Loading...
HomeMy WebLinkAbout20242747.tiffNotice The Board of County Commissioners of Weld County, Colorado, on October 23, 2024, conditionally approved a Site Specific Development Plan and Use by Special Review Permit, USR24-0012, for the property and purpose described below. Conditional approval of this plan creates a vested property right, pursuant to Article 68 of Title 24, C.R.S., for a period of three years. The complete case file may be examined in the office of the Clerk to the Board of County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. The Clerk to the Board's Office can be contacted at (970) 400-4226 or egesick@weld.gov. Docket #: 2024-54 Applicant: Janus Solar, LLC 16730 Creek Bend Drive Sugarland, Texas 77478 Legal Description: The Solar Facility encumbers the W1/2 NW1/4 of Section 30, Township 1 North, Range 62 West; the SW1/4 of Section 24; the NE1/4 and the N1/2 SW1/4 of Section 25; and Lot B of Corrected Recorded Exemption, RECX11-0028, located in part of the NW1/4 of Section 25, Township 1 North, Range 63 West of the 6th P.M., Weld County, Colorado Type and Intensity of Approved Use: For a 1041 Major Facility of a Public Utility, including an 80 megawatt AC Solar Energy Facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System), a step-up substation, transformer and maintenance facilities, and a 115kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic townsites in the A (Agricultural) Zone District Size of Parcel: 700 acres, more or less Failure to abide by the terms and conditions of approval will result in a forfeiture of the vested property right. Board of County Commissioners Weld County, Colorado Dated: November 6, 2024 Published: November 8, 2024, in the Greeley Tribune Notice Prairie Mountain Media, LLC PUBLISHER'S AFFIDAVIT County of Weld State of Colorado The undersigned, Ascent , being first duly sworn under oath, states and affirms as follows: 1. He/she is the legal Advertising Reviewer of Prairie Mountain Media LLC, publisher of the Greeley Tribune. 2. The Greeley Tribune is a newspaper of general circulation that has been published continuously and without interruption for at least fifty-two weeks in Weld County and meets the legal requisites fora legal newspaper under Colo. Rev. Stat. 24-70-103. 3. The notice that is attached hereto is a true copy, published in the Greeley Tribune in Weld County on the following date(s): Nov 8 202 Signature (ts't Subscribed and sworn to me before me this (SEAL) day ofWIQ 11O SHAYLA NAJERA NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20174031965 MY COMMISSION EXPIRES July 31, 2025 Account: 1099690 Ad Number: 2084583 Fee: $19.00 Notice Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be held before the Board of County Commissioners in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631, at the time specified below. The complete case file may be examined by calling the Department of Planning Services at (970) 400-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. Email messages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of any correspondence prior to the Board of Commissioners hearing, email egesick@weld.gov. If a court reporter is desired for this hearing, please advise the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the requesting party. In accordance with the Americans with Disabilities Act, if special accommodations are required in order for you to participate in this hearing, please contact the Clerk to the Board's Office at (970) 400-4225, prior to the day of the hearing. All cases scheduled before the Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact the Clerk to the Board's Office at the number above, for hearing continuance information. The application may be updated at any time at the request of the applicant, or in response to public input, referral responses, or staff recommendations. During the public hearing process, the Board of County Commissioners reserve the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number: 2024-54 Board of Commissioners Date: October 23, 2024 Time: 10:00 a.m. Case Number: USR24-0012 Applicant: Janus Solar, LLC Planner: Diana Aungst Request: A Site Specific Development Plan and Use by Special Review Permit for a 1041 Major Facility of a Public Utility, including an 80 megawatt AC Solar Energy Facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System), a step-up substation, transformer and maintenance facilities, and a 115kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic townsites in the A (Agricultural) zone District. Legal Description: The Solar Facility encumbers the W2 NW1/4 of Section 30, Township 1 North, Range 62 West; the SW1/4 of Section 24; the NE1/4 and the N1/2 SW1/4 of Section 25; and Lot B of Corrected Recorded Exemption RECX11-0028 located in part of the NW1/4 of Section 25, Township 1 North, Range 63 West of the 6th P.M., Weld County, Colorado. Location: East of and adjacent to County Road 71; 0.5 miles south of County Road 8; 0.75 miles