Loading...
HomeMy WebLinkAbout20240378.tiffHEARING CERTIFICATION DOCKET NO. 2024-03.B RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR23-0043, FOR OIL AND GAS SUPPORT AND SERVICE INCLUDING ESTABLISHMENTS PRINCIPALLY ENGAGED IN SERVING THE OIL AND GAS INDUSTRY (FABRICATING, INSTALLING AND MAINTAINING CONTAINMENT LINERS FOR OIL AND GAS OPERATIONS) OUTSIDE OF SUBDIVISIONS AND HISTORIC TOWNSITES IN THE A (AGRICULTURAL) ZONE DISTRICT - ECO PROPERTIES, LLC A public hearing was conducted on February 21, 2024, at 10:00 a.m., with the following present: Commissioner Kevin D. Ross, Chair Commissioner Perry L. Buck, Pro-Tem Commissioner Mike Freeman — EXCUSED Commissioner Scott K. James Commissioner Lori Saine Also present: Acting Clerk to the Board, Jess Reid Deputy County Attorney, Karin McDougal Department of Planning Services representative, Kim Ogle Department of Public Health and Environment representative, Lauren Light The following business was transacted: ._ = I hereby certify that pursuant to a notice dated December 21, 2023, and duly published December 27, 2023, in the Greeley Tribune, a public hearing was scheduled for January 31, 2024, to consider the request of ECO Properties, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR23-0043, for Oil and Gas Support and Service including establishments principally engaged in serving the oil and gas industry (fabricating, installing and maintaining containment liners for oil and gas operations) outside of subdivisions and historic townsites in the A (Agricultural) Zone District. On January 16, 2024, the Weld County Offices were closed due to inclement weather conditions and the scheduled Planning Commission hearings were rescheduled to later dates; therefore, an updated notice dated January 18, 2024, and duly published January 20, 2024, in the Greeley Tribune, rescheduled this matter to February 21, 2024, at 10:00 a.m., to allow the case to be heard by the Planning Commission on February 6, 2024. Karin McDougal, Deputy County Attorney, made this a matter of record. El Chair Ross reviewed for the applicant and the public, the procedures to follow should this case result in a tie vote due to four (4) Commissioners being present and Commissioner Freeman being excused, and Hannah Dutrow, AGPROfessionals, agreed to proceed. In response to Chair Ross, Ms. Dutrow indicated she had not had contact with any of the Commissioners regarding this case. Kim Ogle, Department of Planning Services, presented a brief summary of the proposal, the general location of the site, distance to the nearest residence, and surrounding uses. He stated cc: PL (ER /MN tco/DA/t-udhcR) O3 /2q /2.t1 2024-0378 PL2682 HEARING CERTIFICATION - ECO PROPERTIES, LLC (USR23-0043) PAGE 2 notice was sent to nine (9) surrounding property owners (SPOs), no correspondence was received, described the improvements on the site and iterated the number of employees and hours of operations. He shared, per the Development Review staff, there is an existing, permitted, agricultural access onto County Road (CR) 53; however, given the use will change upon approval of this USR, a new Access Permit must be obtained, and the access will have to be upgraded to meet current Code. He provided traffic information associated with the site, stated Development Review is requesting a Road Maintenance Agreement, and relayed a Final Drainage Report was accepted with the approval of the previous USR on the site. Mr. Ogle indicated 14 referrals were sent out, three (3) agencies responded, he entered the favorable recommendation of the Planning Commission into the record, as written, and displayed images of the site and surrounding views. Lauren Light, Department of Public Health and Environment, stated the existing residence is served by the North Weld County Water District for water, the site has an existing septic system, permitted for four (4) people and if the restroom is to be used for employees, the applicant will have it reviewed by an engineer. She