Loading...
HomeMy WebLinkAbout660241.tiffJOI IN R. CLINE G. I.. WARD Cbicf ncpecIor DATE OF INSPECTION LOCATION INSPECTOR PTO L_ THE HARTFORD STEAM BOILER INSPECTION and INSURANCE COMPANY HARTFORD • CONNECTICUT 06102 DENVER. OFFICE 916 INSURANCE EXCIIANCE BUILDING DENVER, COLORADO 80202 August 3, 1966 REPORT OF INSPECTION July 26, 1966 Island Grove Park, Block 164, Greeley, Colorado Mr. R. S. Swanson Bryant Cast Iron Boiler, No. 1/Colo. 623-S Located: Main Building Fire Tube Loco. Boiler, No. 1/Colo. 6061-S Located: Biology Building Inspected externally. These boilers each have a low water fuel cut-out which should be thoroughly cleaned before the boiler are returned to service. The return header adjacent to boiler No. 1/Colo. 6253-S, was found to be leaking at a threaded connection. This should have the necessary attention to stop the leakage. The safety valve of Boiler No. 1/Colo. 6061-S is a type that is not considered, by Colorado State law, to be satisfactory for this service and it is recommended that it be replaced with a new A.S.M.E. steam safety valve of the side discharge type, having a minimum relieving capacity of 715 lbs. steam per hour and should be set to open at 15 lbs. The above was discussed with Mr. Bob Mann who is in charge of the boiler, and we understand the recommendations will receive the proper attention. Yours very truly, :4 tf/A/1 Chief Inspector bow/vt Board of County Commissioners, Weld County Greeley, Colorado J 660241 „n6 A Hello