west of County Road 75 Section Line; 0.25 to 0.5 miles north of County Road 4. (See Legal Description for precise location) Size: 700 acres, more or less Dated: October 4, 2024 Published: October 9, 2024, in the Greeley Tribune Notice Pursuant to the zoning laws of the State of Colorado and the Weld County Code. a public hearing will be held before the Board of County Commissioners in the Nearing Room, Weld County Administration Building, 1150 O Street, Greeley. Colorado 80631 at the time specified below. The complete case file may be examined by calling the De• partment of Planning Services al (970) 400.6100 to make ar- rangements with the case planner. or 41 the office of the Clerk to the Board of County Commissioners, Weld County Administra- tion Building, 1150 O Street Greeley, Colorado 80631. Email mes- sages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of any correspondence prior to the Board of Commissioners hearing, email egesickel, wed. goy. If a court reporter is desired for this hearing, please advise the Clerk to the Board's Office. in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be tnwne by the requesting party. In accordance with the Ameri- cans with Disabilities Act, If special accommodations are re- quired in order for you to participate In this hearing, please con- tact the Clerk to the Board's Office at (970) 400-4225 prior to the day of the hearing. All cases scheduled before the Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact the Clerk to the Board's Office at the number above, for hearing continuance information. The application may be updated at any time at the request of the ap- plicant. or in response to public input referral responses, or staff recommeei letions. During the public hearing process the Hoard of County Commissioners reseive the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number: 2024.54 Board of Commissioners Date: October 23, 2024 Time: 10:00 a.m. Case Number: USR24.0012 Applicant: ?anus Solar, RC Planner: Diana Aungst Request: A Site Specific Development Plan and Use by Special Review Permit for a 1041 Major Facility of a Public Utility, includ- ing an 80 megawatt AC Solar Energy facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System). a step-up substation, transformer and maintenance facilities and a 115kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic towasites in the A (Agricultural) zone District. Legal Description: The Solar Facility encumbers the W2 NWI/4 of Section 30, Township 1 North, Range 62 V/est• the SWI/4 of Section 24; the NE 1/4 and the Nl/2 SWl/4 of Section 25; and Lot H of Corrected Recorded Exemption RECX11-0028 located in part of the NW1/4 of Section 15 Township 1 North, Range 63 West of the 6th P.M., Weld County, Colorado. Location: East of and adjacent to County Road 71; 0.5 miles south of County Road 8. 0.75 miles west ofCountyRoad 75 Sec• tion line; 0.25 to 0.5 miles north of County Road 4. (See legal Description for precise location) Size: 700 acres, more or less Dated: October 4. 2024 Published: October 9, 2024, in the Greeley Tribune - 2079020 Prairie Mountain Media, LLC PUBLISHER'S AFFIDAVIT County of Weld State of Colorado The undersigned, A(lenf , being first duly sworn under oath, states and affirms as follows: 1. Welshe Is the legal Advertising Reviewer of Prairie Mountain Media LLC, publisher of the Greeley Tribune. 2. The Greeley Tribune is a newspaper of general circulation that has been published continuously and without interruption for at least fifty-two weeks in Weld County and meets the legal requisites for a legal newspaper under Colo. Rev. Stat. 24.70.103. 3. The notice that is attached hereto Is a true copy, published in the Grcoloy Tribune in Weld County on the following date(s): Oct 9, 2024 Signature S scribed ands to r e be ore me this day of 211)2.-q. Notary Public (SEAL) • SHAYLA NAJERA NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20174031965 MY COMMISSION EXPIRES July 31, 2025 Account: Ad Number: Fee: 1099981 2079020 529.50 Notice Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be held before the Weld County Planning Commission and the Board of County Commissioners in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631, at the times specified below. The complete case file may be examined by calling the Department of Planning Services at (970) 400-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. Email messages sent to an individual Commissioner may not be included in the case file. To ensure inclusion of your Email correspondence into the case file prior to the Planning Commission hearing, please call the Department of Planning Services to obtain the appropriate contact information. For inclusion of any correspondence prior to the Board of Commissioners hearing, email egesick@weld.gov. If a court reporter is desired for either hearing, please advise the Department of Planning Services or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the requesting party. In accordance