relayed on -site fabrication will take place indoors, which will decrease any noise concerns, and indicated the on -site fuel tank will have secondary containment. Ms. Dutrow represented the applicant, presented a PowerPoint presentation (Exhibit E), and stated the USR permit will be for fabrication, as well as repair and storage of vehicles. She provided the general location of the site and relayed the previous USR, which has been discontinued, was for a hemp operation. She described on -site buildings, and equipment and vehicle storage locations and indicated the majority of operations occur offsite. She provided the number of employees and hours of operation and outlined how the application meets each of the Weld County Code requirements. She described the traffic associated with the site and in response to Commissioner James, clarified that fabrication means they are sizing the liners onsite. No public testimony was offered concerning this matter. ' = In response to Chair Ross, Ms. Dutrow indicated the applicant is agreeable to Conditions of Approval and Development Standards, and the Board agreed to adding the language, "up to" to Development Standard (DS) #5 (number of on -site employees). El No public testimony was offered regarding the change made to DS #5. Commissioner James moved to approve the request of ECO Properties, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR23-0043, for Oil and Gas Support and Service including establishments principally engaged in serving the oil and gas industry (fabricating, installing and maintaining containment liners for oil and gas operations) outside of subdivisions and historic townsites in the A (Agricultural) Zone District, based on the recommendations of Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards, as amended. The motion was seconded by Commissioner Buck, and it carried unanimously. There being no further discussion, the hearing was completed at 10:59 a.m. 2024-0378 PL2682 HEARING CERTIFICATION - ECO PROPERTIES, LLC (USR23-0043) PAGE 3 This Certification was approved on the 6th day of March, 2024. BOARD OF COUNTY COMMISSIONERS WELD COUNT ATTEST: i'.�_.l%e.^ J � •-�'' �e%� Weld County Clerk to the Board BY: • ttatAl.D1 JL Deputy Clerk to the Board L 1z KevjaD. Ross, Chair erry L. B,ck, Pro-Tem EXCUSED 2024-0378 PL2682 ATTENDANCE LIST Z/Zt /2--} ?3 i NAME - PLEASE PRINT LEGIBLY ADDRESS (CITY, STATE ZIP) EMAIL > T f I tNG BQ / Bat ct. L.n 1 IL, Co DULL 5v'W 2 CO 806,4.,,,,eDe l►� ,e1,--ase.c.0.or, i PS 'oe- 0„,,, , o c. V_ Sot .6-1---r Go SO a -X e�kC a b v►(b .otfi t,)ec� )(es k k4,t4 C K I e ilk li. \ ,„,,, Go,,u2, v000,0 1-- Zoo ? q Gg., y /./.4.41°,`..9 z A-0,t)30T-Ifil kr) (i)(214 ? e.r i.v A, l\re_ CC .0.21.A. T kr. d�-Q-it, �N ? <--)Aiii.... 140i /ee/ iY7# fa 3:. ,,..ra eh./�w�..,,J. co., a y1 6Pri2q Lic>✓od1l also �� ►4�,e�I, '4.4 V. -lbw -Ili -rte -loop_ a� y q-rm�@ lo14sf.�..m. „-..,f Tic 7 h 1 l _Mi € G (2 t�lne.� S H6' -f75 Co,,,1-y fool Zq MiChatIG.ru0,),..115C'', I100•63., Gut YeS Ildiblem C M& 15O e ewe E A- attiza Uih p,A C oultereRECik v-brWrvllaW • Week Ye,/ Y Cam N 1 '•- A r 7 M L��Y�t� 13 , wEt5 Pe. C k nc f r �? dre i i 6,,,,, l� - co , Bo..) dc, \I c 5 ,.) - �3gS9 cc, a$1, (-_,,,,,;163' dcp„Y Q �,,,L.-C tvzI d t5 () L W t er ,' ti no - 4 •. 1..ckeri 133 wcri b t oth19.re p i2 i � %()J euCL.ri 1, � C �Oc �v; @, ovq "I Wel4 f� �C, .m� a4f�/,,, id ({ ir (4,94-, / 'call-,., Q :A-4- ma i .@___Tn aj. w -.0 8, cg E0U—D 00k- 33Oc1 18- W ,...1 -COW Wo 41 rcD :O GULUtzi ?/ v o Ca (Atli 6 tw.ovk 1310o I 3 to 6 Laity i0 9 (0.).Yt tc ol -ll 6O-lat. can II ) i AA. ; s 4mo A,vrt f/ , q 75'/ c. Ro Y if v0S,7.., c. CAS•Fi LQAvr@,...., • Ga..s ,,,z.3-1. VC ---S 44000 laL(1 306-0 (P7 ATV �- CD 1-f'1JUr2ow @ AGPP-0S 0 I,U6‘i Y r, `iw ke.in S51S 6 C ' Cott -M., CD Tr pi A--i.UN wit, l$I , 700 ,, 3 /,-3 kW( z2. G'' `c" r 6J e c 1 No ATTENDANCE LIST 212.1►zU �z NAME - PLEASE. PRINT LEGIBLY Let LA Clt, f 5 La* b/ OvA 133b 14{.41 3k`L ``Ay 42 40de /3 3 t7 /}-/39zw4 Hello