable toilets and bottled water are acceptable. Records of maintenance and proper disposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County, contain hand sanitizers and be screened from existing adjacent residential properties and public rights -of -way. (Department of Public Health and Environment) 25. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 26. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan. Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. No colored lights may be used which may be confused with, or construed as, traffic control devices. (Department of Planning Services) 27. Building permits may be required for any new construction, set up of manufactured structures, or change of use of existing buildings per Section 29-3-10 of the Weld County Code. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2018 International Building Codes, 2018 International Energy Code, 2023 National Electrical Code, and Chapter 29 of the Weld County Code. A Building Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A Geotechnical Engineering Report, performed by a Colorado registered engineer, shall be required or an Open Hole Inspection. A building permit must be issued prior to the start of construction. (Department of Building Inspection) 28. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Facility Fee, County -Wide Road Impact Fee, and Drainage Impact Fee Programs. (Department of Planning Services) 29. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. (Department of Planning Services) 30. All buildings shall comply with the setback from oil and gas wells per Section 23-4-700, as amended. (Department of Planning Services) 31. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in USR24-0011 I Gavito Page 8 of 9 order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 32. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 33. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 34. Construction or use pursuant to approval of a Use by Special Review Permit shall be commenced within three (3) years from the date of Board of County Commissioners signed Resolution, unless otherwise specified by the Board of County Commissioners when issuing the original Permit, or the Permit shall be vacated. 35. This Use by Special Review shall terminate when the use is discontinued for a period of three (3) consecutive years, the use of the land changes or the time period established by the Board of County Commissioners through the approval process expires. The landowner may notify the Department of Planning Services of a termination of the use, or Planning Services staff may observe that the use has been terminated. When either the Department of Planning Services is notified by the landowner, or when the Department of Planning Services observes that the use may have been terminated, the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit. 36. In such cases where the Use by Special Review has terminated but the landowner does not agree to request to vacate the Use by Special Review Permit, a hearing shall be scheduled with the Board of County Commissioners to provide the landowner an opportunity to request that the Use by Special Review Permit not be vacated, for good cause shown. The landowner shall be notified at least ten (10) days prior to the hearing. If the Board of County Commissioners determines that the Use by Special Review has terminated and no good cause has been shown for continuing the permit, then the termination becomes final, and the Use by Special Review Permit is vacated. USR24-0011 I Gavito Page 9 of 9 June 18, 2024 DEPARTMENT OF PLANNING SERVICES 1402 North 17th Ave Greeley, CO 80631 Website: www.weld.gov Email: daungst@weld.gov Phone: (970) 400-3524 Fax: (970) 304-6498 HANNAH DUTROW 3050 67 AV SUITE 200 GREELEY, CO 80634 Subject: USR24-0011 - A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service (truck parking) outside of subdivisions and historic townsites in the A (Agricultural) Zone District. On parcel(s) of land described as: LOT A REC EXEMPT RE -4146; PART SW4 SECTION 1, T2N, R67W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on August 6, 2024 at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on August 21, 2024 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://aca- prod.accela.com/WELD/. Respectfully, Diana Aungst Planner Hello