with the Americans with Disabilities Act, if special accommodations are required in order for you to participate in this hearing, please contact the Department of Planning Services at (970) 400-6100, or the Clerk to the Board's Office at (970) 400- 4225, prior to the day of the hearing. All cases scheduled before the Planning Commission or Board of County Commissioners are subject to continuance, due to lack of quorum or otherwise. Contact the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing continuance information. The application may be updated at any time at the request of the applicant, or in response to public input, referral responses, or staff recommendations. During the public hearing process, the Planning Commission and Board of County Commissioners reserve the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number: 2024-54 Planning Commissioners Date: October 1, 2024 Time: 1:30 p.m. Board of Commissioners Date: October 23, 2024 Time: 10:00 a.m. Case Number: USR24-0012 Applicant: Janus Solar, LLC Planner: Chris Gathman Request: A Site Specific Development Plan and Use by Special Review Permit for a 1041 Major Facility of a Public Utility, including an 80 megawatt AC Solar Energy Facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System), a step-up substation, transformer and maintenance facilities, and a 155kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic townsites in the A (Agricultural) zone District. Legal Description: The Solar Facility encumbers the NW1/4 of Section 30, Township 1 North, Range 62 West; and the SW1/4 of Section 24, Lot B of Corrected Recorded Exemption RECX11-0028 located in part of the NW1/4 of Section 25, Township 1 North, Range 63 West as well the N1/2 SW1/4 of Section 25, Township 1 North, Range 63 West of the 6th P.M., Weld County, Colorado. Location: East of and adjacent to County Road 71; 0.5 miles south of County Road 8; 0.5 miles west of County Road 75 Section Line; 0.5 to 1 mile north of County Road 4. (See Legal Description for precise location) Size: 700 acres, more or less Dated: September 16, 2024 Published: September 18, 2024, in the Greeley Tribune Notice Pursuant �too the zoning laws of the State of Colorado and the County Planning Commissionnandwthe Board of County Commissioners in the Hearing Room, Weld County Administra- tion Building, 1150 0 Street, Greeley, Colorado 80631, at the times specified below. The complete case file may be examined by calling the De- partment of Planning Services at (970) 4004500 to make ar- rangements with the case planner, or at the office of the Clerk to the Board of County Commissioners, Weld County Administra- tion Building, 1150 0 Street Greeley, Colorado 80631. Email mes- sages sent to an individual Commissioner may not be included in the case file. To ensure Inclusion of your Email correspond- ence into the case file prior to the Planning Commission hearing, please call the Department of Planning Services to obtain the appropriate contact information. For Inclusion of any corre- spondence prior to the Board of Commissioners hearing, email egesick@weldtgpg, If a court reporter is desired for either hearing, please ad• vise the Department of Planning Services or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter shall be borne by the re- questingiparty. In accordance with the Americans with Disabili- ties Act, f special accommodations are required in order for you to participate in this hearing, please contact the Department of Planning Services at (070) 400-6100, or the Clerk to the Board's Office at (970) 400-4225, prior to the day of the hearing. All cases scheduled before the Planning Commission or Board of County Commissioners are subject to continuance, due to lack of quo- rum or otherwise. Contact the Department of Planning Services or the Clerk to the Board's Office at the numbers above, for hearing continuance information. The application may be updat- ed at any time at the request Of the applicant, or in response to public input, referral responses, or staff recommendations, Our. lag the public hearing process, the PlanningCommission and Board of County Commissioners reserve the right to amend the findings, conditions of approval, and/or development standards in the proposed resolution. Docket Number 2024-54 Planning Commissioners Date: October 1, 2024 Time: -1:30 p.m. Board of Commissioners Date: October 23.2024 Time: 10:00 a.m. Case Number U5R24-0012 Applicant: Janus Solar, LLC Planner. Chris Gathman Request: A Site Specific Development Plan and Use by Special Review Permit for a 1041 Major Facility of a Public Utility, includ- ing an 80 megawatt AC Solar Energy Facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System), a step-up substation, transformer and maintenance facilities, and a 155kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic townsites In the A (Agricultural) zone District. Legal Description The Solar Facility encumbers the NW1/4 of Section 30, Township 1 North, Range 62 West and the SW1/4 of Section 24, Lot B of Corrected Recorded Exemption RECX11.0028 located in part of the NW1/4 of Section 25, Township 1 North, Range 63 West aswellthe 141/2 SW1/4 of section 25, Township 1 North, Range 63 West of the 6th P.M., Weld County Colorado, Location: East of and adjacent to County Road 71: 0.5 miles south of County Road 8; 0.5 miles west of County Road 75 Sec- tion Line: 0.5 to I mile north of County Road 4. (See Legal De- scription for precise location) Size: 700 acres more or less Dated: September 18, 2024 Published: September 18, 2024, in the Greeley Tribune - 2075391 Prairie Mountain Media, LLC PUBLISHER'S AFFIDAVIT County of Weld State of Colorado The undersigned, Anent , being first duly sworn under oath, states and affirms as follows: 1. He/she is the legal Advertising Reviewer of Prairie Mountain Media LLC, publisher of the Greeley Tribune. 2. The Greeley Tribune is a newspaper of general circulation that has been published continuously and without Interruption for at least fifty-two weeks in Weld County and meets the legal requisites for a legal newspaper under Colo. Rev. Stat. 24-70-103. 3. The notice that is attached hereto is a true copy, published in the Greeley Tribune in Weld County on the following date(s): Sep 18, 2024 n to me before me this Subscribed and s f (SEAL) day of SHAYLA NAJERA NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20174031965 MY COMMISSION EXPIRES July 31, 2025 Account: Ad Number Fee; 1099981 2075391 534.00 1. PLANNING COMMISSION & BOARD OF COUNTY COMMISSIONERS SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS 9/20/2024. THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF- WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FORA USE BY SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POSTA SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, CHRIS GATHMAN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST 10 DAYS BEFORE THE BOARD OF COMMISSIONERS HEARING FOR USR24-0012 IN THE AGRICULTURAL ZONE DISTRICT. Chris Gathman Name of Person Posting Sign Signature of Person Posting Sign STATE OF COLORADO ) ss. COUNTY OF WELD ) The foregoing instrument was subscribed and sworn to me this /'7"2day of mitaii Pica 2024. WITNESS my hand and official seal. �, r rNteitenvil Notary Public Lill My Commission Expires: fr/S-7; KRISTINE RANSLEM NOTARY PUBLIC STATE OF COLORADO NOTARY ID 20124034827 MY COMMISSION EXPIRES JUNE 05, 2028 Public hearings concerning this property will be heard before the County Planning Commission and Board of County Commissioners. Both hearings will be held at: A Site Specific Development Plan and Use by Special Review Permit, for a 1041 Major Facility of a Public Utility, including an 80 megawatt AC Solar Energy Facility (SEF) on 700 acres, a 20 megawatt AC BESS (Battery Energy Storage System), a step-up substation, transformer and maintenance facilities, and a 155kV electrical line connection to the existing Sand Creek Switching Station outside of subdivisions and historic townsites in the A (Agricultural) Zone District. FOR FURTI-fER INFORMATION PLEASE CONTACT C. .ns AT THE WELD COUNTY DEPARTMENT OF PLANN NG SERVICES, AT 970-400-1OQC A77ENPCXt: &oporedCondi:torn n out no, 'Wolfed to rhr nunton olall ttlps are subject to change or led to this Sac Specific Dew/opener,: Plan an p the by Special A .able t'mployttt hours of operation. urcenins and number of limn lnt both me Pktnnuu7 Co mmtsuon and 8ottd cIcaunryC �•�1 '�i≥ il��d l •!I �i�r± �\r ., • .r. '• ' t Ir' *el nt%-, i� �. ' / 1 r�iY� } •• '=i ✓ �'~ r. '�,' �41!'i l 're yit I�rt �1 r1�.y (...`\_;II Y \.1+�• •., ! 1 . •Y r {R ( . '� '341 'I, ; ,•R .• ,, t 1 -qtr --•-•• ./ . I. .1 ! s ar .^ r M y •. ae r — t - t i t r I 1 l r t• •'+ I rrils�d '1." 1. .. •Jrnl•� .1 140 , —: � t l• .,� r / • - .t•47 L. / 1 ff /rr/ ♦'el 7P ald . s concerning this property will be heard before the Public hearings Planning Commission and Board of County Commissioners. Both hearings will be held at: MINISTRATION BUILDING COUNTY AD CO 806 WELD "O" Street • Greeley, 1150 1 will be held on Planning Commission Hearing GT 2014; at Mot ( will be held on f County Commi ssioner Hearing Board o 20.1-; at Applicant: I and U Yb Special Request: plan or a public SEF)y, — A Site Specificfor Development Facility Facility for a 1041 Major Energy Energy SO megawatt AC Solar (Battery Facility er and — Review Permit, a 20 megawatt AC transformer including an up substation, electrical lint �- — on 700 acres, a Step, 5ta kV electran Cation Storage System),ait and a 15 k Switching S ce facilitiest d Creek the A Maintenance the existing San �vnsites — In connection to d historic to — outside of subdivisions District. f7� (Agricultural) Ages: Nurnber: aA` 0NTACT Case TION PLEASE C I TMENT OF R INFORMATION DEPA FOR FURTH WELD AT THE Loll r _. nitil G SERVICES, AT 970 -400 -x --d 1 4 t nut >flr Wait OV•rtOptillot Plit, in Vie !peon gr. ir girl:0TO%NW', CduPrwfan, itteritluct bimitiind" urn tee dal PitlisiOn9 CpomItlI 7n yl ut to Hello